Laserfiche WebLink
Geosyntec <br /> consultants <br /> 6. REFERENCES <br /> DTSC and CVRWQCB. 2021. Final Remedial Action Plan for Soil, Landfill Area. California <br /> Department of Toxic Substance Control and Central Valley Regional Water Quality Control <br /> Board. September. <br /> Environmental Risk Services.2016.Draft Groundwater Monitoring Annual Report for 2015, West <br /> Complex, Rough and Ready Island, Port of Stockton, California. July. <br /> Geosyntec. 2018a. Groundwater Monitoring Work Plan, Rough and Ready Island, Port of <br /> Stockton, Stockton, California. Geosyntec Consultants, Inc. June 1. <br /> Geosyntec. 2018b. Constituents of Concern Evaluation Report, Rough and Ready Island, Port of <br /> Stockton, California. Geosyntec Consultants, Inc. December 14. <br /> Geosyntec. 2021a. Annual Groundwater Monitoring Report, Rough and Ready Island, Port of <br /> Stockton, Stockton, California. Geosyntec Consultants, Inc. December 17. <br /> Geosyntec. 2021b. Rail Line Area Monitoring Well Destruction Work Plan, Rough and Ready <br /> Island, Port of Stockton, California. Geosyntec Consultants, Inc. April 27. <br /> Geosyntec. 2023. Well Maintenance and Destruction Memorandum, 2023 Plan. Geosyntec <br /> Consultants, Inc. July 12. <br /> Geosyntec. 2024. Final 2022 Limited Soil and Groundwater Investigation: UST 817B. Geosyntec <br /> Consultants, Inc. June 6. <br /> Geosyntec. 2025. Draft 2024 Annual Groundwater Monitoring Report, Rough and Ready Island, <br /> Port of Stockton, Stockton, California. Geosyntec Consultants, Inc. March 6. <br /> Kleinfelder. 1988. Verification Portion of the Confirmation Study/Final Draft Report, Naval <br /> Communication Station, Rough and Ready Island. February. <br /> LANL. 2017.Minimum "No Effect ESL"and 'Low Effect ESL"per analyte for soil, ECORISK <br /> Database V4.1. Los Alamos National Laboratory. <br /> hllp://www.lanl.aov/environmelLt/protection/eco-risk-assessment.php. <br /> PRC. 1994. Results of Investigation for Long-Lived Gross Alpha-, Beta-, and Gamma-Emitting <br /> Airborne Radioactive Particulates. PRC Environmental Management, Inc. August 23. <br /> PRC. 1997a. Basewide Environmental Baseline Survey Report: Naval Communication Station <br /> Stockton, California. PRC Environmental Management, Inc. May. <br /> PRC. 1997b. Comprehensive Long-Term Action Navy(Clean 1): Surface Water and Sediment Site <br /> Investigation Volume 1/ Site Investigation Report. PRC Environmental Management, Inc. <br /> September. <br /> RRI 2025 Groundwater Monitoring Work Plan 18 May 2025 <br />