Laserfiche WebLink
Geos ��� 3043 Gold Canal Drive,#201 <br /> Yn Well Development Field Form Rancho Cordova,California 95670 <br /> consultants PH 916.637.8048 <br /> FAX 916.637.8321 <br /> Well ID: Project Name: Date: / / <br /> Site Location: Initial Depth to Water(DTW)(ft): <br /> Volume of Schedule 40 PVC Pipe <br /> Project No: Initial Total Well Depth(ft BTOC): Well Diameter (inches) gal/linear ft.(I <br /> Date Installed: Well Diameter(inch): 1.0 0.041 <br /> 2.0 0.163 <br /> Screen Interval(ft). Calculated Casing Volume: 3.0 0.367 <br /> 4.0 0.653 <br /> Develop. Operator(s): Final Total Well Depth(ft BTOC): 5.0 1.023 <br /> Field Supervisor: Total Volume removed (gal) <br /> Surging Cycles <br /> Surge Depth to Total Well Starting Ending Interval Total Well Comments <br /> Cycle# Water Depth Time Time Surged Final DTW Depth <br /> 1 <br /> 2 <br /> 3 <br /> 4 <br /> Bailing Cycles <br /> Initial Conditions Ending Conditions Recovery <br /> Bailing Depth to Total Well Starting Ending Gallons Depth to Comments <br /> Cycle# Water Depth Time Time Removed Water Total Depth Time DTW Time DTW (turbidity, etc.) <br /> 1 <br /> 2 <br /> 3 <br /> 4 <br /> Pumping <br /> Pumping Depth to Gallons Turbidity pH <br /> Cycle# Time Water Removed Temp(C) (NTUs) (SU) Cond (mS) Time DTW Time DTW Comments <br /> Notes/Recommendations: <br /> •------------------------------------------------------------------------------------------------------------------------------------------------------------ <br /> -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br />