Laserfiche WebLink
Geosyntec° <br /> consultants <br /> Geosyntec HSE Procedures referenced herein are available on Geosyntec's TASK HAZARD ANALYSIS <br /> HSE SharePoint site and should be consulted,as appropriate,to ensure (ver.4.0,9-8-2023) <br /> requirements are met.This THA has been prepared per"HSE STD-105,Proiect <br /> Safety Management Handbook" <br /> Part A-PROJECT/TASK INFORMATION <br /> Project/Site Name: Rough and Ready Island Project Number/Org: WR2501 E <br /> Site Address: Rough and Ready Island,Port of Stockton,California <br /> Task&Worksite A private utility locator will conduct a utility survey near the proposed well locations to ensure they are free from utility <br /> Description: conflicts. <br /> A hollow stem auger rig will be used to install wells throughout the site.Boring will be hand augered to 5ft bgs,then <br /> drilled to total well depth.Soils will be logged by Geosyntec field staff.They will then be developed with a combination of <br /> surging,bailing,and purging until the water parameters have stabilized.Soil cuttings and water generated during this <br /> process will be stored in 55-gallon drums and temporarily stored on-site.All investigative-derived waste(IDW)generated <br /> will be removed off-site and disposed of by American Integrated Services of Wilmington,California(AIS). <br /> Wells will be destroyed,as needed,by overdrilling using hollow stem auger drilling methods.All investigative-derived <br /> waste(IDW)generated will be removed off-site and disposed of by American Integrated Services of Wilmington, <br /> California(AIS). <br /> Geosyntec Personnel: Name Office Phone Cell Phone <br /> Site Safety Lead/Officer Morgan Carlson 510-285-2747 864-354-6248 <br /> Task Technical Lead ...Morgan Carlson................................................................................................................................................510-285-2747...........................864-354-6248....... <br /> ... ........................................................................................................................................ . <br /> .......................... ....... <br /> Project Manager Rosemarie Thomas510-285-2795 603-533-1917 <br /> ... ........................................................................................................................................ ............... ....... ....... <br /> Project Director Anju Wicke510-285-2703415-720-3320 <br /> Local HSE Coordinator ...Jason Gross....................................................................................................................................... 510-285-2745............... .......626-321-5954....... <br /> Regional HSE Manager ....Madison McLaughlin................................................................................................................ 858-674-6559............... ........951-990-2888....... <br /> ----- ...................................................................................................................................................................................................................................................................................................... <br /> Corporate HSE Director Bob Poll 813-379-4420 813-240-9231 <br /> On-Site ® Applicable; provide company name,work task and contact information for each Geosyntec <br /> Subcontractor(s): subcontractor below: <br /> ❑ Not Applicable Penecore Drilling 530-661-3600 <br /> Client, Contact(s): Jason Cashman 530-661-3600 <br /> ETHICS POINT HOTLINE US&Canada:844-231-3371 Australia:800-551-155 or 800.811.011 <br /> UK:800-89-0011 or 800-89-0011 Ireland:800-222-55288 or 800-500-000 <br /> Part 8 - EMERGENCY RESPONSE and FIRST AID <br /> IMPORTANT:After initial emergency response actions and incident stabilization,contact appropriate project staff and/or HSE personnel listed in Part A <br /> Site-Specific Notes, Clarifications:The work area is located behind a TWIC access gate.The work areas are within the larger Port of Stockton <br /> (Site),which includes various commercial/industrial tenants with various operations.Former historical use of the Site varies depending on the area and include <br /> but are not limited to former hazardous material storage areas,landfill areas,and USTs. <br /> Emergency Communication/Alerting ®Verbal ®Cell Phone ❑Land Line ❑2-Way Radio ❑Satellite Phone ❑On-site alarm/signal system <br /> ❑Other: <br /> To Summon Police,Fire,Ambulance ®DIAL 911,for external responders ❑Other: <br /> WorkCare(for non-emergency injuries) 24/7:888-449-7787 <br /> Other Emergency Contacts(such as Port Police—209-937-8271 <br /> security,spill responder,utility-related): <br /> Nearest EMERGENCY ROOM Medical Hospital Name:St.Joseph's Medical Center <br /> .... <br /> Services Address:1800 North Carolina Street,Stockton,CA 95204 <br /> ----------------------------------------------------------------------------------------------------........................................................................................................ <br /> Phone#:209-943-2000 ®See ATTACHMENT A,ROUTE to HOSPITAL <br /> Emergency Evacuation-Route, Safely leave Site/work area and meet at Valero gas station parking lot(1789 West Charter Way,Stockton,California) <br /> Rally/Muster Point,Shelter Location(s) and contact/locate all site workers/field staff. <br /> EMERGENCY and FIRST AID EQUIPMENT required for this work task is listed in PART C.2.—SAFETY EQUIPMENT LIST <br /> Attachment A: Route to Hospital <br /> Attachment B: Site Map <br /> Geosynte& Task/Project Name:Well Install, Development,and Destruction <br /> THA Date:04/17/2025 Page 1 <br /> consultants <br />