My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD APPENDIX A -L 2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_JTD APPENDIX A -L 2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2025 4:03:22 PM
Creation date
9/24/2025 1:34:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD APPENDIX A -L 2024
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO. R5-2010-0016 -8- <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />NORTH COUNTY LANDFILL <br />SAN JOAQUIN COUNTY <br /> <br /> <br /> <br />a. Monitoring Points <br />Lysimeter Type Location <br />VZ-1 Background Undeveloped area near G-1 <br />VZ-2 Detection SW perimeter Module 1, <br />NW perimeter Module 3 <br />VZ-3 Detection NW perimeter Module 1 <br />VZ-4 Detection Northern perimeter, Module 1 <br />VZ-6, 7 Detection Under Module 4 (western half) <br />VZ- 8 Detection Under Module 4 (eastern half) <br />__________________________________ <br />1. Lysimeters installed in shallow soil beneath lined excavation slopes. <br /> <br />Lysimeter monitoring locations shall also include future lysimeters installed to <br />monitor future expansion modules per WDR Construction Specification D.5.c. <br />Pore liquid monitoring shall also include any lysimeters or other monitoring <br />devices beneath leachate collection sumps. <br /> <br />b. Monitoring Parameters & Schedule <br />The pore liquid monitoring shall be conducted monthly. Any liquid recovered <br />shall be analyzed in accordance with the parameters in Section F.3.c, except <br />that volume of liquid recovered shall be recorded in lieu of elevation. In the <br />event that a release is tentatively indicated, the Discharger shall proceed with <br />confirmation sampling under WDR Monitoring Specification E.27, and follow <br />the Response to Release requirements of the WDRs and SPRR, as indicated. <br />The Discharger shall also consider whether the detection of liquid in the <br />lysimeter constitutes significant physical evidence of a release under WDR <br />Monitoring Specification E.30. <br /> <br />F. GROUNDWATER MONITORING <br />1. Elevation Monitoring (Section 20415(e)(13)) <br />The groundwater surface elevation (in feet and hundredths, MSL) in all wells and <br />piezometers shall be measured on a quarterly basis. Groundwater elevations <br />taken prior to purging the well and sampling for Monitoring Parameters may be <br />used to fulfill this requirement. Groundwater elevations for all monitoring wells for <br />a given groundwater body shall be measured within a period of time short enough <br />to avoid temporal variations in groundwater flow which could preclude accurate <br />determination of groundwater gradient and direction. The results of groundwater <br />elevation monitoring shall be displayed on a water table contour map and/or <br />groundwater flow net for the site and included in each monitoring report. The <br />Discharger shall use the groundwater elevation monitoring data to estimate the <br />following, as feasible:
The URL can be used to link to this page
Your browser does not support the video tag.