Laserfiche WebLink
CDCR SI Phase 2: Plume Mass Delineation <br />• Resample Phase 1 soil vapor probes installed <br />near the central portion of the CDCR Property. <br />• To further delineate the VOC plume mass in <br />the central portion of the CDCR property, <br />advance five (5) additional CPT boring <br />locations, collect grab GW samples from <br />shallow zone and select intermediate zones, <br />and install/sample multi-depth SV probes. <br />• Schedule: Begin fieldwork late Oct (earliest). <br />• Potential well installations based on findings, <br />collect soil samples if necessary.