Laserfiche WebLink
Falls into excavations • Sloping/shoring/trench box for excavations>5'when persons enter trench/excavation. <br /> Utility-related hazards • Sloping/shoring/trench box for shallow(<5')trench/excavation with cave-in hazard. <br /> Undermining structures& • Workers in trenches shall be within 25 feet of ladder or sloped entryway. <br /> foundations . Excavations shall be protected by perimeter fencing(not barricade tape),if potential for personnel to fall into. <br /> • If potential for atmospheric hazard,see D.12."Confined/Enclosed Spaces" <br /> HSE Program Documents:HSE SOP-432:Excavation and Trenching Activities <br /> FORKLIFT ❑In addition to general safety practices for heavy equipment(above),as applicable: <br /> Hazards: E • Qualified operator,per established forklift training(certificate is required);Geosyntec operator must be <br /> Struck-by approved by Director of Health and Safety. <br /> Run over/roll over/tip over E • Equipment inspected daily and documented on Forklift Preoperational Inspection Checklist. <br /> Overhead utilities/obstructions E . Do not exceed lifting load limits. <br /> Caught between(pinch points) • Forklift shall not be moved/driven with empty forks in raised position. <br /> Unstable/falling loads . When not in use,forks lowered,brake set,controls in neutral,key removed. <br /> Elevated forks <br /> -Fluid leaks <br /> HSE Program Documents:HSE SOP-436:Safe Operation of Forklifts and Mobile Equipment <br /> AERIAL BOOM/SCISSOR LIFT ❑Follow safe work practices: <br /> Hazards: E • Operators shall be appropriately trained and certified. <br /> Falls from basket '• • Equipment is inspected after mobilization and is in good condition. <br /> Overhead utilities/obstructions . Harness&lanyard worn when operating a boom lift(optional for scissor lift). <br /> Struck-by,run over,tip over E • Overhead hazards and surface obstructions shall be reviewed with operators/riders prior to use. <br /> Caught between(pinch points) <br /> Tip over <br /> Fluid leaks. HSE Program Documents: HSE SOP-650:Manlifts and Aerial Lift Platforms(safe operation of mobile equipment) <br /> CRANES ❑In addition to general safety practices for Operation of Heavy Equipment(above),as applicable: <br /> Hazards: • Only qualified persons operate cranes(certificate required). <br /> — electrocution by overhead utility . Critical Lift Plan&Checklist prepared/executed(See Procedure)prior to mobilization. <br /> — injury in swing radius • Equipment shall be inspected prior to mobilization and daily by crane operator. <br /> — injury from falling load . Crane operator will remain at the controls at all times during operation. <br /> — crane tipping over due to • Crane operation must be performed under the direction of an a <br /> overbalancing,high winds, p p appointed signal person at all times using hand <br /> unstable ground,unsafe slope, signals and/or voice/radio communication. <br /> bad placement of outriggers • Crane shall be level and stable(solid ground or crane mats/timbers,outriggers if present,cribbing);over- <br /> injury from mechanical hazards reaching or exceeding load limits is prohibited. <br /> • Keep area beneath suspended loads clear of personnel;tag lines used to maneuver load. <br /> • Rigging procedures—see Mechanical Lifts with Rigging,below. <br /> MECHANICAL LIFTS WITH RIGGING E ❑In addition to general safety practices for Operation of Heavy Equipment and Cranes(above),as applicable: <br /> Applies to lifting by rigging attached E • Slings,chains,rope,wire rope,as well as sheaves,boom and attachments used for lifting/hoisting shall be <br /> to crane,truck mounted boom rig maintained in good condition,inspected daily,and used/stored in a manner as to protect from damage. <br /> (e.g.drill rig),heavy equipment, • Coordinate lifting operations with competent person. <br /> mechanical/electrical hoist,similar . Do not exceed loading limits of lifting equipment;perform work in accordance with equipment load chart. <br /> equipment. • Hooks will be equipped with safety latches. <br /> Hazards: . Ensure anchor points for winch or other lift device(such as davit arm)are engineered for intended use. <br /> —Mechanical hazards, . Ensure personnel are not positioned beneath elevated loads and that to lines are used where a <br /> —Elevated loads p p g appropriate. <br /> ® WARNING! Confirmed or possible ❑Follow safe work practices per D.11."Utility-Related Hazards" <br /> close proximity to OVERHEAD or <br /> UNDERGROUND UTILITIES. HSE Program Documents:HSE SOP-434a:Overhead and Underground Utility Hazards(US-onlvl <br /> DEMOLITION ❑Develop/implement a demolition safety plan. <br /> BLASTING,UNEXPLODED E ❑Develop/implement safety plan for blasting,unexploded ordnance,as applicable. <br /> ORDNANCE HSE Program Documents:HSE SOP-622:Blasting&Use of Explosives <br /> PUBLIC AT RISK,SITE SECURITY ❑During site operations protect public(overhead protection,fencing,barriers,warning signs). <br /> ❑During off hours,protect public with fencing,barriers,warning signs/lights,other measures as appropriate. <br /> ❑Lock/secure hazardous materials and/or equipment. <br /> D.9. STORAGEMANDLING OF BULK MATERIALS(for Chemical storage,see D.14&15) ® Applicable ❑ Not Applicable, Not Anticipated <br /> Site-Specific Notes&Clarifications: Excavated material from well box replacements will be containerized as investigation-derived waste and temporarily stored <br /> on site.It will then be disposed of according to site-specific monitoring program procedures. <br /> ® BULK STORAGE HAZARDS: ®Store materials in stable manner(stacked,racked,blocked,interlocked,tied,wrapped,or otherwise <br /> secured)to prevent tipping,sliding,rolling,falling or collapse. <br /> ❑Do not exceed load limits and ensure storage structure is stable,robust,secure for intended load. <br /> aGeosyntec° Project/Task Name: Well Maintenance THA ver. <br /> consultants THA Date:4/17/25 Page 11 <br />