My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_EW-5 INSTALL PERMIT PACKAGE 2/14/25
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2026 Reports
>
COMPLIANCE INFO_EW-5 INSTALL PERMIT PACKAGE 2/14/25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 9:40:07 AM
Creation date
7/18/2025 8:30:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
EW-5 INSTALL PERMIT PACKAGE 2/14/25
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arcadis Heat Illness Prevention Plan (HIPP) <br />HASP Supplement <br />Access to Shade Continued <br />5. In situations where it is not safe or feasible to provide shade, the SSO will document in the HASP <br />Supplement the unsafe or unfeasible conditions, and include the steps taken to provide alternative <br />cooling measures equivalent to shade. <br />Unsafe/unfeasible conditions: <br />Other: <br />Monitoring of Weather and Heat Index Table <br />1. The SSO or designee must check the extended weather forecast in advance of the upcoming <br />work on a weekly basis. Work schedules will be adjusted in advance, taking into consideration <br />whether high temperatures or a heat wave is expected. <br />Accepted weather forecasting resources include webpages "NOAA.gov" or "weather.com" or see the <br />NIOSH Heat Tool (formerly the OSHA Heat Tool app) <br />Alternative Cooling Measures Implemented: <br />X <br />Provide vehicles with working air conditioner to all employees for rest breaks / recovery breaks / <br />meal breaks. <br />Provide temporary or mobile shade structure(s) that are either ventilated or open to air <br />movement (Secure against wind.) <br />Provide a building / permanent structure(s) in close proximity to the work area with a cooling <br />environment via mechanical ventilation or open to air movement which will be used for shade. <br />(Job trailer, pavilion, manufacturing building, etc.) <br />https://www.cdc.gov/niosh/topics/heatstress/heatapp.html <br />2. Before work starts for the day or shift, the SSO will review the forecasted temperature and <br />humidity for the (exterior) work site and compare conditions against the National Weather Service <br />Heat Index (below) to evaluate the risk level for heat illness. Determination will be made of whether <br />or not workers will be exposed to a combination of temperature and humidity characterized as <br />"Caution", “Extreme Caution”, "Danger" or “Extreme Danger” for heat illnesses. <br />NOTE: It is important to know the temperature at which these warnings occur. When working <br />outdoors see the Heat Index Table in this supplement for Action Level specific instructions for <br />hazard controls. <br />3. Where state regulations indicate a thermometer or similar on-site monitoring device will be used <br />at the job site to monitor for sudden increases in temperature. The SSO will be responsible for <br />obtaining a thermometer/weather station prior to the start of work and make it readily visible / <br />accessible where it can easily be monitored throughout the course of the day. <br />NOTE: If the temperature is >80°F (26 C) shade structures will be opened and made available to <br />workers. If temperature is >95° F (35 C) additional preventive measures will be implemented. <br />Rev 8 13 June 2019
The URL can be used to link to this page
Your browser does not support the video tag.