My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0544730
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 3:10:16 PM
Creation date
8/12/2025 2:04:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544730
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0025419
FACILITY_NAME
NESTLE USA INC FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
230 INDUSTRIAL AVE RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 1 <br /> 5. Reporting and Schedule <br /> Within 30 days of receiving all laboratory analytical results from the groundwater sampling and first <br /> and of sail vapor sampling, Haley & Aid rich will prepare a brief letter report that will Include a map of <br /> updated sampling locations antl a table of analytical results for sohimpal to the Water Board. If Fire <br /> in Mal results Indicate there are potential complete pathways for vapor intrusion, then <br /> first Who And <br /> will also I rule de recommendations for follow-up actions such as samplings i, so va por locations <br /> and/or collrecil ng indoor an samples. <br /> Within 60 days 4receiving the second round of soil vapar sampling, Haley&Aldrich will prepare a <br /> report documenting the methods and results of the additional Site dmraretention described herein, <br /> inducting tables, figures, CPT logs, and laboratory reports, for submittal to the Water Board. The repair <br /> willva oprovideaassessmentof they ntrusio pathway based on eWort^Area <br /> sampling result ,and recurrence for follow-up testing asraper priate. Forvthht <br /> indoudea updated map of WC co and rxommendmmns for add <br /> al <br /> remediation athe report nd/or monitoringin this area, as appropriate. <br /> Haley &Aldrich amidptes that fieldwork can begin within 30 days of approval of this Work Plan, <br /> pending axes to investigation locations and subcontractor availability. <br /> 15 WASICH <br />
The URL can be used to link to this page
Your browser does not support the video tag.