|
................................................................................................................................................................................................................................................................................................................................................................................
<br /> X to X mg/m3 Use APR*with particulate cartridges appropriate for the hazard;do not exceed MUC**for respirator type;
<br /> confirm procedures for respirator usage with Corp.H&S Dept.
<br /> Visible Dust Use wetting methods to control.For persistent levels greater than action level,contact Corp H&S Dept.
<br /> ❑ <OTHER> ...........................................................................................................................................................................................................................................................................
<br /> *Air-purifying respirator **Maximum use concentration
<br /> ......................................................................................................................................................................................................................................................................................................................................................................................
<br /> Geosyntec Procedures: HS-111-Air Monitoring,HS-602-Lead,HS-605-Hydrogen Sulfide,Wildfire Smoke THA Addendum
<br /> E.2. OTHER WORKER EXPOSURE MONITORING ❑ Applicable ® Not Applicable, Not Anticipated
<br /> ® Heat/Cold Stress Testing/Monitoring ❑Wildfire Smoke—Tracking AQI(Air Quality Index) ❑<Other>
<br /> ❑Air Sampling(sample collection,passive dosimeter) ❑Ionizing or Non-ionizing Radiation Testing ❑<Other>
<br /> ❑Wipe/Bulk Sampling(to evaluate worker exposure) ❑Noise Testing
<br /> Site-Specific Notes,Clarifications:
<br /> Geosyntec Procedures: HS-109-Hearing Protection,HS-111-Air Monitoring,HS-124-Heat Stress Prevention,HS-125-Cold Stress Prevention,
<br /> HS-126-Radiation Safety Program,HS-128-Ionizing and Non-ionizing Radiation,HS-601-Asbestos,
<br /> HS-602-Lead,HS-604-Respirable Crystalline Silica,HS-605-Hydrogen Sulfide
<br /> E.3. FENCELINE/PERIMETER AIR MONITORING 17 Applicable 1-7 Not Applicable, Not Anticipated
<br /> Fence line/perimeter air monitoring to be conducted in accordance with a separate"Perimeter Air Monitoring Plan"for this work;results from fence line/perimeter air
<br /> monitoring shall NOT be used as the sole basis for determining work zone atmospheric hazards.
<br /> Site-Specific Notes,Clarifications:
<br /> PART F-APPROVALS, ACKNOWLEDGEMENTS
<br /> F.1. THA PREPARATION, REVIEW/APPROVAL SIGNATURES A THA is typically prepared by project staff,often with input from an HSC,with
<br /> review/approval, at a minimum, by PM or PD. Corporate H&S staff must be consulted as required or otherwise deemed appropriate .
<br /> Printed Name Signature Date
<br /> THA PREPARED
<br /> BY: Ron Gestler f/,/�/� 07/18/2022
<br /> THA Printed Name Signature Date
<br /> REVIEWED/ Dean Zapishny 7-20-2022
<br /> APPROVED BY:
<br /> (Project Manager or
<br /> Project Director,at a
<br /> minimum) Ron Gestler(reviewed and updated on 8/15/2024)
<br /> *At a minimum,Corp.H&S must review/approve the THA review when Geosyntec staff will encounter"high hazards/high risks,"or perform critical tasks,such as(but not limited to):
<br /> Climb ladders to heights>10' Implement lockout/tagout controls Instrument monitoring for critical exposure risks
<br /> Use a personal fall apparatus Enter a trench/excavation>5'deep Wear a respirator
<br /> Self-perform tasks classified as construction labor Work near heavy equipment or crane Presence of"high-risk"contaminant(s)
<br /> Climb ladders to heights>10' Function as a construction"Competent Person" Sustained exposure to wildfire smoke AQIPM 2.5>150
<br /> Tow a trailer on roadway Operate a pneumatic or powder-actuated tool Enter EZICRZ during HAZWOPER cleanup activities
<br /> Oversee a hot-work permit system Electrical testing&maintenance(<50 V excluded) Exposure to radioactive isotopes(a,13,Y)
<br /> Enter a permit-required confined space Work at height near overhead electrical utility lines Onsite risk of emergency chemical spill
<br /> Operate a UTV/ATV,aerial lift or fork-lift Derive action levels for VOCs or toxic dusts Applicability of Chemical Anti-Terrorism Standards
<br /> Corporate H&S must also be consulted when Geosyntec subcontractors(under Geosyntec's oversight)perform high hazard/high risk work(such as demolition,blasting,crane lifts,
<br /> confined space entry,testing/maintenance of electrical systems,lockoutltagout,HAZWOPER cleanup activities),OR when supplemental written H&S programs are required for a project
<br /> (such as Electrical Safety Program,Lockout Program,Confined Space Entry Program,Emergency Response Plan),OR when a written safety plan must be submitted to a public agency.
<br /> Consultation with Corp.H&S is encouraged for all questions/concerns regarding worker safety,regulatory compliance,risk/liability aspects,or project-specific safety requirements.
<br /> Geosyntec H&S Procedure:For more information,see HS-204-Work-Specific Hazard and Risk Assessment,Written Safety Plans.
<br /> F.2. GEOSYNTEC FIELD CREW ACKNOWLEDGEMENTS
<br /> Geosyntec Project/Task Name:TR0712/GSH OxyChe j-Stockton Routine Soil Sampling
<br /> THA Date:07/25/2022 (Updated 8-15-2024
<br /> consultants Page 15
<br />
|