My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1014
>
2300 - Underground Storage Tank Program
>
PR2500513
>
INSTALL_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2025 8:24:03 AM
Creation date
8/28/2025 4:40:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2025
RECORD_ID
PR2500513
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004333
FACILITY_NAME
Rotten Robbie #69
STREET_NUMBER
1014
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Manteca
Zip
95337
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1014 S AIRPORT WAY Manteca 95337
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHEET NUMBER: <br />SHEET CONTENTS: <br />PROJECT NUMBER:PROJECT DATE: <br />CONSULTANTS: <br />REVISIONS: <br />18-046 12-24-2020 <br />DEVELOPER: <br />CONTRACTOR: <br />PROJECT: <br />PROFESSIONAL SEALS: <br />1014 S. Airport Road <br />Manteca, California <br /> 95336 <br />1 <br />2 <br />Robinson Oil Corporation <br />955 Martin Ave. <br />Santa Clara, CA 95050 <br />Sacramento, CA 95827 <br />PH:(916) 455-6500 FAX:(916) 455-8100 <br />3090 Fite Circle, #104 <br />K12 Architects, Inc <br />CONVENIENCE STORE & <br />FUELING CANOPY <br />MANTECA <br />3 <br />4 <br />PLAN CHECK JAN. 12, 2023 <br />OWNER CHANGE MARCH 17, 2023 <br />PLAN CHECK AUGUST 17, 2023 <br />PLAN CHECK MARCH 29, 2024 <br />PLAN CHECK hzmt MAY 10, 2024 <br />5 PLAN CHECK hzmt MAY 31, 2024 <br />6 PLAN CHECK hzmt AUGUST 7, 2024 <br /> February 03, 2025 <br />8 PLAN CHECK hzmt OCT. 26, 2024 <br />7 PLAN CHECK hzmt SEPT. 26, 2024 <br />10 PLAN CHECK hzmt JAN 29, 2025 <br />9 PLAN CHECK hzmt JAN 09, 2025 <br />18 <br />20 DIESEL TANK MONITORING <br />1/2" = 1'-0"SCALE: <br />87 UNLEADED FUEL TANK MONITORING <br />1/2" = 1'-0"SCALE: <br />FS7.0 <br />MONITORING <br />SYSTEM <br />MONITORING NOTES <br />ALL SENSORS TO BE CONNECTED TO THE TLS 450 <br />THE SYSTEM IS COMPRISED OF VACUUM SENSORS, LIQUID SENSORS <br />AND HYDROSTATIC SENSORS. <br />THE FOLLOWING SENSOR LOCATIONS SHALL BE PROGRAMMED <br />FOR COMPLETE SYSTEM SHUT DOWN: <br /> MECHANICAL LEAK DETECTOR - OMIT <br /> LIQUID DETECTION IN PRODUCT PIPING <br /> LIQUID SUMP SENSORS <br />THE FOLLOWING SENSOR LOCATIONS SHALL SET OFF AN AUDIBLE/VISUAL ALARM <br /> INTERSTITIAL HYDROSTATIC AND VACUUM SENSORS <br /> OVERFLOW PROBE <br /> LOW/HIGH PRODUCT SENSORS <br /> VAPOR PRESSURE SENSORS <br /> VAPOR FLOW METER <br />91 GAS ZONE 4 <br />87 GAS ZONE 1 <br />VAPOR ZONE 2 <br />ELECTRICAL IS PROVIDED <br />TO THE DISPENSER BY AN <br />OFFSET IN THE SUMP. <br />DISPENSER SUMP <br />DOUBLE WALL <br />SUMP LIQUID SENSOR <br />PLACED AT BOTTOM OF <br />SUMP <br />41 <br />DIESEL ZONE 6 <br />91 <br />SUMP DBL WALL, <br />BRINE SENSOR 90 <br />1 1/2" FLEX CONNECTORS <br />44 <br />TEST PORT TYP <br />SUMP FILL PORT FITTING <br />TEST PORT WITH TEST <br />HOSE AND CONNECTION <br />CAP <br />SCALE:3/4" = 1'-0" <br />UDC SUMP MONITORING1 <br />SEE DETAIL 20/FS4 FOR SECTION <br />VENT SUMP SIMILAR <br />NOTE: <br />THE TANK AND THE TANK SUMPS HAVE CALCIUM CHLORIDE IN <br />THE INTERSTITIAL SPACE. <br />CONTRACTOR TO LABEL FILL PORTS WITH TYPE OF FILL. <br />10 <br />VACUUM SENSOR <br />MONITORING ZONES <br />ZONE 1 - 87 - UNLEADED <br />ZONE 2 - VAPOR <br />ZONE 4 - 91 UNLEADED <br />ZONE 5 - 91 VENT <br />LENGTH OF <br /> ZONE <br />360 <br />372 <br />365 <br />44 <br />ZONE 7 - DIESEL VENT 72 <br />ZONE 6 - AUTO DIESEL 364 <br />ZONE 3 - 87 VENT 65 <br />83 <br />84 <br />84 <br />4 <br />HYDROSTATIC <br />SUMP SENSOR <br />18" min18" min 37'-5 1/2" <br />FOR DEADMEN AND <br />STRAPS SEE DETAIL <br />- <br />FS6.03 FABRIC LINER IF REQUIRED1'-0"PEA GRAVEL <br />BED <br />81 <br />4" SCHEDULE 40 RISER <br />VEEDER-ROOT <br />INTERSTITIAL SENSOR <br />DROP TUBE WITH <br />OVERFILL VALVE <br />SET AT 95% <br />49 <br />DEFLECTOR PLATE <br />20,000 DIESEL <br />MAG PLUS <br />LIQUID LEVEL <br />PROBE <br />74 <br />DEFLECTOR PLATE <br />82 SUMP PAN SENSOR <br />82 <br />SEE DETAIL 8/FS3.1 FOR <br />EXTRACTOR VENT <br />CONNECTION - ZONE 7 <br />82 <br />91 SUMP PAN SENSOR <br />12 <br />FS4.1 <br />6 <br />FS5.0 <br />8 <br />FS5.0 <br />18" min18" min <br />20 <br />FS4.1 12 <br />FS4.1 <br />18 <br />FS4.1 <br />4" SCHEDULE 40 RISER <br />VEEDER-ROOT <br />INTERSTITIAL SENSOR 81 <br />DROP TUBE WITH <br />OVERFILL VALVE <br />SET AT 95% <br />17 <br />DEFLECTOR PLATE <br />5"1'-0"PEA GRAVEL <br />BED <br />FABRIC LINER IF REQUIRED <br />37'-5 1/2" <br />FOR DEADMEN AND <br />STRAPS SEE DETAIL <br />- <br />FS6.035"DEFLECTOR PLATE <br />20,000 87 UNLEADED <br />MAG PLUS <br />LIQUID LEVEL <br />PROBE <br />74 <br />90 <br />91 <br />DOUBLE WALL SUMP SENSOR <br /> SUMP PAN SENSOR <br />TEST PORT BEYOND <br />82 DOUBLE WALL <br />SUMP SENSOR <br />TEST PORT BEYOND <br />82 SUMP PAN SENSOR <br />82 <br />90 <br />91 <br />91 <br />90 <br />90 <br />HYDROSTATIC <br />SUMP SENSOR <br />5 <br />5 <br />5 <br />5 <br />TO <br />DISPENSERS - <br />ZONE 6 <br />TEST PORT <br />SEE DETAIL 8/FS3.1 FOR <br />EXTRACTOR VAPOR/VENT <br />CONNECTION - ZONES 2 & 3 <br />TO <br />DISPENSERS - <br />ZONE 1 <br />82 <br />84VACUUM ZONE <br />SENSOR <br />83VACUUM ZONE <br />SENSOR <br />CARBON CANISTER HAZARD ZONES <br />1/2" = 1'-0"SCALE: <br />4 <br />THE 3 FOOT RADIUS SPHERE IS CLASSIFIED <br />AS CLASS I, DIVISION 1, GROUP D <br />THE 5 FOOT RADIUS SPHERE IS CLASSIFIED <br />AS CLASS I, DIVISION 2, GROUP D <br />LEGEND <br />3'-0" <br />5'-0" <br />3'-0" <br />5'- <br />0 <br />" <br />PRESSURE <br />VENT CAP <br />CARBON <br />CANISTER <br />VAPOR <br />POLISHER <br />ASSEMBLY <br />12'-0" <br />MIN. ABOVE <br />FINISH GRADE <br />HAZARDOUS <br />LOCATION POINT OF <br />ORIGIN FOR CCVP <br />REDUCING TEE <br />2"Ø VENT RISER <br />6 <br />7 <br />7 <br />10 <br />NO BALL VALVES ARE TO BE ARE TO BE INSTALLED ON THE VACUUM LINE HOSES 9
The URL can be used to link to this page
Your browser does not support the video tag.