Laserfiche WebLink
General Safety <br /> ®General site hazards—Prevent slips/trips/falls(resulting from rough terrain,trip hazards,steep slope,slippery surfaces);maintain good housekeeping. <br /> ®Musculoskeletal hazards—Prevent strains/sprains from strenuous tasks,overexertion,repetitive motion/ergonomic/lifting(seek help/lift-aids over 49 lbs.) <br /> ®Weather/climate-related hazards—Prevent heat/cold-related illness,use sunscreen,monitor weather,i.d.shelter/refuge,use"30/30 rule'for lightning. <br /> ❑Plant/insect/animal hazards—Use precautions:poison ivy blocker/wash;insect repellant;tick checks;wasp spray;animal precautions. <br /> ®Common unsanitary/allergenic hazards—Use routine hygienic measures/precautions;hand washing/sanitizes,food hygiene,PPE,disinfectant cleaning. <br /> ®Infectious/Pathogenic-For COVID-19,and other non-typical/potentially high-risk pathogenic hazards,see D.13"Infectious/Pathogenic Biohazards." <br /> ®Worksite traffic hazards—Implement measures to protect personnel(high-visibility/reflective clothing,on-person lighting,traffic control measures). <br /> ®Hazardous energy—Use caution near electrical equipment/wet locations,machinery/physical hazards,stay out of hazard zone/line-of-fire,don't touch. <br /> ❑Illumination hazards/night work—Illuminate work areas and/or access routes,use high-visibility and reflective clothing or on-person lighting,as appropriate. <br /> ❑Security,potential crime/violence,urban/industrial zones—Complete the Assessment for Specific Risk:Working in Urban and Industrial Zones <br /> ❑Working alone-Develop a project-specific plan/procedure on limitations for lone work and specify a plan for periodic communication/contact. <br /> Geosyntec Procedures:HS-124-Heat Stress,HS-125-Cold Stress,HS-127-Ticks,HS-207-Working Alone,HS-208-Housekeeping,HS-210-Walking and Working <br /> Surfaces,HS-401-Back Injury Prevention,HS-517-Traffic Safety,Assessment for Specific Risk:Working in Urban and Industrial Zones <br /> Basic Personal Protection <br /> ®Head protection from overhead hazards—Wear hardhat or"bump cap"as appropriate for hazard. <br /> ®Hand protection—Wear protective work gloves appropriate for the hazard and work tasks. <br /> ®Eye protection—Wear safety glasses(with side shield or wrap around,either clear or shaded for sun protection),or other appropriate eye protection. <br /> ®Foot protection,rough terrain—Wear work boots/shoes with hard toes,ankle support,puncture resistance,traction,as appropriate for conditions. <br /> ❑Hearing protection—use earplugs or earmuffs(or both)as appropriate for conditions;at a minimum where noise levels exceed 85 dBA. <br /> ®Protective clothing/nuisance dust mask—For general protection against dust,dirt,oily residues,unsanitary conditions,as needed. <br /> ❑Other personal safety gear required for the task(s)covered in this THA is described above in Site-Specific Notes&Clarifications <br /> Geosyntec Procedures: HS 109-Hearing Conservation,HS 112-Respiratory Protection,HS 113-Personal Protective Equipment <br /> D.2. SPECIAL DRIVING/TRAFFIC/TRANSPORTATION HAZARDS ❑ Applicable ® Not Applicable, Not Anticipated <br /> Site-Specific Notes&Clarifications: A Pedestrian Control Plan will be used for temporary sidewalk closure and work activities related to installation of the SVPs. <br /> ❑ SPECIAL DRIVING HAZARDS ❑For off-road driving,do not exceed capability of vehicle,beware of wet conditions,keep speed low,avoid <br /> Off-Road Driving or use of non- unsafe orientation on slopes. <br /> typical vehicle,heavy vehicle,van, ❑UTV/ATV-specific procedures for training,use roll-bar or helmet,operate per manufacturer's instructions. <br /> UTV/ATV ❑Special Skills Required for Vehicle type—For vehicles requiring special skills(such as windowless van,heavy <br /> Hazards:Worker injury due to work vehicle,utility vehicle,similar)ensure operator is provided training and/or has appropriate operator <br /> vehicle collision,rollover skills through experience. <br /> Geosyntec Procedure(s):HS-510-All Terrain Vehicles <br /> ROADWAY TRAFFIC HAZARDS ❑Prepare Management of Traffic(MOT)Plan(address location hazards/client and regulatory requirements). <br /> Where the worksite is located ❑Wear DOT-approved reflective vests where exposed to traffic hazards. <br /> in/near vehicle thoroughfare(road, ❑Where possible,park vehicles as protective shield from oncoming traffic. <br /> highway,parking lot,etc.). ❑Configure work area and sup <br /> port pport vehicles to minimize worker exposure to traffic hazards. <br /> Hazards:Worker injury from being <br /> struck by vehicle traveling in ❑Use DOT signal devices and/or signage to re-route vehicles around work area,site entrances/exits. <br /> thoroughfare. ❑Use DOT-trained flaggers or police detail where appropriate or required. <br /> Geosyntec Procedure(s):HS-517-Traffic Safety <br /> TOWING/HAULING LOADS ❑Ensure load within vehicle is firmly secured(rope,straps,load configuration)to prevent shifting during travel. <br /> Hazards:Vehicle accident,occupant ❑Slings,chains,strap,rope and related equipment used for towing,hauling,load-securing shall be appropriate <br /> injury from shifting load,unsafe for use and used in a manner as to prevent an unsafe condition. <br /> equipment,un roadworthiness of ❑For trailer use,verify tow-hitch components are compatible,hitch/safety chains secure,signal/braking lights <br /> trailer. operational,rear-view mirrors effective,tires inflated to proper pressure and tread acceptable. <br /> RAILROAD HAZARD ❑Coordinate with rail company or on-site host facility and implement required safety and security measures. <br /> Hazard:Worker injury from being ❑Site workers to receive safety training for railroad work. <br /> struck by train in R.R.right-of-way Geosyntec Procedure(s):HS-305-Rail Operations <br /> TRANSPORTATION BY WATER ❑See 13.3.,"Water Hazards." <br /> Geosyntec Procedure(s):HS-312-Water Transportation Safety <br /> ; AIRPORT HAZARDS ❑Coordinate safety requirements with airport personnel and implement required safety measures. <br /> Worker injury when working ❑Site workers to receive safety training for airport work. <br /> on/near airport runway,or use of <br /> helicopter,light aircraft Geosyntec Procedure(s):HS-310-HelicopterSafety,HS 311-General Aviation(Small Aircraft)Safety <br /> ' TRAFFIC/VEHICLE HAZARDS ❑See D.8.,"Construction,Heavy Equipment,Lift Equipment" <br /> RELATED TO HEAVY EQUIPMENT, <br /> CONSTRUCTION SITE ACTIVITIES <br /> D.3. WATER HAZARDS(Working Over/Near Water,Ash Ponds,Quicksand) ❑ Applicable ® Not Applicable, Not Anticipated <br /> Site-Specific Notes&Clarifications: <br /> Geosyntec° Projellask Name:TR0712/GSH OxyChe j-Stockton Routine Soil Sampling <br /> THA Date:07/25/2022 Updated 8-15-2024 <br /> consultants Page 4 <br />