Laserfiche WebLink
Geosyntec <br /> consultants <br /> Geosyntec HSE Procedures referenced herein are available on Geosyntec's HSE SharePoint site TASK HAZARD ANALYSIS <br /> and should be consulted,as appropriate,to ensure requirements are met.This THA has been (ver.4.0,9-8.2023) <br /> prepared per"HSE STD-105.Project Safety Management Handbook' <br /> Part A - PROJECT/TASK INFORMATION <br /> Project/Site Name: GSH Stockton Phytoremediation System Project Number/Org: TR0712/Org.8130 <br /> Site Address: 1904 West Charter Way,Stockton,California <br /> Task&Worksite Destruction of damaged monitoring wells and installation and development of new replacement monitoring wells. <br /> Description: Monitoring wells MW-5B and MW-7B will be destroyed by over-drilling to remove well construction material within the <br /> original borehole,after which the created hole will be filled completely with appropriate sealing material,consistent with <br /> standards presented in the San Joaquin County standards.Two new monitoring wells,MW-5C and MW-7C,will be <br /> installed as replacements for wells MW-513 and MW-70,respectively,within 15 feet of the original well that will be <br /> destroyed.Each of the two new monitoring wells will be constructed in the same general configuration as the well it is <br /> intended to replace(i.e.,same terminal depths,diameter,well screen,casing,and screened intervals);however, <br /> terminal depths and screen elevations may be adjusted by Geosyntec based on observations made during borehole <br /> advancement and results of continuous soil sampling.Once installation is complete,both new wells will be developed by <br /> a combination of bailing,surging,and pumping which will serve to stabilize the filter pack and remove fines from the filter <br /> pack and well screen.All drill cuttings and development/purge water will be containerized in new 55-gallon steel drums <br /> for off-Site disposal. <br /> NOTE:As per Oxy Stop Work Authority Mandate:"Every Oxy employee and contractor has the right,obligation, <br /> and responsibility to stop any unsafe work without re ercussion." <br /> Geosyntec Personnel: Name Office Phone Cell Phone <br /> Site Safety Lead/Officer Ron Gestler 519-514-2254 925-278-8688 <br /> _......_..._._.__.....-_-._..._.......I.._......._............................_..........._..._....._..._...._...................._._....._......_........................................_............_...... . —--.. --.......—.._..._. <br /> Task Technical Lead Ron Gestler 519-514-2254 925-278-8688 <br /> Project Manager Annie Lee 519-514-2256 226-989-9384 <br /> Project Director Ron Gestler 519-514-2254 925-278-8688 <br /> _. .__...._ _ _ —_ _ <br /> HSE Coordinator Dean Zapishny 519-494-3031 <br /> Regional HSE Manager Jason Ford 519-515-0861 <br /> _ P _ __. _ ._._..._ ...._.... _......_ .__.__...... ..... <br /> Corporate HSE Director Bob Poll 813-379-4420 813 240-9231 <br /> On-Site ® Applicable;provide company name,work task and contact information for each Geosyntec <br /> Subcontractor(s): subcontractor below: <br /> ❑ Not Applicable PeneCore Drilling,Xavier Green 530-661-3600 <br /> Client,Contact(s): Lisa Waskom (GSH PM) 713-552-8765 713-824-1934 <br /> Enzo Conti (GSH H&S Director) 713-350-4744 214-608-6124 <br /> ETHICS POINT HOTLINE US&Canada:844-231-3371 Australia:800-551-155 or 800.811.011 <br /> UK:800-89-0011 or 800-89-0011 Ireland:800-222-55288 or 800-500-000 <br /> Part 8 -EMERGENCY RESPONSE and FIRST AID <br /> IMPORTANT:After initial emergency response actions and incident stabilization,contact appropriate project staff and/or HSE personnel listed in Part A <br /> Site-Specific Notes,Clarifications:(fire%xplosion,medical,chemicals/spills,security,site factors,weather,communications). <br /> Emergency Communication/Alerting M Verbal ®Cell Phone ❑Land Line ❑2-Way Radio ❑Satellite Phone ❑On-site alarm/signal system <br /> ❑Other: <br /> To Summon Police,Fire,Ambulance ®DIAL 911,for external responders ❑Other: <br /> WorkCare(for non-emergency injuries) 24/7:888-449-7787 <br /> Other Emergency Contacts(such as <br /> security,spill responder,utility-related): <br /> Nearest EMERGENCY ROOM Medical Hospital Name:San Joaquin General Hospital <br /> Services Address:500 W.Hospital Road,French Camp,CA <br /> Phone# 209-468-6000 ®See ATTACHMENT A,ROUTE to HOSPITAL <br /> Emergency Evacuation-Route, Main Gate <br /> Rally/Muster Point,Shelter Location(s) <br /> EMERGENCY and FIRST AID EQUIPMENT required for this work task is listed in PART C.2.—SAFETY EQUIPMENT LIST <br /> Attachment Hospital A:Route to Hospital <br /> Geosyntec J> Task/Project Name: TR0712/GSH Stockton <br /> THA Date: 6/17/2025 Page 1 <br /> consultants <br />