My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2226
>
2300 - Underground Storage Tank Program
>
PR0548528
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 9:41:12 PM
Creation date
8/29/2025 4:52:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0548528
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0000370
FACILITY_NAME
ORLANDOS ESCALON
STREET_NUMBER
2226
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22727016
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2226 JACKSON AVE ESCALON 95320
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if NO tanks gauging equipment is installed, I Yes No N <br /> Do not complete tier`s section if either box is checked. _ <br /> All wiring has been: 1) visually inspected for tanks, breaks and proper entry and 0 ❑ ❑ <br /> termination. and tested for ground faults"? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup IR ❑ ❑ <br /> to ensure that floats move freel , functiona I ly tested, and confirmed a erational? <br /> Was accuracy of system's product level readings tested? ❑ <br /> Was aocuracy of system's water level readings tested? IR ❑ ❑ <br /> Were all probes reinstalled properly? 0 0 ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? 0 ❑ Q <br /> Probe 1D Probe Model Tanks Monitored Pass Fail <br /> TI Mag Plus Regular ® ❑ <br /> T2 Mag Plus Premium 19 ❑ <br /> T3 Mag Plus Diesel 0 ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> - ❑ ❑ <br /> 9. COMMENTS <br /> Describe all answers marked "No"or"Fail"and proposer{remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Page 5of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.