Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: CITY OF LODI 1331 SOUTH HAM LANE LODI CA 95240 <br /> OVERFILL.ALARM <br /> O X <br /> O <br /> . . . . . . . . . . . . . . <br /> . . WASTE OIL 2K . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . VENTS <br /> . . . . . . . . . . . . . . . . . . . . <br /> "PIPING* ATc <br /> Drawing of piping . . . � CAS. <br /> exit of sump and <br /> UDC's.No . . . . . . . . <br /> underground . ' . . . . . ' <br /> drawingis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> accurate,we . . . I . . . I . . I . . . . . . . . . . . . . . . . . . . . . .OVERFILL ALARIP . . . . <br /> cannot speculate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . <br /> blue prints. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . x <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> KEY <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6. . . . . <br /> A=ANNULAR <br /> F=FILLS . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . x . . . . . . . <br /> T=TURBINE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> P=PROBE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> V=VAPOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> X=SUMP SENSOR . . . . . . . . . . . . . . <br /> L=Leak Detector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> M=Manwav . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> B=Brine Sensor .10K 87 2K 87. ... . . . . . . . . . . . . . . . . . . . . <br /> I=Smart Sensor <br /> S=STP <br /> C=Floats&Chains x O O O <br /> E=E Stop O O <br /> x F <br /> A*-ifen>s rrrr�rgrarao<f ilyd Rre nn1 lrsibla fo f Iu cwY{�iing fac]rerciRre na R <br /> �{�655 rO1?7�4jdlPlOrP Ol�V'Rli'iA$sU16i.1'�r'7f�0771Rf17Kl1PrflF�VIS�. i�O47'V� <br /> my f0 sede <br /> Date map was drawn.9/20/19 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />