My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP TURNPIKE
>
2546
>
2900 - Site Mitigation Program
>
PR0547076
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 12:29:42 PM
Creation date
9/16/2025 2:40:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0547076
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0026694
FACILITY_NAME
2546 FRENCH CAMP PHASE II
STREET_NUMBER
2546
STREET_NAME
FRENCH CAMP TURNPIKE
City
STOCKTON
Zip
95206
APN
165261260
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2546 FRENCH CAMP TURNPIKE STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> Sub: Boring Permit Application—2546 French Camp Turnpike, Stockton, CA <br /> A Phase II Subsurface Investigation Proposal dated September 20, 2021, proposing the field <br /> activities to collect groundwater samples from three soil borings was prepared by Fulcrum <br /> Resources Environmental. The objective of drilling and sampling of groundwater in the soil <br /> borings is to investigate subsurface conditions at the subject property. The proposed soil <br /> boringlocations are shown on Figure 1. <br /> Direct push drilling equipment will be utilized to advance borings to 3 feet below first <br /> groundwater at approximately 25 feet (bgs). Borehole groundwater samples will be <br /> collected via temporary monitoring wells using dedicated Teflon and Masterflex tubing and <br /> a low-flow peristaltic pump. Following collection of samples, all boreholes will be backfilled <br /> with neat cement, using a tremie if over 30 feet, and restored to pre-drilling condition by <br /> applying patching materials. <br /> Should you have any questions, please feel free to contact Mr. Forest Kan at <br /> forest@frenviro.com. <br /> Sincerely, <br /> Forest Kan <br /> Staff Geologist, Fulcrum Resources Environmental <br /> ATTACHMENT <br /> FIGURE 1 SITE MAP WITH PROPOSED LOCATIONS <br /> • — �r Fulcrum Resources Environmental <br />
The URL can be used to link to this page
Your browser does not support the video tag.