Laserfiche WebLink
°� �� z�� ��9�� <br />LISTED <br />UL ]M1 <br />F Series Full -Body FRP Termination <br />F Series Full -Body Flat Sump Wall <br />Entry Fittings for Single- or <br />Doublewall FRP Threaded Sumps <br />orders@sbravo.com <br />3/4" galvanized conduit <br />F -07S -0-F <br />3/4" galvanized conduit, threaded full-body with dual <br />2 <br />injection ports flat walls, epoxy req'd <br />3/4" PVC coated conduit <br />F-07RS-0-F <br />3/4" PVC coated conduit, threaded full-body with dual <br />2 <br />injection ports for flat walls, epoxy and clamps req'd <br />3/4" galvanized conduit <br />F -07S -0 -DF <br />3/4" galvanized conduit, threaded doublewall full-body with <br />2 <br />dual injection ports flat walls, epoxy and clamp req'd <br />3/4" PVC coated conduit <br />F-07RS-0-DF <br />3/4" PVC coated conduit, threaded full-body with duel <br />2 <br />injection ports, epoxy and clamp req'd <br />1"galvanized conduit <br />F -10S -0-F <br />1"galvanized conduit, threaded full-body with dual <br />2 <br />injection ports, epoxy and clamp req'd <br />1" PVC coated conduit <br />F-10RS-0-F <br />1" PVC coated conduit, threaded full-body with dual <br />2 <br />injection ports, epoxy and clamp req'd <br />1"galvanized conduit <br />F -10S -0 -DF <br />1" galvanized conduit, threaded doublewall full-body <br />2 <br />fitting, dual inspection ports and tertiary boot seal, flat wall, <br />epoxy, adhesive and clamp req'd <br />1" PVC coated conduit <br />F-10RS-0-DF <br />1" PVC conduit ,threaded doublewall full-body fitting, dual <br />2 <br />inspection ports and tertiary boot seal, flat wall, epoxy and <br />clamp req'd <br />3/4" brass grounding rod <br />F -07 -GR <br />3/4" brass grounding rod, full-body with brass conductor <br />2 <br />and clamps, epoxy req'd (2) EP100 <br />3x2" FRP <br />F -32S -T -F <br />3x2" FRP, threaded full-body taper by slip; dual test ports <br />2 <br />and single injection port, flat walls, epoxy req'd <br />4x3" FRP <br />F -43S -T -F <br />4x3" FRP, full-body taper by slip; dual test ports and single <br />3 <br />injection port, flat walls, epoxy req'd <br />6x4" FRP <br />F -64S -T -F <br />6x4" FRP, full-body taper by slip; dual test ports and single <br />3 <br />injection port, flat walls, epoxy req'd <br />3x2" FRP <br />F -32A -T -F <br />3x2" FRP, adjustable full-body taper by slip; dual test ports <br />3 <br />and single injection port, ep <br />4x3" FRP <br />F -43A -T -F <br />4x3" FRP, adjustable full-body taper by slip; dual test ports <br />3 <br />and single injection port, flat walls, epoxy req'd <br />Bravo Compression Clamp, <br />T -FS -C10 <br />One 3 bolt in-line compression clamp for F -Series conduit <br />Conduit <br />fittings <br />Bravo Compression Clamp, <br />T -FS -C40 <br />On tripod compression for full body 2", 3" and 4" product <br />Full Body Fitting 2" to 4" <br />fittings <br />orders@sbravo.com <br />