Laserfiche WebLink
Document Name: Document Revised:13Feb2018 <br /> �r Regulated Soil Checklist Page 2 of 2 <br /> PaceAnalyticai Document No.: <br /> Issuing Authority: <br /> F-MN-Q-338-Rev.06 Pace Minnesota Quality Office <br /> To Be Completed by PM and/or PC: <br /> Sample Analysis to be conducted(circle all that apply): MN X Subcontract Lab <br /> Name of Subcontract Lab(s): <br /> REQUIREMENT ACTION COMPLETED <br /> Permission to ship untreated soil must be Go to:J:\SHARE\PRJ_MGR\10_Client Services Department <br /> on file prior to shipping to any subcontract Documents\Regulated Soils Permits—if permission to ship letter is YES NO N/AX <br /> lab,including IR Pace Labs. not there,contact the Waste Coordinator. <br /> Shipment must include a valid copy of the Is a copy of all needed paperwork included with the COC? Do NOT <br /> receiving lab's permit as well as permission ship samples until all necessary paperwork is compiled. YES NO N/AX <br /> to ship letter. <br /> Comments: <br /> Project Manager Signature: Date: 11/12/19 <br /> i <br /> i <br /> Page 16 of 16 <br />