My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
345
>
2300 - Underground Storage Tank Program
>
PR0540987
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 8:58:15 PM
Creation date
8/1/2025 4:53:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0540987
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0023459
FACILITY_NAME
Flying J Travel Center Lathrop - 1017
STREET_NUMBER
345
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
French Camp
Zip
95231
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
345 Roth RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I�) PEIIRP1200-12 <br /> there are items that must be repaired or replaced 6.5.6 Test Procedure. <br /> (e.g., deteriorated penetration fitting boots), 1.Begin the test by adding water to the sump to a <br /> notify the owner/operator and obtain approval minimum of 4 inches above the highest stamp <br /> prior to proceeding with repairs. penetration or sump sidewall seam-,whichever is <br /> 4.Test hoots or secondary containment termina- higher. To compensate for sump deflection, the <br /> tion fittings must be present on the piping pen- water must be allowed to settle a minimum of <br /> etrating the sump. During testing, these fittings 15 minutes before taking the initial test measure- <br /> prevent water from entering the interstitial space went. If the highest sump penetration or sump <br /> of double-walled piping. Without these fittings, sidewall seam is less than 4 inches from the top <br /> the integrity of the sump cannot be tested using of the sump, add water to within 1 inch of the <br /> this method. top of the sump. <br /> 5.if interstitial monitoring sensors are present 2.Place the measuring stick vertically at the lowest <br /> within the containment sumps, temporarily point in the sump and extending above the water <br /> remove them before conducting the test. Iti the level in the sump to allow for au accurate mea- <br /> sensor is removed, reposition after testing to surement to be taken.The location of the mea- <br /> appropriate position according to the manufac- suring stick must remain the same for each water <br /> turer's instructions. level measurement. Document the initial water <br /> 6.If the containment sump is found to have cracks, level measurement as measured from the bottom <br /> loose parts or separation of any joints or penetra- of the sump. Alternative measurement methods <br /> tion fittings, it is not considered to be liquid- may be used provided that the measurement to <br /> tight.This visually indicates a test failure. 1116 (0.663)inch can be made. <br /> 3.Take all precautions to prevent the water level <br /> CAUTION: Water can damage electrical from being disturbed during the duration of the <br /> connections. Ensure that there are no test. <br /> components that can be damaged by the 4.After 1 hour, document the ending water level <br /> addition of water to the sump. If such measurement. <br /> components are present, take appropriate <br /> precautions when performing the test or S.Upon completion of the test: <br /> use an alternative test method. remove all water and properly dispose of it <br /> - according to Section 6.7; <br /> • reinstall any interstitial monitoring sensors in <br /> their proper positions; <br /> • return the test boots or secondary contain- <br /> ment fittings to their pre-test operating con- <br /> figurations; <br /> Water E7eciWal <br /> Level Jundlon <br /> l Box <br /> E7eclrical <br /> Conduit ... . .... .. ... <br /> i <br /> Wafer <br /> Prcduct Level <br /> Piping <br /> Electrical <br /> e _ Candult <br /> Product <br /> FIGURE 6.5. The test fluid level in the UDC must be at Piping <br /> least 4 Inches above the highest sump penetration or <br /> sidewall seam. <br /> FIGURE 6.6. To prevent leakage, check all penetration <br /> fittings before adding water to ensure they make a tight <br /> seal. <br /> 49 pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.