My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOORE
>
15271
>
2300 - Underground Storage Tank Program
>
PR2500441
>
REMOVAL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2025 4:15:22 PM
Creation date
8/22/2025 4:06:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2024
RECORD_ID
PR2500441
PE
2361 - UST FACILITY
FACILITY_ID
FA0004223
FACILITY_NAME
UMAIR KHAN
STREET_NUMBER
15271
STREET_NAME
MOORE
STREET_TYPE
RD
City
LODI
Zip
95242
CURRENT_STATUS
Inactive
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
15271 N MOORE RD LODI 95242
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />10 of 10 <br /> <br />Environmental Health Department <br />BACKFILL EXCAVATION CERTIFICATE Project Location:__________________________________________________________ Owner____________________________________ Phone No:___________________ <br />Contractor:________________________________ Phone No:____________________ <br /> <br />License No:____________________ <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE __ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or ___ 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was placed in the excavation in 12" lifts: ___A. Pea gravel--smooth, rounded material not more than one-half (1/2) inch in diameter ___B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the backfill material and tanks/pipes made of poly resin glass or similar materials.) DECLARATION I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code Appendix Chapter 70. *Name . <br />(Print) Title . <br />(Print) Signature . <br /> *Shall be the responsible managing employee on the license or authorized agent.
The URL can be used to link to this page
Your browser does not support the video tag.