My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9036
>
2300 - Underground Storage Tank Program
>
PR2500477
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 10:51:56 AM
Creation date
8/28/2025 4:19:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500477
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004289
FACILITY_NAME
ARCO 07193
STREET_NUMBER
9036
STREET_NAME
THORNTON
STREET_TYPE
RD
City
Stockton
Zip
95209
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
9036 THORNTON RD Stockton 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> iota J& CGR <br /> ENHANCE❑LEAK O£T-TIDN <br /> SC7WTIONS❑ELIVEREd <br /> Test Certification <br /> Post Installation Enhanced Leak Detection (ELD) <br /> Location: CGRS Project No : 61-29281 <br /> Arco Test Date: March 31, 2025 <br /> 9036 Thornton Rd CGRS Techs: Adam Montejano <br /> Stockton, CA 95209 <br /> This document certifies that the UST systems listed below at the above referenced location have been tested <br /> and passed the iota° VaporTite V005 tightness test and iotaVisionTm 1-005. CGRS further certifies that the <br /> iota° VaporTite V005 and iotaVisionT' L005 meets the post installation testing requirements for post <br /> installation testing for newly installed underground storage tank systems as per the California Health and <br /> Safety Code,Chapter 6.7,section 25290.1(j)(1). <br /> Post Installation ELD Test Results <br /> 87 Octane Primary Containment System PASS <br /> 91 Octane Primary Containment System PASS <br /> Diesel Primary Containment System PASS <br /> IOTA Tech Signature: a 3/31/2025 <br /> Adam Montejano CA Tank Tester#1775 Date <br /> Reviewed by: 4, 4/1/2025 <br /> Chris urph Director,*- CA Services Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.