Q
<br /> CUENT:
<br /> SPECIFICATIONS AND COMPATIBLE FLUIDS REQUIREMENTS GBERAL NOTES ��
<br /> POIFNIW. 1111ITY CONFUM CONTRACTOR SMALL HEED VDC�AL EXISTING AID
<br /> d Q .•..a'.� _• _. _ NEW UTILITIES PRIOR TO CONSRAICTIOH. SEE M" CO NOTE
<br /> WATER, STORM, AND SANITARY SEVER SEANCE SHE" G MPAO%IRATM R15mm ON THE TABLE BELOW LISTS VEIDFA-ROOT LINE TEAK DETECTOR SPECIFICATIONS — —._.—
<br /> FIBERGLASS PRODUCT PIPING (REGULAR)
<br /> ' FE30 SU MEEYS; AND 'AS-BOAT' BIAS.VERIFY E DIAIIE mAND LOCI 4WD - FIBERGLASS Pft000CT PIPING (PflELIUM)
<br /> WMOQ`" •� Q - ELEVAT N THE FA511NG UTILITIESNSTRUC TO ANYTIME PANCIES AND E LOCATION
<br /> (M0. SPECIFICATION -25 O 1307 • r • • r • • - FIBERGLASS FIBERGLASS PRODUCT PIPING (DIESEL)
<br /> ME ID PI R m� NC DISCREPANCIES LN BE> E gnaHroWE CdAPAn6tE FUELS UNLEADED GASOLINE FlBEAClA55 VAPOR RECOVERY PIPING
<br /> IMKEDIATE ATTENTION OF ME OYMERS A REPRESENTATIVE, MD OWNERS CML LEADED GASOLINE
<br /> FNGNEFR. - - - - - - - - - FIBERGLASS VENT PIPING
<br /> SAN JOAQUIN COUNTY 0- 00SX PET/ETHANOL
<br /> UNLEADED
<br /> •' ` LY' "_ P Q"`. r 0-100 ■ ETIRANOL - - - - - -�-�_ FIBERGLASS CROSSOVER VACUUM PIPING
<br /> ,^ •.Q e I VU YCo�Ll� Nm K :" 10X ENANOL/ 9OX UNLEADED INSTALLATION MGM
<br /> eR»/ ,ENVIRONMENTAL HEALTH DEPARTM 1511MTBE/ 55X UNLEADED
<br /> CAUIK7N DIESEL CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE THAT THE OPERABLE SYSTEM MEETS THE DESIGN INTENT AND THE CONTRACTOR
<br /> Q ! 91001ESEL (UP TO 81 IS PERMITTED O ADJUST PIPING LOCATIONS BASED ON ACTUAL FIELD CONDITIONS AND INSTALLATION TECHNIQUES.
<br /> ..s..0 0 p. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION�r I': 1868 E. HAZELTON AVE. JET(ENE • PRODINSTAUCT.
<br /> VAPOR D VENT
<br /> PIPING
<br /> IS
<br /> TO SLOPE PER FOOT.
<br /> TANK I/6' PER FOOT MINIMUM, 1/4' PER FOOT PREFERRED. IF
<br /> Q,...: DIMENSION. AND DEPTH OF ALL EXISTING UTILITIES MHETUER SHOWN ON '.
<br /> • THESE PLANS OR NOT BY POT HOLING THE UTILITIES AND SURVEYING [' CKT 9 C AVIATION GASOLINE • SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY. ALL PRODUCT PIPING TO BE DOUBLE CONTAINMENT
<br /> - INCLUDE AL AND VERTICAL LOCATION PRIOR) 22 CONSTRUCTION. THIS LL STOCK TON,, ON, CA •7�ZOJ PIPE VENT AND VAPOR RECOVERY SHALL E DOUBLE WALL.
<br /> HOl1NGEN1 OF N THE EXISTING UTILITIES(A�COCATION OF NEW IITUTYTi `) �6,�m 120 GPM MAX W/ SWIFTCHECKVALVE
<br /> '" ' Q- • CRO55INGS O PHYSICALLY VERIFY WHETHER OR NOT CONFUCTS EXIST. {ZO�, 'fVV� ZO 0-70P8 0 INSTALL 10'0 DOUBLE WAIL FIBERGLASS TANKS VATH CONTINUOUS MONITORING OF HYDROSTATIC ANNULAR SPACES BY 'VEEDER ROOT' TANK AND PIPING
<br /> r LOCATIONS OF SAID UTIUTIES AS SHOWN ON THESE PLANS ARE BASED' P�N • 200 PS MONITOR AND ALARM SYSTEM. ALL TANK. SUMPS SHALL BE INDIVIDUALLY CONTINUOUSLY MONITORED BY 'VEEIER ROOT" LIQUID SENSORS TIED INTO THE
<br /> THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT SU T THE 0N.`aM ��• ��e-ij j,��i�• 11 TANK & PIPING MONITOR SYSTEM. TANKS TO BE SET MIN. 60' BELOW FINISH GRADE. TANK INSTALLATION SHALL BE IN ACCORDANCE WIN "
<br /> r CONFUCTS SHOULD OCCUR. THE CONTRACTOR SHALL CONSULT THE 0 I+OVed MANUFACTURER'S INSTALLATION INSTRUCTIONS.
<br /> CIVIL ENGINEER O RESOLVE A11 PROBLEMS PRIOR T PROCEEDING NI � ula AAO
<br /> CONSTRUCTION. �pp� MIFTI y7 p5 O INSTALL A CONCRETE SLAB OVER TANKS. SURFACE WATER SHALL BE DIVERTED AWAY FROM EACH MANHOLE BY FORMING A CONCRETE CROWN WITH A
<br /> VICINITY MAP ^{ _ ro ►r��9� Remarks 1-1/2' DROP IN 18' FROM THE EDGE OF THE MANHOLE RING TO THE SURROUNDING SLAB ELEVATION. CONSTRUCT SLAB PER CIVIL SLAB INSTALLATION �+
<br /> 20 0 20 40 Q `}+}��1 p" p ` � ' `ema W DETAILS AND SPECIAL REQUIREMENTS SHOWN ON DETAILS ARCO
<br /> [�6LLATSV&. ' BIOIESEL ANT WIN ASTM 07467 (UP O 920) OR ASTM 00751. ( INSTALL FILL SPILL BUCKET 5 GALLON WITH ADAPTERS AND CMS SIP 11e8T COAST FPRgXICfB,LLC
<br /> P ANUFACTURER FOR COMPATIBILITY RATINGS ON FUEL BLENDS OO INSTALL VAPOR SPILL BUCKET 5 GALLON W1TIi ADAPTERS AND CMS.
<br /> GRAPHIC SCALE GREATER. �B20. NO. DATE DESCRIPTION
<br /> 1"=20'-O• _ INSTALL VARIABLE SPEED TURBINES IN UNDERGROUND STORAGE TANKS. CONFIGURE TURBINES AS REQUIRED. VERIFY PROGRAMMING REQUIREMENTS FOR
<br /> THAT EXCEEDS THESE MAIL VERTICAL PIPELINE HEIGHTS WILL REQUIRE ALTERNATING STARTS WITH LOCAL AGENCY AS REQUIRED. TURBINE SYMMS O BE EQUIPPED VAIN 3 GPH ELECTRONIC LINE LEAK DETECTION. LEAK
<br /> _ PIRT14 StILTATION. DETECTORS ARE T BE TESTED FOR THE 3 GPH LEAK DETECTION PRIOR T START UP. CONTRACTOR O PROVIDE TEST DATA AT THE TIME OF PUNCH
<br /> GRAPHIC SCALE 9 / LIST AS WELL AS INCLUDE IN CLOSE OUT BINDER. SET TURBINE INTAKES AT 5' FROM BOTTOM OF TANKS. TURBINES TO E EQUIPPED WITH INTAKE FILTER
<br /> . C - j ` •PUMP T RESSURE SHOULD BE MINIMUM OF 4 PS MOVE THE CHECK VALVES SCREENS CONTRACTOR 15 O LABEL TURBINES AND CONTROLLERS AS O WHICH PRODUCT THEY SRME. GREEN CONTROLLER LIGHTS ARE TO GO OUT
<br /> WHEN TURBINES ARE OFF OR LOSE POWER.
<br /> 1 1 ! I &i...! w ? I I © INSTALL 3' INSIDE C FIBERGLASS STAGE II VAPOR RECOVERY HEADER FOR VAPOR RECOVERY SYSTEM. SLOPE 1/8' PER FOOT MINIMUM O TANKS.
<br /> I 1 R �""r"••� �"'I Yfal 1 INSTALL 3' TO 2' REDUCING TEES WHERE HEADERS BRANCH O DISPENSERS. CONTRACTOR TO INSTALL TRACER TAPE WITH VAPOR PIPING. TESTING OF
<br /> 1 1 I / -�_____ • +� 'showr�and described ' I VARIER LINES STALL BE PERFORMED PRIOR TO BACKFlLL, PRIOR O PAYING AND BEFORE STATION OPERATION. SECONDARY CONTAINMENT TO BE
<br /> wd does w mjffl0&e or a I I INSTALLED WHEN REQUIRED BY LOCH. JURISDICTION ONLY. SEE DETAILS AND SCOPE OF WORK ON SHEETS G.0.2.1 & GA.2.2 FOR PIPE SIZING AT
<br /> P �. am18i'arf UNDERGROUND STORAGE TANKS
<br /> ............................ L._._._._._._._._._._._.
<br /> "" ;,•••'............ : < INSTALL 2' INSURE 3' DOUBLE WALL FIBERGLASS GASOLINE/ DIESEL SUPPLY UNES O DISPENSERS. PIPING SHALL BE INSTALLED PER MANUFACTURER'S
<br /> . .. ........... .
<br /> .... ............. ..... : .............. ....
<br /> .... '..... ............7.......................;...:.... ..............
<br /> L.__ ! I .... ....... .......... •..................................�" -.......... ......... .. ........... ,.............................. /8' THE FURTHEST DISPENSER SUMP DOWN
<br /> i _ ! F .... ..:...... ........ •. •••• • •...••• •••••• •.•••••••••• ....................... ............................ O THE TURBINE SUUMPS. CONNTR CTORPTOOINSTALLBTRACERA TME WITH PRODUCT PIPING TESTING OF PRODUCT LINES SHALL BE PERFORMED PRIOR T
<br /> BACKFILL, PRIOR TO PAYING AND BEFORE STATION OPERATION.
<br /> 1 •••••••••••• o o — _—_____—__—__—_____—__ __ REFER TO SLEET M&A08 FOR PIPING REQUIREMENTS
<br /> uc
<br /> T•-��•• 11 A
<br /> (P)CONVENIENCE STORE ,\ Ka�) INSTALL 'VEEDEN ROOT" TANK AND LINE ALARM CONTROL PANEL IN BUILDING AT NORMALLY OCCUPIED LOCATION IN BUILDING. SEE ARCHITECTURAL AND
<br /> I ❑ •• aADD SO.FT.� E•.: ELECTRICAL DRAWINGS FOR EXACT LOCATION.
<br /> ••/ ' • 7�. ® r I�I INSTALL 2- INSIDE 3- DOUBLE WALL FIBERGLASS VENT LINE FOR EACH UNDERGROUND STORAGE TANK. SLOPE 1/4' PER FOOT (1/8- PER FOOT MINIMUM)
<br /> l �-.-•• I O ® "• r,-,_,_,_,_„),_,_L, 0 O TANKS AS SHOWN. CONTRACTOR O INSTALL TRACER TAPE WITH VENT PIPING. A
<br /> •P TE.l 1
<br /> ( 10 WITHIN LLSN FROM ANYEW VENT IBNUILDINGD STRUCTURAL SUPPORT.OPENINC OR PROPERTY LINE hIINA71ON POINT AT CM E BUILT UPON. VEN TANK T RISERS SRALL MINIMUM
<br /> BE INSTIAIIED NV AC GRADE
<br /> CORDANCE WITH
<br /> :::::::::::::::::::E I
<br /> j 1 "" ..:. : '•• •••••••••• :::::•• UNIFORM FIRE CODE REQUIREMENTS. VERIFY LOCAL REGULATIONS FOR ADDITIONAL EQUIPMENT OR INSTALLATION REQUIREMENTS
<br /> I . ............... ...............
<br /> I _ ( 11 INSTALL A SINGLE 1' RIGID CALVANIIID CONCUR FOR EACH NEWLY INSTALLED TURBINE PUMP. EL
<br /> L._._._......... i 12 INSTALL DUAL FLOAT TANK ANNULAR SPACE HYDROSTATIC MONITORING SENSORS SEE DETAILS FOR CONDUIT LOOPING BETWEEN ANNULAR RISER
<br /> II ..... ........ . ,. I AND SUMPS.
<br /> INSTALL EXTRACT ASSEMBLIES FOR VENT. AND STALE 11 VAPOR RECOVERY AT TURBINE SIDE SUMP. VERIFY WIN LOCAL JURISDICTION FOR
<br /> r I •::::: _ _ 3 •�' I 13 OR ALTERNATE REQUIRED LOCATIONS.
<br /> PT
<br /> j 14 INSTALL .1 GPH MAC PROF TANK IEVII. GAUGES AT TURBINE SUMPS AS SHOWN. R
<br /> 0
<br /> - 1 —Y
<br /> .............. .
<br /> •• "-'-'-•-•-._.J ••••••• T •• � ............... TANKS B Y AR IDENTIFICATION MARKINGS AT FILL MANHOLES - _� 15 T SHALL E PROPERLY MARKED AND TAGGED WITH STANDARD API IDEA N0. 36475
<br /> ' %P. 6 30 24
<br /> _�_ - / ; I 16 INSTALL 2" INSIDE J• DOUBLE WALL. FRP CROSSOVER PIPE FOR VACUUM.
<br /> I
<br /> 1 " I 17 INSTALL WAYNE OVATION SERIES. SINGLE HOST: PER SIDE, MULTI-PRODUCT DISPENSERS AS SHOWN. DISPENSERS O BE FITTED NOR STAGE II HOSES. )rr
<br /> (P) I O HOLD ES AND BREAKAWAY VALVES PER LOCAL REQUIREMENTS. CONTRACTOR IS RESPONSIBLE FOR INSTALLING HOSES. NOZZLES AND BREAKAWAYS.
<br /> -•-•-•-•-•-•-•-•-• I T C003
<br /> 3 C.W. - - - - -' - - INSTALL UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING SENSORS. START UP BY MANUFACTURER
<br /> 13 1152 REPRESENTATIVE GENERAL CONTRACTOR TO PURGE UNES WIN N A MINIMUM OF 200 GALLONS THROUGH EACH HOSE/NOZZLE. ANY AIR POCKETS OR
<br /> START UP PROBLEMS DUE O IMPROPER INSTALLATION OR INCORRECT HIRING THAT DESTROYS ELECTRONICS MILL E BILLED BACK O THE
<br /> CONTRACTOR. AFTER PURGING THE PRODUCT UNES OF AIR AND BEFORE VAPOR RECOVERY TESTING, CONTRACTOR IS TO REPLACE THE FACTORY
<br /> •'T I I • / 2 INSTALLED GASOLINE FILTERS WITH NEW FILTERS.
<br /> tt P. V � rZ
<br /> I I I ✓ ! I INSTALL WAYNE OVATION SERIES, DUAL HOSE PER SIDE. MULTI-PRODUCT DISPENSERS AS SHOWN. DISPENSERS TO BE FITTED WITH STAGE II HOSES, lz
<br /> I I - NOZZLES AND BREAKAWAY VALVES PER LOCAL REQUIREMENTS CONTRACTOR IS RESPONSIBLE FOR INSTALLING HOSES, NOZZLES AND BREAKAWAYS. I m
<br /> I •\ -_�-_ 17 INSTALL UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING SENSORS. START UP BY MANUFACTURER K7 R
<br /> I i I �' ::•':::::::.' _ ® REPRESENTATIVE GENERAL CONTRACTOR TO PURGE UNES WITH A MINIMUM OF 200 GALLONS THROUGH EACH HOSE/NOZIIE. ANY AIR POCKETS OR („) m b
<br /> i j \ (P) START UP PROBLEMS DUE T IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS WALL BE BILLED BACK O THE Z g w n3
<br /> CANOPY �'-� E®� CONTRACTOR. AFTER PURGING THE PRODUCT UNES OF AIR AND BEFORE VAPOR RECOVERY TESTING, CONTRACTOR IS O REPLACE THE FACTORY t r
<br /> I I I .............. 0 A 4,60I SOFT. G ` JO,\ CCC INSTALLED GASOLINE FILTERS MTIH NEW FILTERS. UR p y m e
<br /> �' -- ---"•I I •• ••• \ \ \ �T �C� / C 18 FILL AND STAGE I VAPOR RECOVERY RISERS & ANNULAR RISER SHALL E GROUNDED O PREVENT STATIC DISCHARGE DURING FlWNG OPERATIONS SEE m Z U
<br /> w -
<br /> ��\ 7J•, % I ��I�J"ry�� 7 III / / 16 ;. O DWG. G.0.7.2 FOR CALIFORNIA DESIGN VAIN DOUBLE WALL SUMPS. w p V
<br /> 7, ` / / 19 INSTALL OVERFILL ALARM & ACKNOWLEDGMENT SWITCH. ESO AND MAINTENANCE RECEPTACLE IN LOCATION SHOWN. ALARM AND SWITCH O BE LOCATED UJ Z O m o
<br /> ::.
<br /> 1 I ` / �I O •�' O 7 ' '\ O PROVIDE AN UNOBSTRUCTED NEW TO MUCK DRIVER. PROVIDE BOLLARD PROTECTION OF FREE STANDING POLE SEE WIRING DIAGRAM AND DETAIL FOR I wm Z V o
<br /> I\ MOUNTING REQUIREMENTS. I1
<br /> I •• - _ I --t- 'r --_-_ •• ..).... <Z) INSTALL NEW HEALY VAPOR PROCESSOR UNIT, CONNECT T THE NEW GASOLINE VENT RISKS. z z Z o Z N
<br /> \ly cR••D�L� �j•. �• :: ' "• _•_• 21 INSTALL NEW 61 GUARD POST TO PROTECT NEW HEALY VAPOR PROCESSOR UNIT. a LLI w <� 6
<br /> 11 • . . LL�-1 +— f —_jf��iy M r•-'_' © INSTALL NEW 4.0 HORSESHOE BOLLARD O PROTECT NEW MPDS. En ? 1p-
<br /> 1 G:::• - - I � IRf •� (D o V
<br /> 7.
<br /> 9 INSTALL NEW EMERGENCY PUMP SHUT-OFF SWATCH. 06 w � w
<br /> I I "'• - • • - • • -••' L 1 6 r \ / I INSTALL NEW 2-AI PORTABLE FIRE EXTINGUISHERS IN A WEATHERPROOF CABINET. Q V z
<br /> 20-B:C. 0
<br /> 9 i NOTE FIRE EXTINGUISHER SHALL BE PROVIDED AND LOCATED NOT MORE THAN 75 FEET FROM MY PUMP, DISPENSER, OR STORAGE TANK FILL-PIPE z m
<br /> \
<br /> 1 I.•::•. _ _ - _ - _ \ \ 7 • 1 IS 18 \ / ,•.::::: 0 i OPENINGS. CFC 23M5. Tz,• i
<br /> © TO ALL NEW PIPING AND TANKS BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS, 7 1 L *• VV 'o 'III �1 .!:!;1:1Ti �—.—. =', W>oim4mi•' j r1
<br /> i '::• . - . . _ . . • V o' 6 1 goi FINAL FACUTY EQUIPMENT LOCATIONS TO BE APPROVED BY DISTRIBUTION TERMINAL MANAGER PRICER TO SUBMITTAL FOR PERMITS TO ENSURE GEAR OEVELOPNENT INFOWATION:
<br /> \ 1 I - • • - . • - _ - PARCEL © AND SAFE ACCESS TO THE UNDERGROUND TANKS FOR UNLOADING OPERATIONS.
<br /> _ 64.501.E SF/ 1. AC I 2I I
<br /> 25 TIT) Ij i T P i GENERAL COMPLIANCE NOTES
<br /> • - ' - _ - _ - 2 23 25 1DK 12K� li - _ - _ I. ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY ONES, ELEVATIONS AND EQUIPMENT
<br /> \CI _ _ :E: (01 • I :�:•• I L_._._._._.- LOCATIONS
<br /> (I11 00 . . _ . .
<br /> -
<br /> ••\::"'••'',"•,' Z ALL DIMENSIONS AND CONDITIONS SHALL E CHECKED AND VIIURED IN THE FIELD BEFORE STARTING AN K AN DISCREPANCY SHALL BE
<br /> H. / Y NOR Y
<br /> •.... ......... __.-..::..................•, __ __ ___ _____ _______ �_______________I _ CALLED TO THE ATTENTION OF THE INNERS ENGINEER FOR HIS DEd90N BEFORE PROCEEDING WITH THE MIRK.__ _ ___ _______ �•--_-_____________ ❑ SITE ADDRESS:
<br /> m . .. ................ .... ..... ............ .......'................... ... ::i:::::::::::::
<br /> ........ ......................."......::::"" ••• •• •• :::::::•: "�lY MIT FROM APPLICABLE AGENCIES FOR E%CAVATIONS OF TRENCHES 5'-0' OR MORE IN DEPTH
<br /> ... .............
<br /> .. ....... ..... ... �� ....: .. •••••••••••••••• ':::::::::::• J GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PER
<br /> •• ••••••••• ••••• ••••••••••••••••.•..�.+.::..::......' .. ......... .:::::I::::"""' •• INTO WHICH A PERSON IS REWIRED O DESCEND.
<br /> ..... ADDfE9S
<br /> R O 4 AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK OPERATIONS.
<br /> E0X IlgfRDII FWD
<br /> �-V ------- —---------------, ------------- ° & ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED CODES, LOCAL CODES AND �MCAMW
<br /> O - - - - - - m`� - - - - - O O GOVERNING AUTHORITIES
<br /> \ 19 6. THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPAT16LE WITH THE PRODUCT STORED.
<br /> • • p 5 11 3 1 6 11 If 7. ALL MONITORING DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS, DESIGNED BY:
<br /> • > \ IJ 14 18 / • 4 / • & GENERAL CONTRACTOR IS REWIRED TO PROVIDE 72 HOUR (TYPICAL) NOTIFICATION TO GOVERNING AGENCY PRIOR TO TANK INSTALLATION. GEC®or.
<br /> 9. TANK AND PIPING SYSTEM O BE INSPECTED BY OWNER'S THIRD PARTY INSPECTOR & GOVERNING AGENCY AT FOUR (4) DRAWN BY: ER
<br /> p \ SEPARATE CONSTRUCTION ERASES (SEE HOLE AND SOAP: DATE WROECT NO
<br /> p A. TANK AIR TEST BEFORE SETTING IN HOLE AND SOAR TEST.
<br /> p B. TANKS AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR JO MINUTES. OBI31/2023
<br /> ' ------/—� ----------- ------------ C. INSPECTION OF ALL SECONDARY CONTAINMENT. INCLUDING TESTING. IN ACCORDANCE WITH
<br /> MANUFACTURER'S GUIDELINES. DRAWING TITLE:
<br /> D. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE TEAK DETECTION SYSTEM.
<br /> ANDING WATER TO TOP OF
<br /> IO REDUCING ALL TANK COMPS AND OLAR FOR ANDER DISPENSER PERIOD OF 2244 HOURS TONNSUREMPS SHALL BE THAT THE SUMPS ARETATICALLY WATERTIGHT.SRRECO(LAKE RD THE TEST RESU WIN LTS AND SUBMIT O OWNER. UNDERGROUND TANK AND PIPING
<br /> SITE PLAN
<br /> III TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK AND INSTALLATION NOTES
<br /> SYSTEM BEING PLACED IN OPERATION. SHEET NO:
<br /> \ 12. PRIOR O FUEL BEING PUMPED, STATION MUST HAVE VEEDER ROOT FUNCTIONAL AND MONITORING ANNULAR SPACES OF TANK AND DISPENSER
<br /> SUMPS
<br /> O \ / 11 PAYMENT OF ALL APPLICABLE UST OPERATING FEES SHALL BE SUBMITTED TO THE GOVERNING JURISDICTION WITHIN 30 DAYS OF THE FINAL
<br /> Ev O INSPECTION. /'/F•�`� •//�/
<br /> DENCE OF FINANCIAL
<br /> TY SHALL BE
<br /> TTED TO GOVERNING
<br /> CY
<br /> BY BPI
<br /> O 14. MYIEASUREMENTS OF 13RINEREIEVELS IN TANKS SHALL BE TAKEN BY BP REPRESENTATIVE(DURNG THREE SEPARATE VISITS O STE AND PRIOR TO �FEEoE/�160
<br /> 9e Cry o O f6 EY M O 0 O FUEIJNG OPERATIONS REFER TO TANK MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR REQUIREMENTS.
<br /> RED
<br />
|