Laserfiche WebLink
C f <br /> onnr ation of Training Attach ent E <br /> ST11 <br /> Conta inment Sotution Underground Fibergiass Tanks & DW Tank SUMPS <br /> Fiber Glass Systems UL Listed Primary & Secondary Containment Piping Systems <br /> Completion of education program, for all tank installation crews and this document are required to receive <br /> Acknowledgment of Completion and Wallet Cards. <br /> I completed a; Petroleum Tank FlowtiteO Water Tank Double-Wall Tank Sump UIL Piping Product <br /> installation Installation Installation Installation <br /> Education Includes: Minimum correct answers required: <br /> • Review of published installation instructions 38 out of 42 Petroleum', <br /> • Review of installation checklist 35 out of 37 Water-, <br /> • Review of procedures to obtain approval,for variances to installation instructions 18 out of 20 Double-Wall Tank Sump <br /> 32 out of 44 U L Listed Piping Systems <br /> Attendee Name(s) Attendee Name(s) <br /> SEAN MURPHY HELADIO REYES <br /> LATHAM ZUBILLAGA ALFREDO RAMIREZ <br /> ARIEL BARRANTES RAUL FLORES MENDEZ <br /> MIGUEL CEJA JAVIER OLIVER SANETLEZ <br /> LUKE QUACKENBUSH LUIS ESPARZA <br /> ISBAEL PAMATZ WILLIAM BARRANTES <br /> KEVIN CEJA <br /> 1,the undersigned,Fiber Glass Systems Trainer,certify that the educational session was completed for the above-listed employees of the Contractor Firrn <br /> listed below.The Contractor was made aware that they are responsible for implementing the installation methods described in the latest Installation <br /> Instructions whether or not a direct employee or representative of Fiber Glass Systems is present and that any variance from Fiber Glass Systems' <br /> Tank Installation Instructions must be approved in writing,by Tank Technical Support prior to the installation. <br /> MICHAEL L STRAWN 11 TOWN &COUNTRY CONTACTORS, INC. <br /> Fiber Glass Systems Trainer Signature-REQUIRED Contractor Firm Name-REQUIRED <br /> MICHAEL L STRAWN 11 MARK FARMER <br /> Fiber Glass Systems Trainer Printed Name-REQUIRED Mmary Company Contact-REQUIRED <br /> 7/26/2024 MARK@TCCONTRACTORS-COM <br /> Training Completion Date-REQUIRED Primary Company Contact Email-REQUIRED <br /> MICHAEL.STRAWN@ATT.NET 3206 LUYUNG DRIVE <br /> Fiber Glass Systems Trainer Email Address-REQUIRED Street Address-REQUIRED <br /> RANCHO CORDOVA, CA 95742 <br /> City,State Zip-RE QUIRED <br /> 916-636-9500 <br /> Telephone Number-REQUIRED <br /> Fiber Glass Systems I KOY National Oikvetivarco.Ah rights reserved.INST 6040-) <br />