Laserfiche WebLink
Water accumulation • Prevent water accumulation in trench. <br /> Falls into excavations • Sloping&shoring for trenches/excavations>20'deep must be approved by a Professional Engineer. <br /> Utility-related hazards • Sloping/shoring/trench box for excavations>5'when persons enter trench/excavation. <br /> Undermining structures& • Sloping/shoring/trench box for shallow(<5')trench/excavation with cave-in hazard. <br /> foundations • Workers in trenches to be within 25 feet of ladder or sloped entryway. <br /> • Excavations to be protected by perimeter fencing(not barricade tape),if potential for personnel to fall into. <br /> • If potential for atmospheric hazard,see D.12."Confined/Enclosed Spaces" <br /> Geosyntec Procedure(s):HS-402-Excavation and Trenching,HS-132-Competent Persons <br /> FORKLIFT ❑In addition to general safety practices for heavy equipment(above),as applicable: <br /> Hazards: • Qualified operator,per established forklift training(certificate is required);Geosyntec operator must be <br /> Struck-by approved by Director of Health and Safety. <br /> Run over/roll over/tip over • Equipment inspected daily and documented on Forklift Preoperational Inspection Checklist. <br /> Overhead utilities/obstructions • Do not exceed lifting load limits. <br /> Caught between(pinch points) • Forklift shall not be moved/driven with empty forks in raised position. <br /> Unstable/falling loads . When not in use,forks lowered,brake set,controls in neutral,key removed. <br /> Elevated forks <br /> -Fluid leaks <br /> Geosyntec Procedure(s):HS-505-Safe Operation of Forklifts,HS-132-Competent Persons <br /> ; AERIAL BOOM/SCISSOR LIFT ❑Follow safe work practices: <br /> Hazards: • Operators to be appropriately trained and certified. <br /> Falls from basket • Equipment is inspected after mobilization and is in good condition. <br /> Overhead utilities/obstructions • Harness&lanyard worn whenever operating the lift. <br /> Struck-by,run over,tip over • Overhead hazards and surface obstructions to be reviewed with operators/riders prior to use. <br /> Caught between(pinch points) <br /> Tip over <br /> Fluid leaks. <br /> Geosyntec Procedure(s):HS-509-Aerial Lifts <br /> ; CRANES ❑In addition to general safety practices for Operation of Heavy Equipment(above),as applicable: <br /> Hazards: • Only qualified persons operate cranes(certificate required). <br /> — electrocution by overhead utility • Critical Lift Plan&Checklist prepared/executed(See HS 506-Cranes)prior to mobilization. <br /> — injury in swing radius • Equipment to be inspected prior to mobilization and daily by crane operator. <br /> — injury from falling load • Crane operator will remain at the controls at all times during operation. <br /> — crane tipping over due to . Crane operation must be performed under the direction of an appointed signal person at all times using hand <br /> overbalancing,high winds, <br /> unstable ground,unsafe slope, signals and/or voice/radio communication. <br /> bad placement of outriggers • Crane to be level and stable(solid ground or crane mats/timbers,outriggers if present,cribbing);over- <br /> injury from mechanical hazards reaching or exceeding load limits is prohibited. <br /> • Keep area beneath suspended loads clear of personnel;tag lines used to maneuver load. <br /> • Rigging procedures—see Mechanical Lifts with Rigging,below. <br /> Geosyntec Procedure(s):HS-506-Cranes,HS-132-Competent Persons <br /> MECHANICAL LIFTS WITH RIGGING ❑In addition to general safety practices for Operation of Heavy Equipment and Cranes(above),as applicable: <br /> Applies to lifting by rigging attached • Slings,chains,rope,wire rope,as well as sheaves,boom and attachments used for lifting/hoisting shall be <br /> to crane,truck mounted boom rig maintained in good condition,inspected daily,and used/stored in a manner as to protect from damage. <br /> (e.g.drill rig),heavy equipment, • Coordinate lifting operations with competent person. <br /> mechanical/electrical hoist,similar • Do not exceed loading limits of lifting equipment;perform work in accordance with equipment load chart. <br /> equipment. • Hooks will be equipped with safety latches. <br /> Hazards: • Ensure anchor points for winch or other lift device(such as davit arm)are engineered for intended use. <br /> —Mechanical hazards, • Ensure personnel are not positioned beneath elevated loads and that tag lines are used where appropriate. <br /> —Elevated loads <br /> Geosyntec Procedure(s):HS-506-Cranes <br /> WARNING! Confirmed or possible ❑Follow safe work practices per D.10."Utility-Related Hazards" <br /> close proximity to OVERHEAD or <br /> UNDERGROUND UTILITIES. Geosyntec Procedure(s):HS-304-Overhead/Underground Utility Hazards <br /> DEMOLITION ❑Develop/implement a demolition safety plan. <br /> Geosyntec Procedure(s): HS-132-Competent Persons <br /> Ej BLASTING,UNEXPLODED ❑Develop/implement safety plan for blasting,unexploded ordnance,as applicable. <br /> ORDNANCE Geosyntec Procedure(s):HS 307 Blasting and Use of Explosives,HS 132-Competent Persons <br /> PUBLIC AT RISK,SITE SECURITY ❑During site operations protect public(overhead protection,fencing,barriers,warning signs). <br /> ❑During off hours,protect public with fencing,barriers,warning signs/lights,other measures as appropriate. <br /> ❑Lock/secure hazardous materials and/or equipment. <br /> D.9. STORAGEIHANDLING OF BULK MATERIALS(for Chemical Storage,see D.14&15) C Applicable ® Not Applicable, Not Anticipated <br /> Site-Specific Notes&Clarifications: <br /> ❑ BULK STORAGE HAZARDS: ❑Store materials in stable manner(stacked,racked,blocked,interlocked,tied,wrapped,or otherwise <br /> secured)to prevent tipping,sliding,rolling,falling or collapse. <br /> Geosyntee° Project/Task Name:TR0712/GSH OxyChe j-Stockton Routine Soil Sampling <br /> THA Date:07/25/2022 Updated 8-15-2024 <br /> Consultants Page 9 <br />