Laserfiche WebLink
r '1 <br /> AKE OF A F'ED <br /> PENALTIES. <br /> REPORTTRAIN SIGHT <br /> ING TO 111 <br /> HANDLE ANY , <br /> FOR QUESTIONS <br />(916) 206 -1045 �, 1 <br /> 31"Y workers <br />�f the truk who hav Monitor Well Construction Proposal -DVBE Suppliers Estimate <br /> c 1 <br /> drivers wh, DWR State of California -Tracy - MW-203 <br /> ly signing below, I afE Item Unit <br /> Number Description Units Amount Price Total <br /> Cal Sierra l <br /> Print Nan 1.) 2-1/2" SCH80 BLANK 1U FLUSH THRD PIPE Feet 2460 $ 10.26 $ 25,239.60 <br /> i, <br /> 2.) 2-1/2" SCH80 PERF 10' FLUSH THIRD PIPE Each 160 $ 14.92 $ 2,387.20 I ^ <br /> 8% Sales Tax Lump 1 $ 2,210.14 $ 2,210-14 <br /> Preferred Pump Invoice 3.) SCH 80 2-1/2" FEMALE CAP Each 4 $ 20.82 $ 83.28 <br /> t� 8% Sales Tax Lump 1 $ 83.28 $ 6.66 <br /> >� Preferred Pump Invoice 756.00 j <br /> 5.) Centralizer 2.5"X16"SS (3 bows) Each 35 $ 21.60 $ ) <br /> Lump 1 $ 60.48 $ 60.48 I <br /> 1" <br /> �e 8% Sales Tax c l / )�c ) <br /> ,e Silica Resources. Inc. Ton 475 $ 13681 $ 6,498.48 <br /> 6.) DRIED #8 (8X16) . . <br /> Lump 1 $ 519.88 $ 519.88 <br /> 8% Sales Tax <br /> Mitchel Lewis 6 Staver Bags 588 $ 16.63 $ 9,778.44 <br /> 7.) Hole Plug 3/8"50# <br /> Lump 1 $ 782.28 $ 782.28 <br /> 8% Sales Tax 'I <br /> Eaton Fabrication Each 1 $ 2,107.71 $ <br /> 2,107.71 <br /> 18" WELL VAULT <br /> g,) <br /> Lump 1 $ 168.62 $ 168.62 <br /> y�� 8% Sales Tax <br /> 42.00 <br /> Pad_ Per Foot 20 $ 2.10 $ II <br /> 9.) 2x6 Douglass Fir 3.36 <br /> r Lump 1 $ 3.36 $ <br /> 8% Sales Tax Lump 1 $ 0.42 $ 0.42 <br /> 10.) California Lumber Fee I <br /> Each 26 $ 9.52 $ 247.52 <br /> Pad l <br /> 11.) 60 lbs. Concrete Lump 1 $ 19.80 $ 19.80 <br /> 8% Sales Tax <br /> 12.) Mitchel Lewis & Staver <br /> Each 27 $ 75,91 $ 2,049.57 <br /> Pelplug 50# bucket Lump 1 $ 163.97 $ 163.97 <br /> I� <br /> 8% Sales Tax <br /> $ 53,125.40 <br /> Total to Complete Project as Prop <br /> posed (Items 1 thru 13) $ 2,656.27 <br /> D $ <br /> 55,781.67 <br /> DVBE Markup <br /> Total to Project wi th DVBE Markup <br /> Complete p <br /> IF <br />