Laserfiche WebLink
5:23 PM 10/30/2024 1 of 6 <br />Item Quantity (cy) <br />43.1 million <br />41.2 million <br />31.93 Million <br />120,000 <br />115,000 <br />490,000 <br />5.9 million <br />1.25 million <br />7.8 million <br />7.96 million <br />139,000 <br />Notes: <br />1 <br />2 <br />3 <br />4 Berm volume not included in capacity quantities. <br />5 <br />6 Based on placing an additional 3 feet of soil over an assumed existing 2 ft. <br />Based on refuse-to-soil ratio of 5:1. <br />“Fill Capacity” is the volume between the underside of the final cover and the <br />upper surfaces the base liner components. This is the volume available prior to <br />closure, and includes refuse, daily soil cover, and intermediate soil cover. This <br />volume does not include final cover, the operations soil layer at the landfill base, <br />or LCRS drainage materials. <br />“Remaining Fill Capacity” is the volume between the underside of the final cover <br />and the surfaces of existing refuse fill as of 6-07-2024, and the surface of future <br />base liner components. <br />North County Recycling Center and Sanitary Landfill <br />Table 1 <br />VOLUMETRICS <br />Operations soil layer <br />Daily and intermediate soil cover5 <br />Final soil cover for 185 acres6 <br />Total soil needs <br />Soil excavation2 <br />Soil surplus <br />“Total Volume” is the volume between the upper surface of the vertical expansion <br />(Drawing 1) and the base excavations. This volume includes refuse, daily and <br />intermediate soil cover, final cover, and LCRS and operations soil at the landfill <br />base. <br />Total Volume1 <br />Fill Capacity2 <br />Remaining Fill Capacity3 <br />Earthwork <br />Perimeter berm4 <br />Gravel drainage layer <br />N:\1North County\CalRecycle-LEA\JTDs\2024 Rev\Appendices\Appendix B - Closure PCMP\NC PCPCMP 10-30- <br />2024 Table 1