My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 7-14-25
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_JTD 7-14-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2025 11:23:45 AM
Creation date
9/11/2025 4:17:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 7-14-25
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />North County RC&SL Public Works/Solid Waste <br />Joint Technical Document County of San Joaquin – Revised July 14, 2025 <br /> <br /> <br />Table 1 <br />Permit Conditions Summary <br /> <br /> <br />Permit Condition Limit <br />Maximum Fill Elevation 320 ft MSL <br />Peak Daily Refuse Disposal 4000 tons per day <br />Maximum Incoming Refuse Vehicles 1200 per day <br />Operating Hours (during which <br />refuse may be received at the facility) <br />Between <br />6:00 AM and 5:00 PM <br />Use of heavy equipment for the <br />disposal and cover of received refuse <br />(noise impact) <br />Between <br />5:30 AM to 7:00 PM. (Note 1) <br />Treated Wood Waste Included as Identified in <br />WDRs Adopted January 2010 <br /> <br />Notes <br /> <br />MSL = Mean Sea Level <br /> <br />1. To the greatest extent possible, maintenance of the facility requiring <br />the use of heavy equipment outdoors will be performed during this <br />time. Some activities, such as the installation of new liners below <br />existing grade, will provide shielding due to their location, and can <br />be performed at other times (See Final 2006 EIR Page 3-2 et seq. <br />for clarifications of site use). <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.