Laserfiche WebLink
Remediation System Well Abandonment Work Plan JACOBS <br /> that is located well below the water table. In addition, it is located close to monitoring well PZ-6, which will <br /> continue to be monitored. <br /> The well construction details are presented in Table 1 at the end of this report. The wells proposed for <br /> abandonment consist of/z-inch-, 2-inch-, and 4-inch-diameter schedule 40 polyvinyl chloride (PVC) as <br /> well as soil vapor wells constructed with Teflon tubing. Installation depths range from 10 to 32 feet below <br /> ground surface (bgs)and installation methods varied. <br /> 1.4 Document Organization <br /> This work plan is organized as follows: <br /> • Section 1 —Introduction and Background: This section contains an introduction to the Work Plan, <br /> its objectives, Site background information, well details, and document organization. <br /> • Section 2—Pre-Field Activities: This section describes activities to be conducted prior to the start of <br /> well abandonment activities. <br /> • Section 3—Field Activities: This section describes well abandonment, equipment decontamination, <br /> waste handling, and field procedures. <br /> • Section 4—Reporting: This section describes the reporting to be conducted. <br /> • Section 5—Sustainability: This section identifies sustainability practices to be implemented during <br /> the remediation system well abandonment activities. <br /> • Section 6—Works Cited: This section provides details of the documents referenced in this Work <br /> Plan. <br /> B11204191849AKT <br />