My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2025 11:49:12 AM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec <br /> consultants <br /> interval and the lithology encountered during the original well installation. The well screen interval <br /> may be slightly adjusted in the field based on lithology encountered. <br /> 2.4 Other Well Maintenance Activities <br /> Other well maintenance activities planned for 2025 include attempting to locate missing wells and <br /> installing a QR code inside the W-341 well box. <br /> In 2023 and 2024, Geosyntec attempted to locate a number of wells denoted as unable to locate or <br /> unable to access (Geosyntec 2024). Following the efforts in 2023 and 2024, a total of 29 wells are <br /> still denoted as missing within RRI (Table 2 and Figure 4). Geosyntec plans to further assess well <br /> locations observed to (1)have previously been reported as destroyed, or(2)be inaccessible due to <br /> equipment parked over well. <br /> Monitoring well locations P-113A,W-238, and W-239,located within an accessible paved portion <br /> of the landfill area, were previously marked as destroyed in the Groundwater Monitoring Annual <br /> Report for 2015 for the West Complex at RRI(Environmental Risk Services 2016),though the date <br /> or record of destruction cannot be found. To ground-truth that the wells are destroyed, the well <br /> locations will be assessed using a handheld GPS operating device with a horizontal accuracy of <br /> one-inch to record field observations of conditions at the surveyed coordinates. Additionally, <br /> monitoring wells W-267 and 120-MW 1 were previously denoted as unable to locate due to <br /> equipment being parked over the well location.Geosyntec plans to use the handheld GPS operating <br /> device to locate the surveyed location of the wells and will coordinate with tenants to remove <br /> equipment (if feasible) as needed. <br /> Geosyntec installed QR codes on wells that were sampled as part of the 2024 groundwater <br /> monitoring scope (Geosyntec 2024). The QR code will be scanned by field sampling technicians <br /> before sampling, and the QR code will direct the field technician to a mobile field application <br /> detailing well identification and well construction information to reduce well misidentification <br /> errors. As part of the 2025 well maintenance activities, a QR code will be installed at W-341 since <br /> it was not accessible during the 2024 deployment. <br /> Additionally, Geosyntec will perform well repairs and well protection measures on an as-needed <br /> basis as determined by field observations. Well repair activities may include replacing missing <br /> vault box bolts;re-tapping the threads on well boxes;replacing missing or damaged well caps; and <br /> replacing well vault boxes that are damaged. Well repair activities will be implemented for <br /> monitoring wells associated with an OU. Well repair activities that require ground disturbance(i.e. <br /> replacing well vault boxes)will not be performed in the Landfill Area due to on-going construction <br /> as described under Section 2. <br /> RRI 2025 Groundwater Monitoring Work Plan 12 May 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.