Laserfiche WebLink
SAN <br /> J O A U I Environmental Health Department <br /> COUNTY AMENDED <br /> Grrarness grows hare, <br /> 6/12/2025 <br /> Service Request Inspection Report <br /> Name of Facility: BP ARCO AM/PM Date: 06/11/2025 <br /> Address: 9036 THORNTON RD , STOCKTON 95209 <br /> Requestor: ROBERT VELASCO,A&S ENGINEERING Telephone: (661)250-9300 <br /> Program Element: 2303- UST/PIPING INSTALLATION Request#: SR0087955 <br /> Inspection Type: 131 -UST INSTALLATION INSPECTION <br /> Onsite Service Technician: Robert Jacobs ICC Service Tech/Installer Exp. Date: 8/31/2026 <br /> Manufacturer training: OPW, 01/05/27;VR, 01/05/27 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> -Verified communication for VPH monitoring for all components except vapor recovery piping for 91 Fill Sump <br /> -Verified Dispenser footprints are contained by the UDC's- PASSED <br /> -Verified VPH Components were installed -PASSED <br /> -Overfill Prevention Testing -PASSED <br /> verified the following:flapper functionality for all tanks, use of correct tank charts for all tanks, OPE activates at 95%or less <br /> for all tanks. <br /> -Spill Bucket Test- PASSED <br /> verified the following: 5 gallon capacity, drainage via hand pump and 1 hour hydrostatic test <br /> -Sensor functionality- PASSED <br /> verified the following:functionality of all vacuum, brine and liquid sensors <br /> *Positive shut-down was not tested* <br /> -Verified Valid CDTFA number- PASSED <br /> NOTE: UST CERS submittal has been accepted. <br /> ***This facility is APPROVED to receive fuel <br /> ***This facility is NOT APPROVED to operate <br /> ->Additional inspections are required. Please see approval letter dated 8/14/2024 for a list of requirements. Schedule Inspection <br /> appointments by emailing UST@sjgov.org with a 48 hour advanced notice. <br /> SR0087955 SC131 06/11/2025 <br /> EHD Rev.09/16/2020 Page 1 of 2 Service Request Inspection Report <br />