My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_EW-5 INSTALL PERMIT PACKAGE 2/14/25
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2026 Reports
>
COMPLIANCE INFO_EW-5 INSTALL PERMIT PACKAGE 2/14/25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 9:40:07 AM
Creation date
7/18/2025 8:30:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
EW-5 INSTALL PERMIT PACKAGE 2/14/25
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />arcadis.com <br />Waste Containerization and Sampling JSA_pv <br />Page: <br />4/4 <br />TEAM Chevron - Job Safety Analysis <br />JSA Acknowledgement <br />“I have read this JSA, and I understand the hazards and safe work practices associated with the task . <br />If conditions change or an additional hazard is recognized, I will Stop Work and notify the Site H&S Officer immediately :” <br /> <br />This JSA must be acknowledged by affected workers every shift. <br />Name Signature Initials Used on Form Date Date Date <br />PMCoW: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Verification of Critical Actions – Undersigned verifies that critical actions are in place, or have been evaluated based on availability, effectiveness <br />and understood by the crew prior to work starting. <br />Name of Verifier Signature Date Date Date <br /> <br /> <br />End of Day Lookback – Use this section to log changes made to the JSA throughout the day and note any recommendations for Task JSA. <br />Brief description Lookback Lookback Leader Name Date <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.