My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LEHMAN
>
3514
>
2900 - Site Mitigation Program
>
PR0546663
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 11:19:03 AM
Creation date
9/16/2025 7:52:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546663
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0026485
FACILITY_NAME
BANTA CARBONA IRRIGATION DISTRICT
STREET_NUMBER
3514
Direction
W
STREET_NAME
LEHMAN
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25505001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3514 W LEHMAN RD TRACY 95304
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Re-Revised Groundwater Monitoring Well Construction <br /> Workplan <br /> August 2023 <br /> Once the upper bentonite annular seal has hydrated, a a .,,,,,, lar-seat -neat cement sanitary <br /> seal will be placed in the annular space,,in one continuous pour using a tremie pipe, between the <br /> top bentonite seal to ground surface. <br /> The top of the wells will be secured with lockable plugs, within an above-grade steel locking <br /> enclosures and by 2-foot-square concrete pad surrounded by four steel bollards. Each well casing <br /> will be properly permanently marked with the well identification number. <br /> The site geologist will record groundwater elevations from each well following drilling <br /> operations and surveying. <br /> Well Development <br /> DWR will oversee and document monitoring well development activities. Each monitoring well <br /> will be developed initially by the driller using a surge block and pumping to immediately begin <br /> to clear up the wells and clean up the borehole wall from the drilling process. The wells will be <br /> further developed using the air-lift development method. Accumulated sediments in the well <br /> bottom will be removed via bailing. Wells will be subsequently developed using a pump with <br /> additional surge block until turbidity in the purge water is sustained below 5 NTU during <br /> pumping. Well development efforts will be recorded including volume of water and debris <br /> removed, and general parameters including temperature, conductivity,pH, and total volume <br /> pumped throughout the development process. <br /> Groundwater Quality Sampling <br /> Groundwater quality sampling of the monitoring wells will occur after the monitoring wells are <br /> constructed and analyzed for general minerals, nitrate, and drinking water metals. The samples <br /> will be analyzed by a California ELAP certified laboratory. Samples will be collected after <br /> purging the well until field parameters stabilize. Purge water will be placed in the adjacent <br /> former BCID canal. <br /> Surveying <br /> After completion of the monitoring wells, their location and reference point at the top of each <br /> well casing will be surveyed by a California licensed Professional Surveyor. Reference point <br /> elevations for the top of casings were surveyed to the nearest 0.01 foot relative to the North <br /> American Datum, 1983 (NAD83) State Planes Zone II (US Foot) for well location coordinates, <br /> and vertical datum North American Vertical Datum, 1988 (NAVD88). <br /> GEI Consultants, Inc. 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.