Laserfiche WebLink
4" FILL ADAPTER AND CAP IN SPILL 37 38 CLIENT: <br /> CONTAINMENT FILL BOX (TYP.) <br /> FIBRELITE. MULTI-PORT DUAL POINT FIL 28 bp <br /> SPILL CONTAINMENT ASSEMBLY W/ (2) 5 4" MIN. TO <br /> GALLON SPILL BUCKETS CARB STAGE I EVR10 TOP OF SPILL <br /> COMPLIANT PER VR-102, BUCKET 5 GALLON SPILL CONTAINER O - NOTES <br /> NO DRAIN VALVE (TYP.) #WATERTIGHT SUMP SHIELD 28 18" 3'-88" (�SDA <br /> BOOT AND CLAMPS 1 2 3 4 14 THICKENED CONCRETE O SLOPE CONCRETE AWAY FROM ALL MANHOLES 1" RISE OVER 12" RUN <br /> MINI HYDROSTATIC 212 SLAB (TYP.) <br /> SENSOR IN BRINE 2O FIBER REINFORCEMENT TO BE USED. PRE-MIX UNIFORMLY THROUGHOUT <br /> FACTORY SUPPLIED ° p a a (TAPE Z CONCRETE. <br /> RESERVOIR DEPTH 6" <br /> ° G G MIN. 12 cn O3 REINFORCING BARS TO BE NO LESS THAN 2" AND NO MORE THAN <br /> MAX.) 4" FROM SURFACE. <br /> Q 4 O REINFORCE CONCRETE SLAB AROUND MANHOLE WITH 4-#3 REBAR 60" I <br /> PEA GRAVEL BACKFILL (TYP.) 6 6 WIDE DETECTABLE UNDERGROUND LENGTH. PLACE REBAR 6" FROM SIDES OF BOX. <br /> ° MARKING TAPE <br /> 2-IN-1 SENSOR BOX 217 /� I EMPIRE MAGNATEC #32-143 ONE 1" STANDARD MONITORING HOMERUN CONDUIT TO EACH TANK. <br /> FOR STANDARD MONITORING DEVICES, LOOP CONTAINMENT SUMP <br /> JUNCTION BOX 188 I 22 4" GALV. STEEL RISERS STAGE I VAPOR SENSORS, PLLD, VAC SENSORS & TANK GAUGE TO TANK INTERSTITIAL <br /> RISER IS IN SAME PLANE AS TANK LEVEL O SENSOR LOCATION AND HOMERUN TO BLDG. PROVIDE SEAL-OFFS IN <br /> SEE STATIC GROUNDING DETAILS I 9 GAUGE IN THIS VIEW BUILDING & PRIOR TO LEAVING HAZARDOUS AREA. ROUTE TO ARCO <br /> ON SHEET G.0.7.2 (TYP.) INTRINSICALLY SAFE TROUGH IN BUILDING. CONDUITS SHALL CONTAIN <br /> #4 STRANDED BARE CU ONLY LOW VOLTAGE WIRING FOR SENSORS. ALL CONDUIT PENETRATIONS <br /> GROUND WIRE TO OTHER I MUST BE MADE WITH ROBROY PVC COATED CONDUIT ONLY. <br /> TANKS (TYP.) I BP WEST COAST PRODUCTS, LLC <br /> #4 STRANDED BARE CU O PEA GRAVEL BACKFILL. ALL SUBSTITUTES MUST BE APPROVED BY <br /> GROUND WIRE TO MANUFACTURER AND OWNER'S FIELD REPRESENTATIVE. NO. DATE DESCRIPTION <br /> GROUND ROD (TYP.) I PIPING SHALL BE LAID AND CONTINUOUSLY SUPPORTED ON A 6" Q EV. PER SJCEHD ORRECTIONS <br /> 05 06 2024 ER <br /> 1" FRP BONDED ENTRY FITTING O8 124 ____ 7O COMPACTED PEA GRAVEL BEDDING. PIPING SHALL NOT BE 0 EV. PER SJCEHD ORRECTIONS <br /> (TYP.) I I _ __ SUPPORTED BY BLOCKS, PLANKS, OR OTHER DEBRIS. <br /> 06 21 2024 R <br /> 1" MONITORING CONDUIT I ALL ENTRIES TO BE PERPENDICULAR TO CONTAINMENT SUMP. OFFLINE <br /> INSTALLATION NOT PERMITTED. <br /> 5 187 O <br /> (ROUTED TO INTERSTITIAL) II <br /> (ROBROY THROUGH SUMP ONLY) II 5 <br /> 42" DOUBLE WALL POLYGON SUMP I 14 148 3" OVER 2" FIBERGLASS O9 REAM ALL RISERS FOR FULL PIPE BORE IF REQUIRED. 0 <br /> � CROSSOVER CONTAINS VACUUM <br /> BODY (8) Q <br /> ( ) FLAT PANELS TUBING ONLY TO VAC SENSOR s <br /> ASSEMBLY 1 p COVERS SHALL BE PRIMED AND PAINTED ACCORDING TO SPECIFICATIONS. <br /> INSTALL TANK ID MARKERS IN THE SPILL CONTAINMENT MANHOLES. 0 <br /> SUMP MONITOR LIQUID SENSOR 202 H I 12 126 3" D.W. FRP BONDED ENTRY FITTING Qs <br /> MOUNTED IN HOLDER M.5.3.15 & 4 x3 CONCENTRIC REDUCER W/ 1 1 SECONDARY CONTAINMENT IS REQUIRED FOR ALL VENT AND STAGE II <br /> 20 EXTRACTOR FITTING TEST PORT & PLUG VAPOR RECOVERY PIPING. 0 <br /> 4"x4"x2" <br /> 1/4" DRAIN/TEST 12 NOT USED A <br /> BUSHING. FACTORY A <br /> OVERFILL PROTECTION DROP INSTALLED TO TEST LAYOUT TANKS & STAGE II VAPOR RECOVERY PIPING SUCH THAT THE 0 <br /> TUBE SET AT 95% (TYP.) 41 16 CONTINUITY <1,3> STAGE II PIPING DRAINS & ENTERS INTO REGULAR UNLEADED TANK FIRST Al <br /> A: SECTION VIEW - FILL SIDE SUMP (DIESEL TANK) W/ 3" CONNECTIONS, AND CONTINUES 3" TO OTHER TANKS. <br /> SCALE: 3/4" = 1'-0" CONCRETE SHALL BE THICKENED AT THE THE FILL SUMPS DOWN TO <br /> 14 BELOW THE TOP OF CONTAINMENT OF THE DOUBLE WALL SUMP AS <br /> REQUIRED. DIMENSION OF SLAB THICKNESS VARIES WITH SITE CONDITIONS <br /> i <br /> MINI HYDROSTATIC SENSOR IN CROSSING FLEX CONNECTORS MUST MAINTAIN A MINIMUM OF 2 INCH SEAL: <br /> 1 BRINE FACTORY SUPPLIED <5> CLEARANCE OR THE USE OF AN ANTI CHAFING DEVICE MUST BE <br /> MANWAY JACK SCREW (TYP.) 8„ 8„/1/ RESERVOIR 2L INSTALLED. <br /> 3" D.W. FRP BONDED ENTRY FITTING & OVERFLOW PROTECTION: UST OVERFLOW COMPLIANCE IS ACHIEVED BY <br /> 26 2 w H SUMP MONITOR LIQUID SENSOR ESS/p <br /> 4"x3" CONCENTRIC REDUCER W/ TEST N �' 202 USE OF OVERFLOW PREVENTION DROP TUBE FLAPPER VALVE SET AT F <br /> M.5.3.15 MOUNTED IN HOLDER � � GI{q0�� <br /> PORT & VACUUM TUBING ROUTED TO J I I I 95% AND IS IN ACCORDANCE WITH FEDERAL AND STATE GUIDELINES �} <br /> VAC SENSOR � 14 148 3" OVER 2" FIBERGLASS CROSSOVER 16 FOR UST OVERFILL REQUIREMENTS. <br /> 2" INSIDE 3" DW F.G. VACUUM CONTAINS VACUUM TUBING ONLY TO NO. 36475 <br /> MONITORED VENT LINE �� ;�----- o ----�,. �� VAC SENSOR ASSEMBLY AN OVERFILL ALARM AND ACKNOWLEDGE SWITCH TIED INTO THE VEEDER � XP. 6-30-24 <br /> ROOT AUTOMATIC TANK GAUGE SYSTEM. THE MONITORING SYSTEM <br /> 11 14 148 \ o / 12 126 3" D.W. FRP BONDED ENTRY FITTING PROVIDES AN AUDIBLE AND VISUAL ALARM WHEN THE TANK(S) ARE 9 C/VIL <br /> & 4 x3. CONCENTRIC REDUCER W/ FILLED TO THE 90% LEVEL. (,K CAUF�� <br /> � TEST PORT & PLUG <br /> 2" BELL X MALE ADAPTER (TYP.) 14 I � NOTE: CONTRACTOR TO USE ADDITIONAL <br /> 16 2" CAP. DRILL HOLES IN END AND GALVANIZED FITTINGS AS REQUIRED TO <br /> 2"X18" FLEX CONNECTOR 15 74 I I INSTALL GROMMETS FOR TUBING MINIMIZE BENDS IN FLEXIBLE CONNECTORS <br /> PASS THROUGH <br /> TA L 4" VAPOR RECOVERY ADAPTER & CAP IN SPILL XX NOTE: INDICATES ITEMS FOUND ON MATERIALS LIST SHEETS M.5.3.01 z <br /> 39 40 CONTAINMENT FILL BOX. PER CARB EVR VR-102, & M.5.3.02 w <br /> 4" FILL ADAPTER AND CAP IN SPILL 37 38 NO DRAIN VALVE TO BE INSTALLED ON VAPOR <br /> CONTAINMENT FILL BOX i I I I w co <br /> RECOVERY SPILL BUCKET 0 r, <br /> ALL MANHOLE ACCESS COVERS TO BELOW GRADE d z m o <br /> SHALL BE LIQUID TIGHT AND LOCKABLE z � piN <br /> 0 0 — z � 1— <br /> CO 7 <br /> 28 FIBRELITE. MULTI-PORT DUAL POINT FILL SPILL (.D O cn r <br /> ----- ---- CONTAINMENT ASSEMBLY W/ (2) 5 GALLON SPILL m Z v o Q <br /> BUCKETS CARB STAGE I EVR COMPLIANT PER ❑ cc Q v <br /> DIAMOND PLATE VR-102, a W W z U_ <br /> 42 DIA. BRINE MONITORED DOUBLE WALL I I W z O ~ o <br /> CONTAINMENT SUMP (TYP.) (I I� Z o z D M <br /> B: PLAN VIEW - FILL SIDE SUMP DIESEL TANK Ci W z O <br /> z z ❑ z N <br /> gwLLjQ } r <br /> z � Q � <br /> � c� o0 <br /> 06 z ' <br /> w00C\j w <br /> Q O o <br /> 33" O.D. (SINGLE FILL) z <br /> z <br /> Q <br /> J <br /> DEVELOPMENT INFORMATION: <br /> PRODUCT SYMBOLOGY <br /> 0 <br /> I <br /> - OPTION: <br /> Ld z PAINT API PRODUCT <br /> ❑ z O SLAB ACCESS BOX <br /> w - ' --�� CODE COLOR ON LID <br /> SLIP ON RISER 42" I.D. Z J w SHOWN WITHOUT LID r,-- ID COLLAR <br /> m Cn <br /> FIELD SEALED JOINT. <br /> (ADHESIVE SUPPLIED DW POLYGON BODY Q Q API COLOR-SYMBOL SYSTEM <br /> W/ KIT) Q FOR PRODUCT IDENTIFICATION SITE ADDRESS: <br /> ------ ---------------------- <br /> f i <br /> Product Name & Tank Fill I.D. ADDRESS <br /> STAGE I VAPOR 9036 THORNTON ROAD <br /> STOCKTON,CA 95209 <br /> BUS HING X 1/4 SS ; RED CIRCLE RECOVERY <br /> BUS <br /> INSTALLED AT <br /> unleaded premium I with ethanol _` FILL <br /> FACTORY 1 1 a, o PORT <br /> I <br /> N BLUE CIRCLE <br /> FACTORY unleaded plus with ethanol DESIGNED BY: <br /> LAY-UP THIS AREA TO REMAIN <br /> DW COLLAR WHITE CIRCLE CHECKED BY: <br /> BONDED TO t! unleaded with ethanol GREY OR WHITE <br /> TANK DRAWN BY: ER <br /> ,________ __ � � � YELLOWDATE: PROJECT N0: <br /> ----------------------------- - <br /> - ------ ------------ - <br /> _ ______________________________ _ _ _ I I diesel #2 luhra-lowsulfur' 1/ �� 09/15/2023 <br /> JOINT DETAILS - <br /> - --------- I 2 ORANGE CIRCLE � �� 8" ACCESS PORT <br /> Vapor Recovery TO BE ORIENTATED DRAWING TITLE: <br /> OCONTRACTOR TO ADDITIONALLY GLASS WRAP & LAMINATE AT CONNECTION FOLLOWING CURING OF 42" DIA. POLYGON SUMP BODY TO THE SAME DIESEL FILL SUMP <br /> ADHESIVE. SPECIFIC ATTENTION MUST BE GIVEN TO SURFACE PREP AS TESTING REQUIREMENTS (8) 17 3/8" FLAT PANELS WHITE CIRCLE, SIDE AS TANK INSTALLATION DETAILS <br /> WILL DETECT THE SMALLEST OF FLAWS. ALL MATERIALS MUST BE COMPATIBLE WITH GASOLINE, Observation/Monitoring Wells BLACK TRIANGLE LEVEL GAUGE OPW <br /> GASOLINE WITH 15% MTBE (METHYL TERTIARY-BUTYL ETHER), OR GASOLINE WITH 10% ETOH 1/4" DRAIN/TEST BUSHING. <br /> (ETHANOL). FIBERGLASS AND RESIN MUST EXTEND 1/2" BEYOND COVERAGE OF ADHESIVE. NOTE: FACTORY INSTALLED (DOUBLE WALL VENT) <br /> OTHE STRAP CHANNEL IF PRESENT ON THE FILL SIDE SUMP DOES NOT "COMMUNICATE" WITH CONTRACTOR SHALL BE HELD RESPONSIBLE REF: API 1637 - PRODUCT SYMBOLS SHEET NO: <br /> THE INSIDE OF THE SUMP. CONTRACTOR TO BE SURE TO LEAVE UNOBSTRUCTED PATH FOR FOR PROPER INSTALLATION & PREPARATION NOTE: THE ABOVE SYMBOLS REPRESENT INDUSTRY GUIDELINES FOR <br /> STRAP TO PENETRATE INTO THE CHANNEL SO THAT TANKS MAY BE PROPERLY ANCHORED. PER MANUFACTURERS INSTRUCTIONS AND PRODUCT IDENTIFICATION. CONSULT LOCAL DISTRIBUTION MANAGER FOR <br /> SHALL REINSTALL SUMPS IF HYDROSTATIC LOCAL METHOD OF PRODUCT IDENTIFICATION TO BE USED. <br /> C: DOUBLE WALL FILL SUMP RISER TESTING SHOWS LEAKING IN THIS AREA OF <br /> SCALE: 3/4" = 1'-0" THE SUMP. M ,5 ,318 <br /> , <br /> STANDARD API COLOR AND ACCESS COVER IDENTIFICATION <br /> IDENTIFICATION SYMBOLS SCALE: NONE STANDARD TWO POINT FILLsCALE: NONE VERSION 15.0 2023 SERIES <br />