Laserfiche WebLink
12" Diameter <br />drilled hole <br />Portland Grout <br />Neat Cement <br />Monument <br />with bollards <br />NA <br />40 <br />55 <br />60 <br />60 <br />0.1 <br />0.0 <br />0.1 <br />0.0 <br />ML <br />ML <br />SC <br />(0.0-5.0') Hand Auger to 5.0 ft bgs. <br />(5.0-11.0') Sandy SILT, no plasticity, no dilatancy; stiff; <br />30-35% sand, very fine to medium grained; subangular to <br />subrounded; 5-10% gravel; 2-10 mm; dry; pale brown <br />(10YR 6/3). <br />(11.0-18.0') Sandy SILT, no plasticity, no dilatancy; <br />20-25% sand, very fine to fine grained; 5-10% clay; dry; <br />medium stiff; brown (10YR 4/3); <br />(18.0-32.0') Clayey SAND, very fine to medium grained, <br />subangular to subrounded; 10-15% clay; 5-10% silt; <br />loose; dry; yellowish brown (10YR 5/4); iron staining at 24 <br />ft. <br />HA <br />Core Barrel <br />Continuous from 60' bgs <br />Yes No <br />NA <br />NA <br />NA <br />bgs= below ground surface; ' / ft= feet; HA = Hand Auger; '' / in. = <br />inch; ppm= parts per million; NA= not applicable / available. Hand <br />Auger to 5' bgs. <br />Sampling Method: <br />Sampling Interval: <br />Water Level Start (ft. bgs.): <br />Water Level Finish (ft. btoc.): <br />Converted to Well: <br />Surface Elev: <br />North Coor: <br />East Coor: NA <br />Drilling Co.: <br />Driller: <br />Drilling Method: <br />Drilling Rig: <br />Remarks: <br />ABC Drilling <br />Jamie Moore <br />Hollow Stem Auger <br />CME-95 <br />NA <br />Boring No.: CDCR­EW-1 <br />Sheet: 1 of 4 <br />Project Name: <br />Project Number: <br />Project Location: <br />Forward Landfill-CDCR <br />30129458 <br />Stockton, CA <br />Date Started: <br />Date Completed: <br />Marshall Brusca <br />J. Cortez, J. Michel <br />NA <br />Construction <br />Details <br />05/05/2022 <br />05/05/2022 <br />Logger: <br />Helpers: <br />Weather Conditions: <br />Boring and Well Construction Log <br />Recovery <br />(in.) <br />PID <br />(ppm)Sample ID USCS <br />Code <br />Geologic <br />Column Description WellDepth <br />(feet) <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />Drive <br />Interval <br />Lab <br />Sample <br />Interval <br />FORWARD LF C:\USERS\RGI00960\ARCADIS\GEC INDIA ENV ANA TEAM - SSV - 1. PROJECT FILES (ALL PORTFOLIOS)\ANA\FORWARD LANDFILL BOREHOLE LOG AND WELL CONSTRUCTION DIAGRAMS\D-PROJECTWORKING_\D02-DRAWINGS\FORWARD LF PROJECT.GPJ FORWARD LF.GDT 26/10/226" Sch 40 PVC <br />Well Casing