Laserfiche WebLink
� 1 <br /> ACCEA4 AGREEMENT <br /> This Aeceas Agreement C`Mcess Avon is entered ism on this 200 day of <br /> Janus 2020 (the "Execution Date"), by mat between Nestle USA, rat:., a Delaware corporation <br /> C'NUSn and Ripon Christian Schools, a school upemled by the Society fur Christian <br /> Instruction, of1kipon, Uifomia, u Califomianon-profitcmpofation CT ). <br /> RECITALS <br /> The following recitals are hereby ineurpmated into this agreement and made a part <br /> hmeoE <br /> WHEREAS, RCS owes the met property heated at 435 Maple Ave. in the Ci(y of Ripon, <br /> California, and consisting of approximately Ihhty-four (34) scree (the "I400ertv'h; and <br /> WrJMTAS, NUSA is conducting camin work which includes, without limitation, <br /> investigation, monimring and mumaliation in the vicinity of the Property water the oversight of <br /> the Regional Water Quality Control Board (the "Rceionul Board") aM work related IM1emto (the <br /> 4work•1; cod <br /> WMRpAR, the parties agree that the Work will benefit RGS, NUSA, and other nos we <br /> ofpmpeay in is vicinity of the Property mM RCS desires (o have the Work occur, and <br /> WHEREAS, in order to ecmplac the Work it will be nose ary for NUSA mat its <br /> consultant and contractors to, at a minimum, conduct the following activities (collectively, the <br /> "Activitic 1: ane prepamtion (marling loraliots and perfoenting utility cleamrm), soil Innings, <br /> sa raring well installation, monitoring well development sod d¢ammissionhrg, groundwater <br /> sampling, borehote ranging and smfaze restoration m curb sampling location shown in Figure 1. <br /> It is estimated that the wink can be completed within 5 to It working days aml that groundwater <br /> saarpling of any wells would be performed on a quarterly basis thereafter, until Regional Board <br /> allows for the wells to be removed. The timefreme fur matte rhtg is not a mendy defined soul <br /> may exceed 10 years; and <br /> WHEREAS, each monitoring well will be completed inside a metal valve box with a <br /> traffrcmmd lid, set in concrete that is nearly flush to ground surface but slightly Taised <br /> and sloped to avoid pouring of rainwater. Nestle will rennove the mmumring wells during <br /> decommissioning in eccmdavce with Sank of Califomia and San Joaquin County well stamlmds <br /> and will restom aurSce conditions to match surrounding landscape aM/m Iarlverpe as <br /> appropriate after the wells are deeommissioned; mul <br /> WHEREAS, each monitoring well will be wrutmeted as a (m6re-matt "Bush mount" <br /> completion W minimize obshu her at gmmal swf s. TM surface completion will be secured <br /> with bolts aM the monitoring well will be fitted with a locked cap to prevent amnpaing. After <br /> the Regional Board allows for the wells 0 be removed, or RCS requiaa the well to be Temoved <br />