My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9036
>
2300 - Underground Storage Tank Program
>
PR2500477
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 4:34:02 PM
Creation date
8/28/2025 4:19:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500477
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004289
FACILITY_NAME
ARCO 07193
STREET_NUMBER
9036
STREET_NAME
THORNTON
STREET_TYPE
RD
City
Stockton
Zip
95209
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
9036 THORNTON RD Stockton 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bravo’s B500 Series Singlewall and Doublewall <br />transition sumps are compatible with all common <br />motor fuels and can be ordered with standard AST <br />fittings pre-installed. The fittings range from <br />electrical offset (EO) to 3” compression pass-through <br />AST fittings. This series comes standard with positive <br />concrete anchoring and mounting points for optional <br />rack system. <br />Quality FRP construction, no need for gelcoat <br />for chemical resistance <br />“Planter” style raised lid to keep surface water <br />out <br />Accommodates up to 5 factory installed AST <br />fittings depending on model <br />Factory mounting points make a rack system <br />installation simple <br />30-year corrosion warranty <br />UL2447 listed <br />Doublewall construction can be monitored with <br />vacuum or hydrostatically making it triennial <br />testing exempt with continuous monitoring <br />Ships under a continuous 20” Hg vacuum test <br />B500 Series <br />Singlewall and Doublewall <br />Innovative Solutions for SecondaryContainment <br />www.sbravo.com | 800.282.7286 <br />DS-3.01_06.01 <br />SIZES <br />•Small 25.5” <br />•Large 41.5” <br />*See page 2 for dimension drawing and dimension chart <br />MATERIAL <br />•Fiberglass <br />•Epoxy coated galvannealedsteel <br />SPECIFICATIONS <br />Product Shownct Shown <br />B501 <br />own <br />01- <br />wn <br />1-S <br />Bravo’s B500 Series Singlewall and D <br />About the B500 Series <br />Page 1 of 2 <br />Bravo o Solutionon Center <br />Call or Text (323) 5414141-111-3851 <br />orders@sbravo.com <br />TRANSITION SUMPS
The URL can be used to link to this page
Your browser does not support the video tag.