My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
330
>
2900 - Site Mitigation Program
>
PR0518922
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 11:43:10 AM
Creation date
9/9/2025 2:07:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518922
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0014223
FACILITY_NAME
HESS DUBOIS (FORMER)
STREET_NUMBER
330
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95203
APN
13708001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
330 W HARDING WAY STOCKTON 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE HEALTH AND SAFETY PLAN <br /> PROJECT: FORMER HESS DUBOIS CLEANERS <br /> PROJECT NO: 17-4073 <br /> STREET ADDRESS: 348 WEST HARDING WAY <br /> 1.0. SITE DESCRIPTION <br /> DATE OF WORK: March 2021 <br /> AREA AFFECTED: Entire property <br /> SURROUNDING LAND USE: Commercial/residential <br /> TOPOGRAPHY: Flat <br /> WEATHER CONDITION: TBD <br /> ADDITIONAL INFORMATION: N/A <br /> 2.0. ON-SITE ORGANIZATION AND COORDINATION <br /> PROJECT TEAM LEADER: Evan Schmidt <br /> SITE SAFETY OFFICER: Evan Schmidt <br /> ENVIRONMENTAL CONSULTANT: ADVANCEDGEO, INC. <br /> PHONE: (800) 511-9300 <br /> SUBCONTRACTORS: Slagle Drilling <br /> REGULATORY AGENCY: San Joaquin County Environmental Health <br /> PHONE: 209-468-3420 <br /> 3.0. ON-SITE CONTROL <br /> The Site Safety Officer will coordinate site access control and security. An exclusion <br /> zone will be established approximately 20 feet around excavation location work areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.