Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: 09/18/2025 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> PIRE5UMP ANNULAR OVERFILLALARM <br /> L10:794M0408 L13:7DA39Ud20 L12;79439iMW <br /> OVERFILL L11:794396-429 <br /> WWAM OI L <br /> RAU LIC ff I L <br /> FILL RU CKET HYD <br /> VENT WASTE OILRRN <br /> L15:?9438&248 HYDRAULICTANK <br /> DSL JI5R 1-2 ANNULAR OVERFILLALARM <br /> 1-7:7 94 3 80-2 43 L3;79439OL420 IT <br /> ❑ ❑87 DI5P 3-4 <br /> L3;734384288 <br /> 11 TLS-350 <br /> DIESEL UNLEADED <br /> ANNULAR ANNULAR <br /> L6;794390d2il 1-2;794394424 MOTOROIL <br /> ❑ 87DI5P1-2 ANNULAR <br /> AR <br /> 794384248 LM 734 3 994 2 0 <br /> TLM PROBE <br /> 5473 90-147 VAPOR R U CKE <br /> FILL RUCKET Q FILL RUCKET VENTTRANSITION <br /> L15:794384248 PGE-095 <br /> 4 LMPRORE/PA265436024 4444WESTLANE <br /> STOCKTON CA.95244 <br /> RIRESUMR PIPESUMR <br /> L5;7943MMOS LE:79438�248 <br /> PLLD Pj RLLD <br /> Page 6 of 6 <br />