My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3788
>
2300 - Underground Storage Tank Program
>
PR0503876
>
INSTALL_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 3:42:20 PM
Creation date
8/28/2025 3:31:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2025
RECORD_ID
PR0503876
PE
2381 - UST FACILITY (BEFORE 1/84) - obsolete
FACILITY_ID
FA0006002
FACILITY_NAME
UNION OIL #6348
STREET_NUMBER
3788
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21225002
CURRENT_STATUS
Inactive, non-billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3788 N TRACY BLVD TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Program Element: 2303 - UST/PIPING INSTALLATION <br />Telephone: (916) 373-1165 Requestor: SARAH JABLONSKY, WALTON ENGINEERING, INC <br />Inspection Type: 131 - UST INSTALLATION INSPECTION <br />Address: 3788 N TRACY BLVD , TRACY 95304 <br />Date: 12/17/2024Name of Facility: TRIANGLE PLAZA TRACY <br /> Service Request Inspection Report <br />Request #: SR0087879 <br />Environmental Health Department <br />Onsite Service Technician : Juan Delgado <br />Manufacturer training: Xerxes, 01/17/25 <br />ICC Service Tech/Installer Exp. Date: 07/22/2026 <br />OVERALL INSPECTION NOTES AND COMMENTS <br />NOTES <br />On site install inspection: <br />- Witnessed tank set for 24,000-gallon/6,000-gallon split tank and 15,000-gallon/15,000-gallon split tank <br />- Verified UL labels on tank . UL number is G-38702066 on the 15k/15k split. UL number is G-38702107 on the 24k/6k split. UL <br />listing label is found in the tank sump. G# is printed on ends of tanks <br />- No leakage of brine observed or noted by installers <br />- Observed tank installation checklists on site <br />- Witnessed anchor straps installed and corrosion protection added to metal exposure on both tanks <br />- Observed proper backfill on site <br />- Witnessed start of backfill <br />Please ensure as-built drawings show the correct orientation of the 15k/15k split tank. Base is facing I-205, End is facing W <br />Larch. <br />Facility is not approved to receive fuel in the UST system . Facility is not approved to operate UST system . <br />Additional inspections are required. Please see approval letter dated December 13, 2024 for additional inspections. Please <br />submit all inspection requests in writing to UST@sjgov.org <br />To minimize person to person contact EHD is choosing to write the name of person receiving the report instead of having them <br />sign. <br />The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br />Safety Code. If a reinspection is required, fees will be assessed at the current hourly rate. <br />Received by: Name and Title: <br />EH Specialist:Phone:(209) 616-3061 <br />, <br />CAROL PRESTO <br />Emailed to Richard Walton , Installer <br />Page 1 of 1EHD Rev. 09/16/2020 Service Request Inspection Report <br /> SR0087879 SC131 12/17/2024
The URL can be used to link to this page
Your browser does not support the video tag.