My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2025 11:49:12 AM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosynte& <br /> consultants <br /> 1. INTRODUCTION <br /> This site-specific Health and Safety Plan(HASP)was prepared to address project-specific hazards <br /> known or suspected to be present associated with the existing conditions and work to be performed <br /> at the work site(s). This HASP was prepared to meet the requirements specified in Occupational <br /> Safety and Health (OSHA) Hazardous Waste Operations Emergency and Response <br /> (HAZWOPER) program, Geosyntec Consultants, Inc. (Geosyntec)'s Health, Safety and <br /> Environmental (HSE) Procedure HSE SOP 301a, and the HSE requirements of the client. <br /> 2. SIGNATURES <br /> 2.1 Preparers and Reviewers <br /> This HASP must be maintained on-site when fieldwork is being performed. The Site Health and <br /> Safety Officer (SHSO) can change or amend this document, in agreement with the Health and <br /> Safety Coordinator (HSC) or Project Manager (PM). Amendments (e.g., changes in personal <br /> protective equipment, addition of tasks, etc.) must be documented in Section 19 in Appendix A. <br /> This HASP must be reviewed and amended on an annual basis for projects lasting more than one <br /> year. <br /> Prepared by: <br /> 4/29/2025 <br /> SHSO—Morgan Carlson Date <br /> Reviewed by: P7_2 <br /> 5/1/2025 <br /> HSC—Jason Gross Date <br /> Approved by: � <br /> �—� 5/30/2025 <br /> Project Manager—Elena Robertson Date <br /> Port of Stockton HASP A-1 05.01.2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.