My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0544730
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 3:10:16 PM
Creation date
8/12/2025 2:04:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544730
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0025419
FACILITY_NAME
NESTLE USA INC FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
230 INDUSTRIAL AVE RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Additional details on CPT borings and depth-alscretegroundwarersamalmh are fronded home. <br /> 4.3 g Haley &Aid ch proposes <br /> o advance up to six h ndinks In the worth Amato the maximum depth <br /> archnevihe, which is anticipated to be 150 feet bgs or Bremer, for the collection of multiple depth <br /> discretegmundwmersamplr (Figured). Groundwater samples will he collected from up to fear depth <br /> Intervals 9 each location and will include C3-mum samples if the CPT rig can advance thesampling <br /> device to depths a 1g0 to in Ram the. Up to footstep ad locations may also be advanced, if needed. <br /> The investigation methods are described in the setions below. <br /> 43.1 Preparation for sampling <br /> Pirfortnine start offield aamitles, Today & Aldrich will update the Site-specific Werth and Safety Plan, <br /> obtain loll boring parmltsimm San Return Couay Envimnmemal Tough Department, obtain access <br /> encreartment its from the City of Ripon for any work perfumed in the Public right-of-way, <br /> complete permits <br /> access win property owners (Ripon Christian School and Ripon Public Sclwol), and contract <br /> with a utility location subcontractor and a drilling suk ntaaur. Haley & Aldrich will mark each <br /> prosposed Investigation location and notify Underground Service Alert m least 49 hours Pdar to the and <br /> of fieldwork. Prior oad advancing veaga each location ill be screened for milling bya <br /> pressmutnty Ba ' <br /> tor d/ormanually excavated to a depth of 5 fed his. <br /> eter <br /> CPTi Cans the use onfa teel samullkgram too Push an Instrumenteddent the weight ofM1 a fileommethrerms(30 ough the <br /> subsurface us es The farce erbaR on riven by the thetipof <br /> the Tam a theinstrument (tip strays) as the fration on <br /> the sides of the using <br /> ninoI fleevee friction)n)an iupore prasa the,cone is advanced throe <br /> the I. computer r informa n oa use and algorithmba <br /> automsteed classificationsso soil conditionsenco Bred as the adissa anted Re. n and gM10 s <br /> versus ad days). This informationwillotbe used to nracel ndshas gavels) a <br /> an be toll ed in he water-producing sail unts (s <br /> the eUUpper and Ited ntermediater is ate Arm Ram. <br /> Up to to Ratings (six and four step out) will be advanced as members shown an Figure 4. <br /> Thei aeptFs of the CPT bon will be demand ned by the drilling ng—each boring will be advanced until <br /> refusal, or the top a the Corcoran Clay, anticipated to be at about 190 feet loss In this area. After the <br /> dial depth Is reached, the CPT mds will he retracted from the Rod rig and maintain invited poor to <br /> anceirrig o the next Irmmn. The lithologic Information ;ram the CPT burps will he used to Identify <br /> course grained intervals were adjacent groundwater samples will he wlkaedAll . <br /> locations will be sealed with next cement grout upon reassume eorales will be backfllled by <br /> r Bandages <br /> follow steel Pads fitted with a disposable tip into the open hodng after the CPT tooling K <br /> removed.The reds will be advanced to fire target depth and then filled with cement grant and retracted <br /> thereby filling the borehole with grant. <br /> 12 HkRICH <br />
The URL can be used to link to this page
Your browser does not support the video tag.