My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9036
>
2300 - Underground Storage Tank Program
>
PR2500477
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 10:51:56 AM
Creation date
8/28/2025 4:19:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500477
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004289
FACILITY_NAME
ARCO 07193
STREET_NUMBER
9036
STREET_NAME
THORNTON
STREET_TYPE
RD
City
Stockton
Zip
95209
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
9036 THORNTON RD Stockton 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal & Cost Estimate <br /> CGRS <br /> ' oE <br /> lot <br /> ENHANCED LEAK DETECTION <br /> CGRS Contact: Tahtia Pearce 916-616-2233 <br /> tpearce@cgrs.com <br /> Date: May 9,2024 Customer Name: A&S Engineering <br /> Facility: Arco Address: 28405 Sand Canyon Rd#B <br /> Address: 9036 Thornton Rd City,State,Zip: Canyon Country,CA 91387 <br /> City,State,Zip: Thornton, CA 95209 Contact: Robert Velasco <br /> County: San Joaquin Telephone/Email: 818-746-6986/robertv@asengineer.com <br /> Scope of Work <br /> Perform pre and final ELD testing services at the above referenced location. Material costs are not included for iota test setups,however they will be <br /> installed by the fuel system installation contractor prior to CGRS arrival for pretesting.In addition,this estimate is based on our understanding of the fueling <br /> system,which is as follows: <br /> 1.Tanks -(1)25k and(1)12k/10k split double wall UST's-Brine filled <br /> 2.Sumps-(6)containing upper tank fittings and components <br /> 3.Under Dispenser Containment(UDC)-(6) <br /> 4.Vent and other Transition Sumps-(1) <br /> 5.Piping-(3)Product line(s)(DW FRP),(3)vent line(s)(DW FRP)and(1)vapor rec line(DW FRP) <br /> Costs for all testing work is based on our current fee schedule. Costs for the final ELD/iotaVision'" testing assume that all site work can be completed <br /> within 8 hours on site. If the work takes longer than the specified time due to no fault of CGRS,additional hourly fees will be incurred on a time and <br /> materials basis in accordance with our current fee schedule. <br /> Helium Pre-Testing (Accept O/Decline O) Initials <br /> Item No. Description Quantity Unit Price Extended <br /> 1 Test Primary System 1 flat rate $ 2,245.00 $ 2,245.00 <br /> 2 Helium 1 bottles $ 818.88 $ 818.88 <br /> 3 Mobilization&Perdiem 1 flat rate $ 875.00 $ 875.00 <br /> 4 Additional beyond 1 day Per diem 0 days $ 225.00 TBD <br /> 5 Additional testing hours beyond 8 hour day 0 hours $ 165.00 TBD <br /> 6 On-site standby time 0 hours $ 137.50 TBD <br /> Subtotal $ 3,938.88 <br /> Optional Pre-Testing on Secondary Pipe (Accept O /Decline O) Initials <br /> Item No. Description Quantity Unit Price Extended <br /> 1 Test Secondary Pipe(during Pre-Testing ONLY) 1 day $ 600.00 $ 600.00 <br /> Subtotal $ 600.00 <br /> Final Enhanced Leak Detection(ELD)Testing (Accept O /Decline O) Initials <br /> Item No. Description Quantity Unit Price Extended <br /> 1 Primary System Testing(Final ELD) 1 flat rate $ 6,823.88 $ 6,823.88 <br /> 2 Project Permitting&Admin Fee 1 flat rate $ 300.00 $ 300.00 <br /> 3 Mobilization&Perdiem 1 flat rate $ 875.00 $ 875.00 <br /> 4 Additional beyond 1 day Hotel/Per diem 0 days $ 225.00 TBD <br /> 5 Additional testing hours beyond 8 hour day 0 hours $ 165.00 TBD <br /> 6 On-site standby time 0 hours $ 137.50 TBD <br /> Subtotal $ 7,998.88 <br /> The Standard Terms and Conditions attached are incorporated by reference and form part of this Agreement. By signing this Ag reement,you accept <br /> the proposal and acknowledge that you have read,understand and agree to the Standard Terms and Conditions set forth in this Agreement. <br /> Accepted by Date <br /> Printed Name Title <br />
The URL can be used to link to this page
Your browser does not support the video tag.