Laserfiche WebLink
Groundwater Monitoring Well Construction Workplan <br /> January 2024 <br /> positioned to track groundwater level changes and inform the GSAs if lowering of groundwaters <br /> could affect agricultural well owners whose wells depths range from 277 to 800 feet bgs. <br /> The screens of MW-2041), the deepest monitoring well, will be positioned in an fresh water <br /> aquifer above the base of fresh water to detect changes in groundwater levels and salinity and to <br /> evaluate whether pumping may be causing upwelling of saline water from the underlying marine <br /> sediments. <br /> MW-204A through D will be outfitted with transducers and telemetry to measure groundwater <br /> levels. The measurements will be reported to DWR's Monitoring Network Module. Water <br /> quality samples may be collected from the monitoring wells, but a schedule has yet to be <br /> established. <br /> GEI Consultants, Inc. 17 <br />