Laserfiche WebLink
<� Job Order Field <br /> 2368216-1 <br /> Jones Covey Group, Inc. <br /> 9595 Lucas Ranch Rd. Posted <br /> Rancho Cucamonga,CA 91730 <br /> 888-972-7581 <br /> I IIIIII III IIIIII II II <br /> 2368215-1 <br /> Account Bill To General <br /> Pilot 1017 Lathrop Pilot Travel Centers Knoxville Order Date 8/8/23 <br /> 345 Roth Rd. PO Box 10146 Due Date 1/13/24 <br /> Lathrop, CA 95330 Knoxville, TN 37939-0146 PO# 160214818 <br /> Payment Net 45 <br /> Job Details <br /> Description: <br /> ............................................................................................................................................................................................................................................................................................................................................................................................................ <br /> 11/09 - Final Inspection on the 87 Leak Detector <br /> Before replacing controller perform the following troubleshooting: <br /> • Shut down site <br /> •Verify turbine is still running without authorized hook <br /> • One at a time power down the dispensers at the breakers ( if the hook signal is lost at any time then it a dispenser with <br /> continuous hook is the issue, ) <br /> • If needed replace isotrol <br /> 87 MLLD Inconclusive. The Veeder-Root Isotrol 1-8 Control Box is not functional, will not allow the STP Motor to shutdown <br /> when there is no Pump Signal. Would not allow for the 87 MLLD to be tested. <br /> AST Sensors and TLM Probes will require a return trip, requiring Fall Protection to test. <br /> Completion Notes: <br /> 09/25 Checked in with site manager Pete before beginning work. Here today to inspect 87 Relay for Positive Shutdown. Site <br /> was closed down temporarily for troubleshooting. With all nozzles hung up 87 STP was down and not running. Verified good <br /> hook signals for fueling points 1-10 with the STP going up and down. Issue possibly caused by 87 relay getting stuck during <br /> time of testing. Verified correct voltage in and out of iso-control box currently. Relay contacts clean and do not appear <br /> damaged. All components are currently operational and testing of 87MLLD can be scheduled with San Juaquin County. At <br /> that time returning techs can also test remaining AST sensors and ATGs. Checked out with Site manager at time of <br /> departure. <br /> 11/09 Arrived onto the site, checked in with management. Explained to management the reason for being present on site. <br /> Present on site to retest the 87 unleaded mechanical line leak detector that failed during the annual monitor certification. San <br /> Juaquin County was notified of the retest. Retested the 87 unleaded mechanical line leak detector. The leak detector passed <br /> with no issues found. The mechanical line leak detector was stickered. San Juaquin County was not present to witness the <br /> retest. Cleaned up all work areas. Monitor certification report was submitted to JCG. The invoice was signed by management <br /> and left at the facility. Checked out with management. <br /> *JOB COMPLETE* <br /> Product Description Order Order <br /> Quantity Uom <br /> Permit Fee Billing Permit Fee - SJCEHD Surcharge 1 <br />