Laserfiche WebLink
PNEUMATIC/HYDRAULIC HAZARDS I ❑Never direct outlet nozzle toward body;use guards,restraints,engineering controls as appropriate. <br /> ❑Air compressor ❑ Never use compressed air for cleaning clothes you are wearing. <br /> ❑Compressed air system ❑ If compressed air is used for cleaning,restrict pressure to 30 psi or below,equip nozzle with chip guard. <br /> El High-pressure liquid ElUse PPE for eye(goggles or face shield)/hand/head/hearing/skin protection,as appropriate for the hazard. <br /> ❑Pressurized steam ❑ Ensure tank,hoses,fittings are in good repair using factory fittings,equipped with whip-checks. <br /> (For compressed gas cylinders,see ❑ If pressure relief device poses a hazard to workers,reconfigure or shield device or restrict access by workers. <br /> D.14."Commercial Chemical <br /> Products") <br /> PORTABLE HEATER ❑Follow general safety practices for Operation of Equipment/Machinery(above),and as follows: <br /> ❑electric • Keep heater dry and locate heater on level surface away from high traffic areas to prevent tipping. <br /> ❑fuel-powered • Never use fuel-powered heaters indoors,or near air intake vents,due to carbon monoxide hazard. <br /> Hazards: • Provide ventilation and/or air monitoring where hazardous accumulation of exhaust emissions is possible. <br /> Shock(electrical) • Keep combustible materials at least 3 feet from hot surfaces. <br /> Carbon monoxide emissions and • Plug electric heaters directly into wall outlet(don't use extension cord or power strip). <br /> fuel-related fire hazards(fueled) ` • For electric heaters,see D.10.,"Electrical Work Tasks." <br /> Fires/burns from hot surfaces. • Shut down fuel-powered equipment before refueling;see safe practices for flammable/combustible liquids <br /> and/or compressed gases in D.14."Commercial Chemical Products." <br /> LOCKOUT/TAGOUT(LO/TO)OF E ❑Prepare site-specific written LO/TO program,and equipment-specific written LO/TO procedures(as <br /> HAZARDOUS ENERGY To prevent applicable);implement control procedures for hazardous energy sources,provide locks/tags,train workers, <br /> unplanned equipment start-up or designate"authorized"personnel,notify"affected"personnel. <br /> release of energy when under <br /> maintenance/repair. <br /> HSE Program Documents:HSE STD-125:Personal Protective Equipment Program,HSE STD-135:Hearing Protection Program,HSE STD-150:Globally Harmonized <br /> System for Hazard Communication(for fuel),HSE SOP-460:Field Site Exposure Monitoring,HSE SOP-452a:Lock-out/Tag-out(North America-only),HSE SOP-454a: <br /> General Electrical Safety(US-only),HSE SOP-642:Powered Hand Tools,HSE SOP-654:Welding,Cutting and Other Hot Work <br /> D.7. DRILLING (Test Boring,Direct Push,Construction Drilling) Applicable ❑ Not Applicable, Not Anticipated <br /> Site-Specific Notes&Clarifications: Geosyntec will defer to drilling subcontractor for safety precautions around the drill rig and heavy equipment.Geosyntec <br /> will not operate the drill rig or heavy equipment.Monitor breathing zone with PID,see E1. <br /> ® DRILLING&DIRECT PUSH <br /> Includes hazards posed by drilling rig ®Follow safe work practices,as applicable: <br /> and associated equipment,heavy • Non-drilling personnel shall stay clear of drilling work zone when drill rig in operation. <br /> support vehicles,trailer/towing • Equipment shall be maintained in good repair,inspected daily upon mobilization;backup alarms and <br /> hazards,and similar mobile emergency stop operational,machine guards in place,whip checks on high pressure lines. <br /> equipment. • Leaks or defective safety equipment will be repaired before use. <br /> • Establish eye contact with operator and use hand signals prior to approaching the rig. <br /> Hazards: • Use PPE near operating rig(eye/head/hearing/hand/foot protection,high visibility vests or equivalent). <br /> Struck-by equipment • Arrange personal/support vehicles to protect drill team and not obstruct travel lanes or other operations. <br /> Run over,roll-over • Operators/helpers must maintain safe distance from moving parts;secure loose hair/clothing,equipment. <br /> Caught between(pinch points) • Drill rigs will only be moved with masts lowered. <br /> Manual lifting,musculoskeletal • Maximum safe slope for rig will be followed,drill rig leveled,appropriate blocking/cribbing as needed. <br /> Fuel/fluid leaks,fuel hazards • Use safe practices for fuel handling/storage/transport;spill equipment available for fuel/fluid leaks. <br /> Suspended equipment • Ventilate exhaust and conduct air monitoring,as appropriate,when drilling indoors. <br /> Roadway hazards. • Never climb drill mast without appropriate fall protection. <br /> • Use precautions for overhead and underground utilities <br /> ® MECHANICAL LIFTING,RIGGING ®In addition to general drilling&direct push safety practices(above),as applicable: <br /> Applies to lifting truck-mounted boom . Slings,chains,rope,wire rope,as well as sheaves,boom,and attachments used for lifting/hoisting shall be <br /> rig(e.g.,drill rig),and all other drilling- <br /> maintained in good condition,inspected daily,and used/stored in a manner as to protect from damage. <br /> related mechanical/electrical hoist • Do not exceed loading limits of lifting equipment;perform work in accordance with equipment load chart. <br /> equipment. • Hooks will be equipped with safety latches. <br /> Hazards: • Ensure anchor points for winch or other lift device are engineered for intended use. <br /> Mechanical hazards • Ensure personnel are not positioned beneath elevated loads. <br /> Elevated loads <br /> ® WARNING! Confirmed or possible ®Follow safe work practices per D.11."Utility-Related Hazards." <br /> close proximity to OVERHEAD or <br /> UNDERGROUND UTILITIES. <br /> HSE Program Documents:HSE SOP-430:Drilling Activities,SOP-434x:Overhead and Underground Utility Hazards(US-only), <br /> HSE SOP-644:Working Around Heavy Equipment, <br /> D.8. CONSTRUCTION, HEAVY EQUIPMENT, LIFT EQUIPMENT ® Applicable ❑ Not Applicable, Not Anticipated <br /> Site-Specific Notes&Clarifications: Geosyntec will defer to drilling subcontractor for safety precautions around the drill rig.Geosyntec will not operate the drill <br /> rig.Heavy equipment in operation throughout the Site.Field team should be aware of heavy equipment activity in the area. <br /> aGeosyntec° Project/Task Name:Well Install,Development,and Destruction THA ver. <br /> consultants THA Date: 04/17/2025 Page 9 <br />