TANK AND PIPING INSTALLATION SCOPE OE WORK: CLIENT:
<br /> bp
<br /> GENERAL: TOP OF TANK ELEVATION: ARCO LARGE SITE VARIANT - IF SITE HAS 9 OR MORE MPD'S, TWO (2) 2 HP VARIABLE SPEED TURBINES ARE TO BE INSTALLED IN THE PRIMARY
<br /> SCOPE OF WORK: UNLESS SPECIFIED OTHERWISE ON THESE DRAWINGS, THE GENERAL CONTRACTOR SHALL FURNISH ALL WORK AND MATERIALS TO CONTRACTOR TO CALCULATE TOP OF TANK ELEVATION. START WITH 18" MINIMUM DEPTH OF VAPOR RECOVERY LINE AT THE FARTHEST DISPENSER REGULAR UNLEADED TANK. THE REGULAR UNLEADED TURBINES SHALL BE SET UP AS "MASTER/SATELLITE/SATELLITE" AND THE CROSS CONNECTION
<br /> COMPLETE THE INSTALLATION OF THE SYSTEMS AND EQUIPMENT SHOWN IN THESE DRAWINGS AND AS REQUIRED BY PROJECT DOCUMENTS PROVIDED
<br /> AND SLOPE 1/4" PER FOOT MAXIMUM TO 1/8" PER FOOT MINIMUM. ADD 12" AT THE TANK. ADD 13" (FOR 3" PIPE) OR 8" (FOR 2") FOR A MANIFOLD BETWEEN TANKS SHALL BE OPENED ALLOWING ALL THREE TURBINES TO SERVE THE ENTIRE SITE.
<br /> TO THE CONTRACTOR. CHANGE IN PIPING DIRECTION OTHER THAN 90 OR 45 DEGREES. SET TANKS 6" DEEPER THAN CALCULATED AS PRECAUTION. IN NO EVENT SHALL
<br /> THE TANK BE BURIED LESS THAN 4'-0" BELOW FINISHED GRADE OR DEEPER THAN 7'-0" BELOW FINISHED GRADE. SEE MANUFACTURERS
<br /> WHERE THESE DRAWINGS DIFFER FROM LOCAL REGULATIONS, LOCAL REGULATIONS WILL SUPERSEDE THESE DRAWINGS IF THEY ARE MORE STRINGENT. INSTALLATION INSTRUCTIONS FOR MINIMAL TANK BURY WHEN DEADMEN ANCHORING IS NOT PROVIDED. ANY VARIATIONS IN SLOPE FROM 1/4" PER
<br /> NOTE: FOOT SHALL BE REPORTED TO OWNER'S ENGINEER.
<br /> THESE GUIDELINES APPLY ONLY TO UNDERGROUND STORAGE TANKS AND PRODUCT PIPING. REFER TO BALANCE OF SITE SPECIFIC DOCUMENTS/ TANK EXCAVATION: (9
<br /> CONTRACTOR TO EXCAVATE TANK HOLE. CONTRACTOR SHALL ADHERE TO O.S.H.A. STANDARDS ON EXCAVATIONS. CONTRACTOR MAY SELECT ANY OF
<br /> DRAWINGS FOR SPECIFICATIONS REGARDING CONCRETE/ASPHALT INSTALLATION, ELECTRICAL REQUIREMENTS, AND SANITARY & STORM SEWERS THE RECOMMENDED PRACTICES FOR TANK EXCAVATION AND MUST PROVIDE ALL NECESSARY PROTECTIVE BARRICADES.
<br /> INSTALLATION.
<br /> *** WHERE MULTIPLE VERSIONS OF THE SAME SHEET EXIST, INSERT *** SLOPE SIDES OF TANK HOLE (USE OF SLOPING MUST BE RECEIVE PRIOR APPROVAL ON INDIVIDUAL SITE BASIC FROM "BP") OR USE
<br /> SHORING FOR ALL TANK EXCAVATIONS IN ACCORDANCE WITH OSHA 1926 SUBPART P, OSHA STANDARDS - EXCAVATIONS; FINAL RULE
<br /> THE SHEET APPROPRIATE FOR THE SPECIFIC STATION LAYOUT. OCTOBER 1, 1989. WHEN ENGINEERED SHORING IS REQUIRED DUE TO SITE CONDITIONS AN ENGINEERED SHORING PLAN UTILIZING
<br /> ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY LINES, ELEVATIONS AND INTERLOCKING STEEL SHEET PILING SHALL BE PROVIDED AND SHALL INCLUDE SUPPORTING ENGINEERING CALCULATIONS BY A STATE (7) SIPHON LINE INSTALLATION:
<br /> EQUIPMENT LOCATIONS CERTIFIED ENGINEER AND SHALL BE THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR. STANDARD: WHEN SITE SPECIFIC TANK CONFIGURATION SHOWS MULTIPLE TANKS FOR IDENTICAL PRODUCTS, CONTRACTOR TO INSTALL 4" OVER 3"
<br /> ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. ANY DISCREPANCY SHALL GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF TRENCHES 5'-0" OR MORE DOUBLE WALL FIBERGLASS SIPHON LINES AND PIPING CONNECTION VALVES AND FITTINGS BETWEEN TANKS. INSTALL SIPHON PIPING AS LOW AS
<br /> BE CALLED TO THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE PROCEEDING WITH THE WORK. IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. POSSIBLE IN SUMP. NOTE LIMITATION ON MAXIMUM SIPHON PIPING SYSTEM HEIGHT ON DETAILS. ADJUST HEIGHT DOWN FOR SMALLER DIAMETER
<br /> TANK EXCAVATIONS SHALL BE THE MINIMUM SIZE REQUIRED TO PROVIDE FOR BEDDING AND CLEARANCES INDICATED IN THESE DRAWINGS. TANK TANKS. CONTRACTOR TO INSTALL VEEDER ROOT SIPHON BREAK, IF APPROPRIATE FOR MARKET CONDITIONS. SEE APPROPRIATE SITE SPECIFIC
<br /> ALL REQUESTS TO ADD, DELETE, OR SUBSTITUTE MATERIAL AND EQUIPMENT SHOWN ON THESE DRAWINGS MUST BE REVIEWED AND APPROVED BY BURIAL DEPTH FIELD DETERMINED TO PROVIDE FOR 1/4" (1/8" PER FOOT MIN.) PER FOOT FOR STAGE II VAPOR RECOVERY PIPING & 1/8" DRAWINGS FOR INSTALLATION DETAILS.
<br /> THE OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER, IN CHARGE OF THE PROJECT. ALL CHANGES MUST BE REVIEWED WITH MINIMUM PER FOOT FOR PRODUCT PIPING SLOPE BACK FROM DISPENSERS TO TANK. ARCO
<br /> THE MARKETING FUELS MANAGER. TANK STABILITY BUOYANCY CALCULATIONS:
<br /> THE CONTRACTOR IS REQUIRED TO FURNISH AS-BUILT DRAWINGS TO LOCATE TANKS AND PIPING AS INSTALLED AFTER THE COMPLETION OF THE TANK STABILITY SHALL BE RE-CHECKED AGAINST FLOATATION BY INSTALLING CONTRACTOR. SEE BUOYANCY CALCULATIONS ON TANK DETAILING SHEETS. ARCO BRANDED VARIANT: CONTRACTOR TO INSTALL 4" OVER 3" DOUBLE WALL FIBERGLASS SIPHON PIPING. SIPHON BREAK IS NOT INSTALLED.
<br /> PROJECT. TANK ANCHORING: INSTALL SIPHON PIPING AS LOW AS POSSIBLE IN SUMP. NOTE LIMITATION ON MAXIMUM SIPHON PIPING SYSTEM HEIGHT ON DETAILS. ADJUST BP WEST COAST PRODUCTS, LLC
<br /> CONTRACTOR TO INSTALL MANUFACTURER SUPPLIED TANK HOLD DOWN STRAPS & ANCHORS WHEN REQUIRED DUE TO HIGH WATER TABLE, LOCAL HEIGHT DOWN FOR SMALLER DIAMETER TANKS. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS.
<br /> (1 ) TANK INSTALLATION: REGULATIONS OR SPECIFIED BY SITE ENGINEER DESIGNER AND/OR OWNER'S REPRESENTATIVE OR HIS AGENT THE BP PROJECT MANAGER. WHEN NO. DATE DESCRIPTION
<br /> STANDARD: CONTRACTOR TO INSTALL DOUBLE WALL FIBERGLASS TANKS WITH COMPLETE "VEEDER ROOT PANEL" TANK AND PIPING MONITORING AND / / CALIFORNIA VARIANT: SIPHON PIPING TO BE INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB-2481 REQUIREMENTS
<br /> REQUIRED, THE ANCHORING SYSTEM SHALL BE IN COMPLIANCE WITH AUTHORITY HAVING JURISDICTION. ANCHOR & STRAPS TO BE INSTALLED ACCORDING TO 0
<br /> ALARM SYSTEM. TANKS TO BE SET MIN. 60 (8 BELOW FINISH GRADE. SEE SITE SPECIFIC INSTALLATION DETAILS FOR TANK SIZES AND LOCATIONS. MANUFACTURERS INSTRUCTIONS. ) PRODUCT PIPING INSTALLATION: Q
<br /> ** ALTERNATE ANCHORING BY USE OF A CONCRETE ANCHORING SLAB IS PERMITTED. WHEN GROUNDWATER LEVEL IS ANTICIPATED TO BE STANDARD: CONTRACTOR TO INSTALL DOUBLE WALL FIBERGLASS PRODUCT WITHIN 5 FT. OF GRADE CONTRACTOR SHALL NOTIFY OWNER'S REPRESENTATIVE FOR DIRECTION ON ANCHORING METHOD TO BE USED PIPING, CONNECTORS, VALVES AND FITTINGS IN TANK AND DISPENSER 2
<br /> Q
<br /> TANK SIZING GUIDELINES: SUMPS AS SHOWN ON SITE SPECIFIC DETAIL DRAWINGS TO SUPPLY DISPENSERS. PRODUCT PIPING TO BE N.O.V. RED THREAD IIA, 2" INSIDE 3
<br /> (DEADMAN OR ANCHORING SLAB) AND SUCH SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S RECOMMENDATION. "
<br /> 3
<br /> SPECIFIC BUSINESS UNIT TANK SIZE REQUIREMENTS ARE RECOMMENDED. TANK SIZING MODELS CAN BE RUN BY CONTACTING FUEL SYSTEM DESIGN DIAMETER AS INDICATED ON SITE SPECIFIC FUELING PLAN. ALL PIPING AND FITTINGS SHALL BE UL-971 LISTED IN COMPLIANCE WITH THE JULY 2005 a
<br /> MANAGER - AMERICAS. ** THIS PROCEDURE IS REQUIRED IN NYC AND CONSIDERED PART OF SCOPE OF WORK WHEN INSTALLING TANKS IN NYC. PERFORMANCE STANDARDS, AND SHALL BE COMPATIBLE WITH ETHANOL, INCLUDING BUT NOT LIMITED TO "E25/1320" (25% ETHANOL 75% GASOLINE). 0
<br /> LOCATION OF TANKS AND ASSOCIATED EQUIPMENT ON PROPERTY: FINAL FACILITY EQUIPMENT LOCATIONS INCLUDING PLACEMENT AND PRODUCTS LINES TO BE EQUIPPED 3 GPH PRESSURE LINE LEAK DETECTORS (PLLD) ON TURBINES AND WITH LIQUID LEAK MONITORING SENSORS
<br /> ORIENTATION OF TANKS, EMERGENCY SHUTOFF SWITCHES, OVERFILL ALARMS (IF PRESENT) TO BE APPROVED BY BP DISTRIBUTION PRIOR LOCATED IN TURBINE PIPING SUMPS ATTACHED TO TANKS WIRED FOR TURBINE SHUT DOWN. PRODUCT PIPING IN TURBINE SUMPS, PRODUCT PIPING
<br /> TO SUBMITTAL FOR PERMITS TO ENSURE CLEAR AND SAFE ACCESS TO THE UNDERGROUND TANKS FOR UNLOADING OPERATIONS. THE CROSS CONNECTION MANIFOLDS BETWEEN SUMPS AND SIPHON PIPING PENETRATIONS ARE TO ENTER THE SAME SIDE OF THE SUMP IF POSSIBLE. IF
<br /> GENERAL CONTRACTOR IS RESPONSIBLE FOR CONFIRMING APPROVED TANK AND EQUIPMENT LOCATIONS HAS BEEN DOCUMENTED W/ BP FILTER FABRIC: IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE FOR THE INSTALLATION OF FILTER FABRIC (DUPONT TYPAR OR MIRAFI PRODUCT PENETRATION ENTERS ON BOTH SIDES OF SUMP DUE TO FIELD CONDITIONS, THEN DUAL SENSORS AT TURBINE SUMP MAY BE REQUIRED
<br /> DISTRIBUTION, THE SITE ENGINEER AND/OR OWNERS REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER PRIOR TO THE 50OX ) WHICH IS REQUIRE FOR WET HOLE INSTALLATIONS OR UNSUITABLE SOILS. (NOTE: A WET HOLE/ UNSUITABLE AREA REQUIRING TO BE INSTALLED BY LOCAL REGULATIONS. IF THE BP PROJECT MANAGER DETERMINES THAT THE ALL THE PIPING ENTRIES NOTED ABOVE COULD 0
<br /> COMMENCEMENT OF WORK. FILTER FABRIC IS ANY TANK EXCAVATION IN WHICH THE AREA IS SUBJECT TO: TIDAL INFLUENCES, OR AREAS SUBJECT TO FREQUENTLY Q
<br /> HAVE BEEN MADE TO THE SAME SIDE OF THE SUMP, THEN ANY COSTS ASSOCIATED WITH EXTRA SENSORS SHALL BE BORNE BY THE INSTALLING s
<br /> LANDFILL TYPE AREAS OR SWAMP PEAT BOG OR MUCK OR WATER CONDITIONS WITH SILTY SOIL, , , , ,
<br /> "TANK EXCLUSION ZONE NOTE" THE UST STRUCTURAL EXCLUSION ZONE SHALL BE ESTABLISHED AS 16'-0" AS MEASURED FROM THE EXTERIOR FACE CHANGING GROUND WATER LEVELS, CONTRACTOR. PIPING TO BE INSTALLED WITH A SLOPE OF 1/8" PER FOOT MINIMUM TO TANKS UNLESS APPROVED BY OWNER. CONTRACTOR TO
<br /> OF ANY UNDERGROUND STORAGE TANKS LOCATED WITHIN THE SITE PLAN. THE PURPOSE OF THIS ZONE IS TO ACT AS AN ENGINEERING BARRIER TO ANY OTHER SITUATION WHERE THE SOIL IS INHERENTLY UNSTABLE, OR SOILS WITH LESS THAN 250 LBS./SQ. FT. COHESION, OR WITH AULTIMATE BEARING CAPACITY OF LESS THAN 500 LBS./SQ. FT., OR AT THE REQUEST OF THE TANK OWNER. ALL WET HOLE BALLAST INSTALL TRACER TAPE WITH PRODUCT PIPING PER TRENCHING DETAILS. PENETRATIONS INTO ALL SUMPS SHALL BE MADE WITH DOUBLE WALL FRP
<br /> PREVENT THE RISK OF DAMAGE TO OUR UST'S FROM STRUCTURAL ELEMENTS THAT ARE TOO CLOSE TO THE EXCAVATION WALLS, RESULTING IN INSTALLS AS DESCRIBED IN SECTION BELOW ENTRY FITTINGS. TESTING OF PRODUCT LINES SHALL BE PERFORMED PRIOR TO BACK FILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. SEE ALATERAL INSTABILITY AND TRANSFER OF LOADS INTO THE TANK HOLE AND POTENTIALLY DAMAGING OUR TANKS ( ) SHALL USE FILTER FABRIC. SITE SPECIFIC DETAIL SHEETS FOR INSTALLATION DETAILS. 0
<br /> TANKS: FILTER FABRIC SHALL EXTEND 1 FOOT ABOVE MAX HIGH WATER TABLE AND SEAMS SHALL BE OVERLAPPED BY 1 FOOT. MATERIAL SHALL
<br /> SHALL BE UNDERWRITERS LABORATORY APPROVED LISTED FOR THE UNDERGROUND STORAGE OF ALL FLAMMABLE AND COMBUSTIBLE MOTOR FUELS BE PINNED OR OTHERWISE SECURED ALLOW BACKFILL WITHOUT DISTURBANCE. USE OF PLASTIC, OR ANY OTHER MATERIAL THAT MAY TEAR, ***NOTE*** "FIBERCAST SYSTEMS" PIPING TO BE INSTALLED PER MANUFACTURER'S INSTALLATION MANUAL AND SHALL ONLY BE INSTALLED BY 0
<br /> AS CALLED FOR ON THE SITE SPECIFIC DRAWING OR AS DESIGNATED ON THE SUPPLEMENTAL CONDITIONS AND SHALL BE DOUBLE WALL TANKS OF OR DEGRADE OVERTIME IS PROHIBITED. QUALIFIED INSTALLERS CERTIFIED BY THE MANUFACTURER.
<br /> FIBERGLASS REINFORCED PLASTIC (FRP). INSTALLATION OF TANKS AND PIPING SHALL BE IN ACCORDANCE WITH U.L. LISTED MANUFACTURER'S CALIFORNIA VARIANT: IN ADDITION TO THE ABOVE, PIPING TO BE INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB-2481
<br /> INSTRUCTIONS. INSTALLATION SHALL CONFORM TO NFPA-30/30A AND ALL APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS. TANKS SHALL WET HOLE BALLAST METHOD: REQUIREMENTS 0
<br /> ONLY BE INSTALLED BY QUALIFIED INSTALLERS CERTIFIED BY THE STATE IN WHICH THE TANKS ARE TO BE INSTALLED AND BY THE TANK WATER IS THE SUITABLE MEDIUM FOR BALLAST DURING WET HOLE TANK INSTALLATIONS. A PROPERLY INSTALLED 12 FOOT HIGH TEMPORARY VENT PIPE
<br /> MANUFACTURER. MUST BE INSTALLED BY THE CONTRACTOR. IF WATER IS USED TO BALLAST TANKS, THE WATER IS TO BE COMPLETELY PUMPED OUT & MOPPED DRY IN (9) VENT PIPING INSTALLATION: '
<br /> THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT STORED. ALL CONTINUOUS MONITORING ORDER TO PROTECT FUEL INTEGRITY. CONTRACTOR IS REQUIRED TO COORDINATE BALLASTING OPERATIONS WITH OWNER'S REPRESENTATIVE OR HIS AGENT, STANDARD: CONTRACTOR TO INSTALL 2" INDIVIDUAL SINGLE WALL FIBERGLASS VENT PIPING, CONNECTORS, VALVES AND FITTINGS ON TANKS AS SEAL:
<br /> DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. THE BP PROJECT MANAGER. IT IS THE INSTALLING CONTRACTORS RESPONSIBILITY TO DETERMINE THE JURISDICTIONAL REQUIREMENTS AND ACCEPTANCE INDICATED ON SITE SPECIFIC FUELING PLAN AND ACCOMPANYING DETAILS. CONTRACTOR TO PROVIDE AT LEAST 4 FEET OF PIPING RUN BEFORE A
<br /> ALL MATERIALS USED IN THE INSTALLATION SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY
<br /> FOR BALLASTING THE TANKS AND TO PROVIDE FOR PROPER DISPOSAL OF THE BALLASTING MEDIUM UNDER THE REGULATIONS OF THE GOVERNING CHANGE OF DIRECTION OF 30 DEGREES OR MORE IN ORDER TO PROVIDE MECHANICAL FLEXIBILITY PER CODE REQUIREMENTS. CONTRACTOR TO RECOGNIZED CODES, LOCAL CODES AND GOVERNING AUTHORITIES. AUTHORITY. INSTALL TRACER TAPE WITH VENT PIPING PER TRENCHING DETAILS. PENETRATIONS INTO ALL SUMPS SHALL BE MADE WITH SINGLE WALL ENTRY ESS/p
<br /> FOR LONG PIPING RUNS 1/8"VENT PIPING SHALL BE DESIGNED AND INSTALLED FOR SLOPE 1/4" PER FOOT MINIMUM BACK TO TANKS.
<br /> METHANOL COMPATIBILITY: FOR ALL METHANOL COMPATIBLE STORAGE SYSTEMS, ALL READILY ACCESSIBLE COMPONENTS SHALL BE METHANOL BACK FILL: FITTINGS. Gf-1q0��
<br /> COMPATIBLE FOR THE IMMEDIATE INTENDED SERVICE. CONTRACTOR TO PROVIDE ALL BACK FILL REQUIRED FOR THE PROJECT SCOPE. PEA GRAVEL SHALL CONSIST OF NATURALLY ROUNDED AGGREGATE, PER FOOT IS ACCEPTABLE.
<br /> BIO-DIESEL COMPATIBILITY: CURRENTLY AT THIS TIME, NO TANKS ARE LISTED FOR BIO-DIESEL SERVICE APPLICATIONS. MINIMUM 1/8" AND MAXIMUM 3/4" SIZE. FREE OF CLAY, SLAG, CINDERS, OR DEBRIS. ALL SUBSTITUTES MUST BE APPROVED BY MANUFACTURER AND CONTRACTOR TO INSTALL ABOVE GROUND RISERS AND MOUNTING RACK AS DETAILED ON THESE PLANS. TERMINATION POINT OF TANK VENTS TO BE �) (�'
<br /> OWNERS FIELD REPRESENTATIVE. NO. 36475
<br /> INITIAL TANK TESTING: A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY LINE THAT CAN BE BUILT UPON. VENT RISERS NO 3 3 7-5
<br /> NEW TANKS SHALL BE INSPECTED UPON ARRIVAL AT SITE, AFTER UNLOADING FROM THE TRUCK, FOR VISUAL DAMAGE PRIOR TO INSTALLATION. NO MORE THAN 5% (BY WEIGHT) MAY PASS THE #8 SIEVE FOR BACK FILLING NONMETALLIC TANKS WITH A 96% TO 98% FREE FALL COMPACTION. DRY SHALL BE INSTALLED IN ACCORDANCE WITH NFPA-30, 2022 CALIFORNIA FIRE CODE REQUIREMENTS AND CARB EVR REQUIREMENTS. XP.
<br /> 24
<br /> - FOR DRY ANNULAR SPACE TANKS AIR/SOAP TESTS MUST BE PERFORMED AT THE JOB SITE PRIOR TO INSTALLATION TO VERIFY THE ABSENCE PEA GRAVEL DENSITY MINIMUM OF 95 POUNDS PER CUBIC FOOT IS REQUIRED. SUPPLY QUARRY CERTIFICATION MEETING ASTM C-33, PARAGRAPH 9.1 CIVIL
<br /> OF DAMAGE. REQUIREMENTS. CONTRACTOR TESTING OF VENT LINES SHALL BE PERFORMED PRIOR TO BACK FILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. SEE SITE OF
<br /> - FOR LIQUID FILLED ANNULAR SPACE TANKS - AIR/SOAP TESTS ON ACCESSORIES AND FITTINGS CAN BE PERFORMED AFTER THE TANK IS IN BACK FILLING OF TANK EXCAVATIONS SHALL BE PROVIDED IN LIFTS AS PER TANK MANUFACTURER'S INSTALLATION INSTRUCTIONS. SPECIFIC DETAIL SHEETS FOR INSTALLATION DETAILS. SEE FIBERGLASS PIPING MANUFACTURER SPECIFICATION BELOW.
<br /> THE EXCAVATION BEFORE OR AFTER BACKFILLING. VENT PIPING SPECIFICATION:
<br /> PRODUCT, VENT, AND VAPOR PIPING SHALL BE LAID AND CONTINUOUSLY SUPPORTED ON A 6 BED OF COMPACTED PEA GRAVEL. BLOCKS, PLANKS,
<br /> CONTRACTOR SHALL COMPLETE ALL TESTING ACCORDING TO MANUFACTURER'S INSTRUCTIONS FOR THE TANKS. CONTRACTOR SHALL COMPLETE ALL OR OTHER DEBRIS SHALL NOT BE USED TO SUPPORT PIPING IN FINAL INSTALLATION.
<br /> WARRANTY VALIDATION TESTING AND PROVIDE DOCUMENTATION TO OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER. NOTE: UNDER NO CIRCUMSTANCES SHALL DIRT, PAVING MATERIALS, WOOD, OR OTHER CONSTRUCTION DEBRIS BE ALLOWED TO REMAIN IN TANK AND FIBERCAST SYSTEMS: RED THREAD II PIPE AND FITTINGS (USED FOR SINGLE WALL). WHERE DOUBLE WALL SYSTEMS ARE REQUIRED FOR ALL VENT
<br /> PIPE EXCAVATIONS. AND VAPOR PIPING, USE SIZE OVER SIZE RED THREAD II PIPING AND FITTINGS. USE ONLY FIBERCAST SYSTEMS ALCOHOL COMPATIBLE ADHESIVES. z
<br /> HYDROSTATICALLY MONITORED DOUBLE WALL TANKS SHALL BE TESTED ACCORDING TO MANUFACTURER'S INSTRUCTIONS BY: ALL PIPING AND FITTINGS SHALL BE UL-971 LISTED IN COMPLIANCE WITH THE JULY 2005 PERFORMANCE STANDARDS. w
<br /> - INSPECT AND ADJUST RESERVOIR LEVEL OF THE MONITORING FLUID (TO COVER THE RIBE INSIDE THE RESERVOIR. (2) ANNULAR SPACE HYDROSTATIC MONITOR AND RISER INSTALLATION:
<br /> STANDARD: CONTRACTOR TO INSTALL 4" FIBERGLASS RISER AND VEEDER ROOT HYDROSTATIC SENSOR AT TANK ANNULAR SPACE LOCATION NOTED PIPING TO BE INSTALLED PER MANUFACTURER'S LISTED INSTRUCTIONS AND SHALL ONLY BE INSTALLED BY QUALIFIED INSTALLERS CERTIFIED BY THE co
<br /> co
<br /> - REMOVE ENOUGH TANK FITTING PLUGS TO SEE INSIDE THE PRIMARY TANK. VISUALLY INSPECT THE TANK INTERIOR FOR COLORED MONITORING a rn
<br /> FLUID TRACES. ON THE PLANS PER MANUFACTURERS INSTRUCTIONS. MANUFACTURER. PROVIDE AT LEAST 4 OF STRAIGHT PIPING RUN BEFORE A CHANGE OF DIRECTION OF MORE THAN 30 DEGREES AND INSTALL U z m o
<br /> - CONNECT TANK TEST MANIFOLD AND PRESSURIZE THE PRIMARY TANK TO 5 PSIG MAX. (3 PSIG MAX. FOR 12' TANKS). MONITOR THE FLEXIBLE CONNECTORS AT THE VENT AND VAPOR CONNECTION AT THE TANK SUMPS, AND DISPENSER SUMPS. Z � N
<br /> PRESSURE FOR 30 MINUTES FOR ANY LOSS IN PRESSURE THAT MAY INDICATE A LEAK. (3) TANK SUMP INSTALLATION: Z TD w r
<br /> - DO NOT PRESSURIZE THE ANNULAR SPACE. DOING SO MAY DAMAGE THE PRIMARY TANK OR CAUSE TANK FAILURE. `n `�
<br /> STANDARD: CONTRACTOR TO INSTALL 42' OR 48' DIAMETER TURBINE SIDE FIBERGLASS POLYSIDED SUMPS ON TANKS PER MANUFACTURER'S m Z U in
<br /> - WHILE UNDER PRESSURE, COVER FITTINGS AND MANWAY(S) WITH SOAP SOLUTION AND INSPECT. INSTRUCTIONS. NOTE THAT THE ORIENTATION OF THE TANK SUMPS MUST BE CORRECT IN ORDER TO FACILITATE CORRECT PIPING INSTALLATION INTO o — a a
<br /> - AFTER COMPLETING AIR TEST, RELEASE PRESSURE; REMOVE ALL GAUGES, VALVES, AND HOSE ASSEMBLIES; REPLACE AND TIGHTEN FITTING w cr m d v x
<br /> THE SUMPS. SEE ACCOMPANYING DETAILS IN PLAN SET AND NOTE SIZES OF SUMPS PER PROJECT DEMOGRAPHICS. LJJ cc Q
<br /> LL
<br /> PLUGS; AND REPLACE THE PLASTIC VENT PLUG IN THE OPEN FITTINGS. JURISDICTIONAL VARIANT: INSTALL DOUBLE WALL SIZE OVER SIZE FIBERGLASS PIPING WHEN REQUIRED BY AUTHORITY HAVING JURISDICTION. ii
<br /> I < LJJ Z o o
<br /> ***NOTE*** HYDROSTATIC FLUID RESERVOIR LEVEL MUST BE RECHECKED TO VERIFY TANK INTEGRITY PRIOR TO INTRODUCING BALLAST INTO TANKS. CALIFORNIA VARIANT: VENT PIPING TO BE DOUBLE WALLED AND INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB-2481 zOvZ O rnREQUIREMENTS (� C7 U CU o
<br /> FIELD REPAIR OF TANKS: IT IS ALLOWABLE TO FIELD REPAIR DAMAGED TANKS AFTER APPROVAL BY BP FILED ENGINEER. ALL TANKS DAMAGED INZ Z 'n
<br /> TRANSPORT OR OFF LOADING OPERATIONS SHALL BE FIELD REPAIRED BY A TANK MANUFACTURER'S CERTIFIED FIELD SERVICE REPRESENTATIVE. TANK ARCO BRANDED VARIANT: 48" DIAMETER TURBINE SUMPS ARE INSTALLED. g z w zz ZO N
<br /> MANUFACTURER SHALL RE-CERTIFY REPAIRED TANKS FOR USE. ALL FIELD SERVICE WORK SHALL BE DOCUMENTED. COPIES OF ANY AND ALL FIELD (1 O) STAGE II VAPOR RECOVERY PIPING INSTALLATION: m W w a z
<br /> SERVICE DOCUMENTATION SHALL BE PLACED IN THE PROJECT FILE AND INTO OWNERS OPERATING FILE. CALIFORNIA VARIANT: 42" DIAMETER FILL SUMPS TO BE DOUBLE WALLED AND INSTALLED WITH CONTINUOUS HYDROSTATIC MONITORING DEVICE PER (n z 'o Q C°
<br /> STANDARD: CONTRACTOR TO INSTALL 3 SINGLE WALL FIBERGLASS STAGE II VAPOR RECOVERY HEADER, CONNECTORS, VALVES AND FITTINGS TO THE 0 o U
<br /> TANK MEASUREMENTS: AB-2481 REQUIREMENTS. LOWEST OCTANE GRADE AS INDICATED ON SITE SPECIFIC FUELING PLAN AND ACCOMPANYING DETAILS. NOTE THAT THE 1ST CONNECTION FROM STAGE °6 w N w
<br /> THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE FOLLOWING TANK MEASUREMENT ACTIVITIES: II VAPOR RECOVERY HEADER TO LOWEST OCTANE TANK SHALL BE 3". ALL OTHER CONNECTIONS TO ADDITIONAL TANKS SHALL BE MADE WITH 2". Q 0 Z
<br /> (4) TANK LEVEL GAUGE OVERFLOW PROTECTION: o
<br /> 1. VERIFY THE EXTERNAL SIZE OF THE TANK TO MATCH WITH MANUFACTURER SUPPLIED SHOP MEASUREMENTS. CONTRACTOR TO INSTALL 3" TO 2" REDUCING TEES WHERE HEADERS BRANCH TO DISPENSERS. MAXIMUM (2) DISPENSERS PER 2" BRANCH. Z =
<br /> TRANSFER THE SIZE, SERIAL NUMBER, AND PRODUCT INSTALLED, AND POSITION OF TANK TO THE AS-BUILT PLAN. STANDARD: CONTRACTOR TO INSTALL VEEDER ROOT MAGNOSTRICTIVE PROBE LEVEL GAUGE AT LOCATION NOTED ON PLANS PER MANUFACTURER'S CONTRACTOR TO PROVIDE AT LEAST 4 FEET OF STRAIGHT PIPING RUN BEFORE A CHANGE OF DIRECTION OF 30 DEGREES OR MORE IN ORDER TO z m
<br /> 2. TRANSFER TANK DIMENSIONAL AND PRODUCT INFORMATION TO THE DATA SHEET IN THE TANK GAUGE CONSOLE. INSTALLATION INSTRUCTIONS. PROVIDE MECHANICAL FLEXIBILITY PER CODE REQUIREMENTS. CONTRACTOR TO INSTALL TRACER TAPE WITH VAPOR PIPING PER TRENCHING DETAILS.
<br /> 3. PROVIDE THE TOP OF TANK ELEVATION READING AT BOTH ENDS OF EACH TANK. PENETRATIONS INTO ALL SUMPS SHALL BE MADE WITH DOUBLE WALL ENTRY FITTINGS. STAGE II VAPOR RECOVERY PIPING SHALL BE DESIGNED AND 0-
<br /> TANK DEFLECTION MEASUREMENT PROCEDURE: OVERFLOW PROTECTION. UST OVERFLOW COMPLIANCE IS ACHIEVED BY USE OF OVERFLOW PREVENTION DROP TUBE FLAPPER VALVE SET AT 95% AND INSTALLED FOR 1/4" PER FOOT MINIMUM SLOPE BACK TO TANKS. AT LARGE SITE LAYOUTS, 1/8" PER FOOT MINIMUM IS ACCEPTABLE IF IT AVOIDS DEVELOPMENT INFORMATION:
<br /> DEFLECTION MEASUREMENT BEFORE AND AFTER TANK INSTALLATION SHALL BE ACCORDING TO MANUFACTURER'S REQUIREMENTS AND SHALL BE
<br /> IS IN ACCORDANCE WITH FEDERAL AND STATE GUIDELINES FOR UST OVERFILL REQUIREMENTS. USING A KNOCK OUT SUMP (VAPOR POT) OR HAVING EXCESSIVE TANK DEPTH. CONSULT OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP WITHIN MANUFACTURER'S TOLERANCES. ALL INFORMATION SHALL BE COMPLETED AS PER THE MANUFACTURER'S WARRANTY DOCUMENTATION. AN OVERFILL ALARM AND ACKNOWLEDGE SWITCH TIED INTO THE VEEDER ROOT AUTOMATIC TANK GAUGE SYSTEM. THE MONITORING SYSTEM PROVIDES PROJECT MANAGER, WHERE DISCREPANCIES OCCUR.
<br /> AN AUDIBLE AND VISUAL ALARM WHEN THE TANK(S) ARE FILLED TO THE 90% LEVEL. CONTRACTOR TESTING OF STAGE II VAPOR LINES SHALL BE PERFORMED PRIOR TO BACK FILL, PRIOR TO PAVING AND BEFORE STATION OPERATION.
<br /> (5) FILL AND STAGE I VAPOR RECOVERY INSTALLATION: SEE SITE SPECIFIC DETAIL SHEETS FOR INSTALLATION DETAILS. SEE FIBERGLASS PIPING MANUFACTURER SPECIFICATION BELOW.
<br /> STANDARD: CONTRACTOR TO INSTALL 4" GALVANIZED FILL AND STAGE I VAPOR RECOVERY RISERS. CONTRACTOR TO INSTALL DROP TUBE ASSEMBLY. STAGE II PIPING SPECIFICATION:
<br /> WITH OVERFILL PREVENTION DROP TUBE. CONTRACTOR TO INSTALL VENT AND STAGE II FLEX CONNECTORS AND FRP ADAPTERS. LOCATE AND CUT
<br /> DOUBLE WALL PENETRATIONS INTO SUMPS FOR THE ROUTING OF VENT AND STAGE II VAPOR PIPING INTO TURBINE SUMPS AND MAKE CONNECTIONS TO VENT AND FIBERCAST SYSTEMS: RED THREAD II PIPE AND FITTINGS (USED FOR SINGLE WALL). WHERE DOUBLE WALL SYSTEMS ARE REQUIRED FOR ALL VENT
<br /> FRP TANK I =..A" VAPOR PIPING FIBERGLASS PIPING. CONTRACTOR TO INSTALL DOUBLE SIDED PENETRATION ENTRY BOOTS FOR ALL ENTRIES INTO SUMPS. CONTRACTOR AND VAPOR PIPING, USE SIZE OVER SIZE RED THREAD II PIPING AND FITTINGS. USE ONLY FIBERCAST SYSTEMS ALCOHOL COMPATIBLE ADHESIVES. SITE ADDRESS:
<br /> DOUBLE WALL TO INSTALL STATIC GROUNDING SYSTEM AT ALL FILL AND VAPOR RISERS PER INSTALLATION DETAILS SHOWN ON SHEET G.0.7.2. ALL PIPING AND FITTINGS SHALL BE UL-971 LISTED IN COMPLIANCE WITH THE JULY 2005 PERFORMANCE STANDARDS.
<br /> FRP TANK i.D.="B"
<br /> CONTRACTOR TO INSTALL CARB APPROVED STAGE I MANHOLES WITH 5 GALLON SPILL COLLECTION BUCKETS. INSTALL PRODUCT AND FILL ADAPTERS AND ADDRESS
<br /> PIPING TO BE INSTALLED PER MANUFACTURER'S LISTED INSTRUCTIONS AND SHALL ONLY BE INSTALLED BY QUALIFIED INSTALLERS CERTIFIED BY THE CAPS. SEE ACCOMPANYING DETAILS IN SITE SPECIFIC PLAN SET FOR MANUFACTURER AND INSTALLATION REQUIREMENTS. MANUFACTURER. PROVIDE AT LEAST 4' OF STRAIGHT PIPING RUN BEFORE A CHANGE OF DIRECTION OF MORE THAN 30 DEGREES AND INSTALL 9036THORNTON ROAD
<br /> FLEXIBLE CONNECTORS AT THE VENT AND VAPOR CONNECTION AT THE TANK SUMPS, AND DISPENSER SUMPS. STOCKTON,CA 95209
<br /> BEFORE BACK FILL AFTER BACK FILL JURISDICTIONAL VARIANT: INSTALL DOUBLE WALL SIZE OVER SIZE FIBERGLASS PIPING WHEN REQUIRED BY AUTHORITY HAVING JURISDICTION.
<br /> TANK INSPECTION AND INSTALLATION - DEFLECTION MEASUREMENT DESIGNED BY:
<br /> DIPSTICK PREPARATION (6) TURBINE INSTALLATION: CALIFORNIA VARIANT: STAGE II VAPOR PIPING TO BE DOUBLE WALLED AND INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB-2481
<br /> DRIVE A SMALL HEADED, NON-SPARKING (E.G. BRASS) NAIL HALFWAY INTO A WOODEN DIPSTICK, 1 INCH ABOVE ITS BASE. REQUIREMENTS. ALL CONNECTIONS TO THE TANKS SHALL BE MADE WITH 3". CHECKED BY:
<br /> STANDARD: CONTRACTOR TO INSTALL FE PETRO IST 2 HP VARIABLE SPEED TURBINES AND PIPING CONNECTION VALVES AND FITTINGS IN TANK SUMPS
<br /> FIRST DIAMETER READING (PRIOR TO BACK FILL) AS SHOWN ON SITE SPECIFIC DETAIL DRAWINGS. ALL PRODUCT LINES TO TURBINES TO BE EQUIPPED WITH 3 GPH ELECTRONIC LINE LEAK DETECTION. DRAWN BY: ER
<br /> 1. PLACE THE DIPSTICK INTO A SERVICE FITTING. LEAK DETECTORS ARE TO BE TESTED FOR THE 3 GPH LEAK DETECTION PRIOR TO START UP. CONTRACTOR TO PROVIDE TEST DATA AT THE TIME OF THERE ARE (4) FOUR STAGE II EVR WITH ISD DESIGN CHOICES THAT MAY BE INCORPORATED INTO THE UST SYSTEMS IN CALIFORNIA. DATE: PROJECT NO:
<br /> 2. MEASURE AND RECORD THE DISTANCE FROM THE TANK BOTTOM TO THE TOP OF THE FITTING. ,� 1. VEEDER ROOT CARBON CANISTER VAPOR POLISHER WITH VST BALANCE HANGING HARDWARE AND VEEDER ROOT ISD COMPONENTS.
<br /> PUNCH LIST AS WELL AS INCLUDE IN CLOSE OUT BINDER. ALL TURBINES ARE EQUIPPED WITH STANDARD R CHECK VALVE AS A STANDARD FROM
<br /> 3. PULL THE DIPSTICK UP UNTIL THE EXPOSED NAIL CATCHES ON THE INSIDE TOP OF TANK. .� 2. HEALY CLEAN AIR SEPARATOR WITH HEALY VACUUM ASSIST HANGING HARDWARE AND VEEDER ROOT ISD COMPONENTS. 09/15/2023
<br /> 4. MEASURE THE DISTANCE FROM THE TANK TOP (INSIDE) TO THE TOP OF THE FITTING. SUBTRACT 1 INCH FROM THIS MEASUREMENT AND FACTORY. SET TURBINE INTAKES 5 FROM BOTTOM OF TANKS. TURBINES TO EQUIPPED WITH INTAKE FILTER SCREENS. CONTRACTOR INSTALL 3. VST ECS VAPOR PROCESSOR WITH VST BALANCE HANGING HARDWARE AND VEEDER ROOT ISD COMPONENTS.
<br /> 1" RIGID STEEL CONDUITS FOR SUBMERSIBLE PUMP POWER. (ONE FOR EACH TURBINE). CONTRACTOR IS TO LABEL TURBINES AND CONTROLLERS AS DRAWING TITLE:
<br /> RECORD THE DISTANCE. TO WHICH PRODUCT THEY SERVE. GREEN CONTROLLER LIGHTS ARE TO GO OUT WHEN TURBINES ARE OFF OR LOSE POWER. IST PUMP CONTROLS ARE 4. VST BALANCE HANGING HARDWARE WITH FRANKLIN FUELING/HEALY CLEAN AIR SEPARATOR AND VEEDER ROOT ISD COMPONENTS. TANK AND PIPING
<br /> 5. SUBTRACT THE SECOND DISTANCE FROM THE FIRST AND RECORD THIS VALUE AS READING A ON THE INSTALLATION CHECKLIST. TIED TO VEEDER ROOT CONTROL PANEL. SEE APPROPRIATE TURBINE CONFIGURATION AND PROGRAMMING SHEETS. SEE GENERAL SHEETS G.0.6 SERIES DRAWINGS FOR DESIGN INTENT DETAILS ON THE ABOVE SYSTEMS. SCOPE OF WORK
<br /> SECOND DIAMETER READING (AFTER BACKFILL) AND GENERAL NOTES
<br /> 1. PLACE THE DIPSTICK INTO A SERVICE FITTING WITH A STANDPIPE INSTALLED TO SUBGRADE. SINGLE MASTER TURBINE CONFIGURATIONS - EQUIPPED AS NOTED ABOVE. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. FRP 1 OF 3
<br /> 2. MEASURE AND RECORD THE DISTANCE FROM THE TANK BOTTOM TO THE TOP OF THE STANDPIPE.
<br /> 3. PULL THE DIPSTICK UP UNTIL THE EXPOSED NAIL CATCHES ON THE INSIDE TOP OF TANK. MASTER-SATELLITE TURBINE CONFIGURATIONS - EQUIPPED AS NOTED ABOVE EXCEPT: ONLY THE MASTER TURBINE SHALL HAVE THE PLLD LEAK
<br /> 4. MEASURE THE DISTANCE FROM THE TANK TOP (INSIDE) TO THE TOP OF THE STANDPIPE. SUBTRACT 1 INCH FROM THIS MEASUREMENT AND DETECTOR INSTALLED. CONTRACTOR TO REMOVE THE STANDARD "R" CHECK VALVE OUT OF THE SATELLITE TURBINE. THE BALL VALVE ON MANIFOLD LINE SHEET NO:
<br /> RECORD THE DISTANCE. BETWEEN TURBINES SHALL BE SET IN THE "OPEN" POSITION AND A SINGLE PLLD PART #848-480-001 (TLS350) OR
<br /> 5. SUBTRACT THE SECOND DISTANCE FROM THE FIRST AND RECORD THIS VALUE AS READING "B" ON THE INSTALLATION CHECKLIST. DPLLD PART #859080-001 (TLS450) IS TO BE INSTALLED ON THE MASTER IST WITH AN FE. PETRO NON-VENTED PRECISION CHECK VALVE (PART #65 (10A) DECOMMISSIONING STAGE II VAPOR RECOVERY:
<br /> CALCULATION AND COMPARISON PSI) INSTALLED ON THE SATELLITE IST PREVENTING BACKFILLING OF USTs. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS.
<br /> 1. SUBTRACT READING "B" FROM READING "A"• STANDARD: FOR PROJECTS INVOLVING THE DECOMMISSIONING OF STAGE II VAPOR RECOVERY SYSTEMS, G.C. IS TO VERIFY WITH THE AUTHORITY
<br /> 2. COMPARE THIS VALVE TO THE TABLE OF "MAXIMUM ALLOWABLE DEFLECTIONS" SHOWN ON THE "INSTALLATION CHECKLIST". MASTER-MASTER TURBINE CONFIGURATIONS - EQUIPPED AS NOTED ABOVE EXCEPT: THE BALL VALVE ON MANIFOLD LINE BETWEEN TURBINES SHALL BE
<br /> HAVING JURISDICTION
<br /> G ,0,2 , 1
<br /> 3. VERTICAL DEFLECTION IN EXCESS OF THESE VALUES INDICATES IMPROPER INSTALLATION AND VOIDS THE TANK WARRANTY.
<br /> SET IN THE "CLOSED" POSITION DURING NORMAL OPERATION. SEPARATE LINES & (2) PLLDs PART #848-480-001 (TLS350) DECOMMISSIONING PROCEDURES I LONGERS NO ARE REQUUIR D E TO EIMPLEMENTED.UIRED AT A S SEE I FIC FACILITY
<br /> I SHEETG 665. FOR INITIATINGRE GE O NERAL REQUIREMENTS AND
<br /> G WORK AND WHICH
<br /> PROCEDURES.
<br /> OR (2) DPLLDs PART #859080-001 (TLS450) SHALL BE INSTALLED. IN CASE OF FAILURE OF AN INDIVIDUAL IST, THE PRODUCT CROSS-OVER LINE CONSULT OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER, WHERE DISCREPANCIES OCCUR BETWEEN THE CONTRACT
<br /> MAXIMUM DEFLECTION FOR 8'-0" TANKS = 1-1/4" CAN BE PLACED INTO OPERATION BY OPENING THE CROSS CONNECTING VALVE. THE FAILED IST MUST HAVE ITS PLLD DISABLED & DISPENSER SIGNAL DOCUMENTS AND THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. VERSION 15.0 2023 SERIES
<br /> MAXIMUM DEFLECTION FOR 10'-0" TANKS = 1-1/2" WIRES NEED TO BE MODIFIED FOR THIS TEMPORARY SET-UP. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS.
<br />
|