Laserfiche WebLink
2 Secondary Containment Pipe and Two-Piece Fittings <br /> Standard Secondary Containment Piping Systems <br /> Primary Pipe Size Minimum Containment Pipe Size for Red Minimum Containment Pipe Size for <br /> Thread & Green Thread Primary Pipe Centricast RB& CL and Z-Core Primary Pipe <br /> in mm in <br /> 1 3 <br /> 1 V2 3 <br /> 2 34) 3a> <br /> 3 441 44) <br /> 4 641 6111 <br /> 6 8 8 <br /> 8 10 101=1 <br /> 10 12 12 <br /> 12 14 14 <br /> 14 16 16 <br /> M When using 2",3",or 4"sweep fittings,use containment pipe and fittings that are two diameter sizes larger than the primary.Contact the factory for recommendations. <br /> ("When using 8"90•elbows,12"containment 90^elbows maybe needed.Contact factory for recommendations. <br /> NOTE:When using 3"90'elbows,6"containment 90'elbow maybe needed.Contact the factory for recommendations. <br /> NOTE:Primary couplings must be installed inside of secondary containment coupling fittings. <br /> Installation Air Testing <br /> Refer to installation man ua Is for instructions. Hydrostatic test should be used instead of air or compressed <br /> NOTE:It is highly recommended that assembly training be conducted gas if possible. When air or compressed gas is used for testing, <br /> by a factory representative priorto installation start up, tremendous amounts of energy can be stored in the system. If a <br /> failure occurs, the energy may be released catastrophically, which <br /> When connecting containment pipeand fittings,plain ends ofthe can result in property damage and personal injury. In cases where <br /> containmentpipe are machined orthoroughlysanded to acceptthe system contamination orfluid weight prevents the use of hydrostatic <br /> two-piece contain mentfitting.Containmentpipe mustbe positioned test, air test may be used with extreme caution. To reduce the risk <br /> overthe primary piping before assembly and bonding of the primary of air testing, use the use the table below to determine maximum <br /> pipe system.The size of the containment fittings may dictate the <br /> minimum centerlinedimensionsfortheprimarypiping. pressure. When pressurizing the system with air or compressed <br /> gas,the area surrounding the piping must be cleared of personnel <br /> Upon completion of a successful primary pipetest procedure,the to prevent injury. Hold air pressure for one hour,then reduce the <br /> two-piece secondary containment fittings may be installed.They pressure to one half the original. Personnel can then enter the area <br /> are installed usingthreaded inserts embedded in thefittings and to perform soap test of alljoints.Again, extreme caution must <br /> the hex-head boltssupplied by NOV Fiber Glass Systems.A system- be exercised during air testing to prevent property damage or <br /> matching adhesive must be applied to all bonding su rfacesjust priorto <br /> beingjoinedbythe bolts.Thesecondary containment system must be Personnel injury. If air or compressed gas testing is used, NOV Fiber <br /> given timeforthe adhesiveto properly cure before testing the annular Glass Systems will not be responsible for any resulting injury to <br /> space. personnel or damage to property, including the piping system. Air or <br /> compressed gas testing is done entirely at the discretion and risk of <br /> The testingof secondary containment piping systems is recommended management at the job site. <br /> to ensure the integrity ofthe pipe,fittings andjoints of all types.The <br /> introduction of the testfluid during testing should becontrolled to Maxi mum Allowable Air Test Pressure - <br /> preventsudden pressuresurges(Water Hammer).WaterHammercan <br /> produce pressures that greatly exceed recommended system test Containment Pipe size 3"-8" 10" 12"-16" <br /> pressure. Pressure,psig 15 10 s <br /> WARNING:These procedures must be followed to avoid serious personal injury or <br /> property damage.Failure to do so will result in loss of warranty.Buyer,installer or any <br /> employee,agent or representative thereof assumes the risk of any damage or injury to <br /> person or property. <br /> Testingwith ai ror gas can be extremely dangerous.Review safety precautions before <br /> starting thetest and follow a[[testing procedures. <br /> Fiber Glass Systems I Key P n Solutions <br />