My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2025 11:49:12 AM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Working around Heavy Equipment Be aware of the potential for ticks,stinging/biting insects(e.g.bees),and poisonous plants.Steer clear if <br /> observed.Wear long pants and long sleeves. <br /> See:C.2. SAFETY EQUIPMENT LIST; D.1 BASELINE HAZARD PREPAREDNESS; D.8 CONSTRUCTION, <br /> HEAVY/LIFT EQUIPMENT; PART E AIR MONITORING, EXPOSURE MONITORING <br /> d.Well Maintenance - Exposure to potentially hazardous Wear level D PPE when handling soil or water.Wear proper PPE around heavy equipment,including a <br /> soil,water,and vapors jackhammer,operated on-site and communicate with operators.Wear proper PPE when using hand and/or <br /> - Working around heavy equipment power tools. Be mindful of musculoskeletal fatigue. <br /> - Working with hand tools and power See:C.2. SAFETY EQUIPMENT LIST; D.1 BASELINE HAZARD PREPAREDNESS; D.5 HAND TOOLS; D.6 <br /> tools POWERED TOOLS&EQUIPMENT; D.10 ELECTRICAL WORK TASKS; PART E AIR MONITORING, <br /> - Musculoskeletal hazards EXPOSURE MONITORING <br /> 4. ONSITE CHANGES, UNFORSEEN HAZARDS,THA"ADJUSTMENTS" (Recognized During Mobilization/Execution of Field Work) <br /> Date: Notes: <br /> Date: Notes: <br /> Project/Task Name: Well Maintenance THA ver.4.0 <br /> Geosyntec° THA Date:4/17/25 Page 3 <br /> consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.