My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1014
>
2300 - Underground Storage Tank Program
>
PR2500513
>
INSTALL_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2025 8:24:03 AM
Creation date
8/28/2025 4:40:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2025
RECORD_ID
PR2500513
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004333
FACILITY_NAME
Rotten Robbie #69
STREET_NUMBER
1014
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Manteca
Zip
95337
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1014 S AIRPORT WAY Manteca 95337
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />&ƌŽŵ͗dĂŚƚŝĂWĞĂƌĐĞ <br />^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕:ƵŶĞϭϭ͕ϮϬϮϱϮ͗ϰϰWD <br />dŽ͗tͲtYͲKdd>фŽƚƚů͘ŽƚƚůΛǁĂƚĞƌďŽĂƌĚƐ͘ĐĂ͘ŐŽǀх <br />Đ͗,Ͳh^dфƵƐƚΛƐũŐŽǀ͘ŽƌŐх͖ďƌĞƚƚΛĂƌŵĞƌͲŶŽƌŵĂŶ͘ĐŽŵ͖ŚƌŝƐDƵƌƉŚLJфDƵƌƉŚLJΛĐŐƌƐ͘ĐŽŵх͖ZŝĐŚĂƌĚdŚŽŵĂƐ <br />фZdŚŽŵĂƐΛĐŐƌƐ͘ĐŽŵх <br />^ƵďũĞĐƚ͗dĞƐƚEŽƚŝĨLJĨŽƌϭϬϭϰ^ŝƌƉŽƌƚtĂLJͲDĂŶƚĞĐĂ͗DŽŶĚĂLJ͕ϬϲͬϭϲͬϮϱΛϴĂŵ <br />Good afternoon all, <br />Please find attached notification and general contractors’ statement for final ELD testing at the subject <br />site. If you have any questions or concerns, please feel free to reach out via email, phone, or text. <br />The general contractor acknowledges that: <br />• No further ground penetrating work is to be performed, including beautification <br />requirements, atop or immediately adjacent to the UST system after final ELD testing. <br />• ALL tank top trim needs to be completed. <br />• ALL secondaries must be reachable and accessible. <br />• ALL tanks be empty of ballast (water) and must be mopped and dry. <br />If you have any questions or concerns, please feel free to reach out to us. <br />Thank you. <br />Tahtia Pearce <br />ELD Project Coordinator <br />Mobile 916.616.2233 | 916.991.1100 <br />CONFIDENTIALITY NOTICE: The contents of this email message and any attachments are intended solely for the addressee(s) and <br />may contain confidential and/or privileged information and may be legally protected from disclosure. If you are a client please consider <br />its contents before forwarding to a third party. <br />If you have received this message in error, please (1) do not open any attachments, (2) reply to the sender that you have received this <br />message in error, and (3) delete this message.
The URL can be used to link to this page
Your browser does not support the video tag.