Laserfiche WebLink
Re-Revised Groundwater Monitoring Well Construction <br /> Workplan <br /> August 2023 <br /> MW-203A through D will be outfitted with transducers and telemetry to measure groundwater <br /> levels. The measurements will be reported to DWR's Monitoring Network Module. Water <br /> quality samples may be collected from the monitoring wells,but a schedule has yet to be <br /> established. <br /> GEI Consultants, Inc. 16 <br />