My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
345
>
2300 - Underground Storage Tank Program
>
PR0540987
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 8:58:15 PM
Creation date
8/1/2025 4:53:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0540987
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0023459
FACILITY_NAME
Flying J Travel Center Lathrop - 1017
STREET_NUMBER
345
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
French Camp
Zip
95231
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
345 Roth RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01(f)) PE]IRP1200-12 <br /> 6.2.1 Purpose. This method is used to test the 5.If the spill bucket is found to have cracks,loose <br /> integrity of single-walled spill buckets or the pri- pains or separation of the bucket from the fill <br /> wary containment of secondarily contained spill pipe,it is not considered to be liquid-tight.This <br /> buckets. visually indicates a test failure. <br /> 6.2.2 Description of Test. The spill bucket is NOTE: If the pill cap is not included in the <br /> filled with water.The water level is measured at the spill bucket test.and/or the cap is not tight,it <br /> beginning and end of the test. could be the source of potential fuel contarni- <br /> 6.2.3 Test Equipment. Test equipment shall nation from water intrusion. <br /> include: <br /> NOTE: Before permanently plugging, ensure <br /> water; that local regulations allow the drain valve to <br /> • measuring stick that is accurate to within 1/16 be permanently plugged. <br /> (4.063) inch and of sufficient length; <br /> plumber's plug(appropriate site, if used); 6.2.5 Test Procedure. <br /> • stopwatch or other time-measurement device 1.Add water to the spill bucket to a level within <br /> capable of measuring a 1-second increment. 1.5 inches of the top of the spill bucket.Allow <br /> the water to settle for 5 minutes before the initial <br /> 6.2.4 Preparation. water level measurement is taken. <br /> 1.Care should be taken when conducting the test 2.Place the measuring stick vertically at the lowest <br /> in the rain or during freezing weather condi- point in the spill bucket and extending above the <br /> tions. water level to allow for an accurate measure- <br /> 2.Remove and properly dispose of any liquid and merit to be taken,The location of the measuring <br /> debris (leaves, sediment and trash) in the spill stick must remain the same for each water level <br /> bucket. Clean the spill bucket and examine it for measurement. Document the initial water level <br /> damage,defects or improperly installed compo- measurement as measured from the bottom of <br /> nents. If there are inose components (e.g., loose the spill bucket.Alternative measurement meth- <br /> band clamps or bolts),tighten these items before ods may be used provided that measurement to <br /> conducting the integrity test. If there are items 1116(0.463) inch can be made, <br /> that must be repaired or replaced(e.g., deterio- 3.Take all precautions to prevent the water level <br /> rated gaskets/seals or drain valves), notify the from being disturbed during the duration of the <br /> owner/operator. test. <br /> 3.Examine the fill cap and adapter fitting for 4.After 1 hour, document the ending water level <br /> loose, missing or damaged parts, and make measurement. <br /> necessary repairs. Complete any repairs before g.Upon completion of the test, remove and dis- <br /> putting water in the spill bucket,Make sure that <br /> the seal an the fill cap is present and in good Pose of the water according to Section 6.7, and <br /> condition.The cap must fit securely and be leak- it <br /> the inside of the spill buckeC before returning <br /> it to service. <br /> tight on the riser.The water level during the test <br /> typically will be above the cap,so a leaking cap 6,2,6 Pass/Fall Criteria. If the water level has <br /> will result in a failed test.As an alternative to a dropped less than 118 (0.125)inch,the spill bucket <br /> tight till cap,use a plumber's plug in the fill riser passes the integrity test. <br /> if approved by the authority having jurisdiction <br /> (AH1) and tank owner. If the water level has dropped 118 {0,125} inch or <br /> greater,the spill bucket fails the integrity test. <br /> 4,The spill-bucket drain valve, if present, most <br /> be leak-tight to pass the test. If it is not leak- 6.3 Spill Bucket Integrity Testing — Vacuum Test <br /> tight, it may he possible to simply remove and Method. <br /> permanently plug the drain valve. However, if <br /> you choose to permanently plug,ensure that the 6.3.1 Purpose. This method is used to test the <br /> local regulations allow this modification. integrity of single-walled spill buckets or the pri- <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.